Capital Power Corporation · TSX:CPX

Capital Power — Non-Deal Roadshow (March 2010)

32 slides from Capital Power's roadshow presentation, March 2010

  1. Slide 1: Investor Meetings March, 2010

    Investor Meetings March, 2010 Brian Vaasjo, President & CEO Stuart Lee, CFO CONFIDENTIAL

  2. Slide 2: Cautionary statement regarding forward-looking information

    Cautionary statement regarding forward-looking information Certain information in this presentation and in oral answers to questions contains forward-looking information. Actual results could differ materially from conclusions, forecasts or projections in the forward-looking information, and certain

  3. Slide 3: Overview of Capital Power

    Overview of Capital Power ƒ New company formed in July/09 from EPCOR Utilities Inc.’s spin-off of its power generation business ƒ Canadian-based independent power producer (IPP) operating in North America ƒ Business model: stable and growing cash flow from a balanced portfolio of long-term contracts

  4. Slide 4: Corporate strengths

    Corporate strengths One of Canada’s largest IPPs with interests in 31 Large, high quality facilities totaling ~3,500 MW of owned and/or operated generation portfolio generation capacity; geographic, fuel source and counterparty diversification Modern fleet with Average plant availability of 94%(1);

  5. Slide 5: Large, high quality generation portfolio

    Large, high quality generation portfolio Interests in 31 facilities (~3,500 MW) Directly Owned 30.5% LP Interest Alberta Contracted ON/BC Contracted Capital Power Income L.P. Two Facilities Alberta Three Facilities 20 Facilities 820 MW(1) Commercial 80 MW(1) 1,668 MW(1) (820 MW)(2) (80 MW)(2) (472 M

  6. Slide 6: Strategic North American platform

    Strategic North American platform Williams Lake Mamquam Calstock Capital Power facilities Capital Power Income L.P. facilities CONFIDENTIAL 6

  7. Slide 7: Modern fleet

    Modern fleet Modern fleet with average facility age of 12 years; two units commissioned in late 2009 with 390 MW of additional capacity in 2011/13 Facility age (as of December 31, 2009) Genesee 2 Genesee 1 Capital Power Income L.P. Brown Lake Taylor Coulee Joffre Weather Dancer Miller Creek Average

  8. Slide 8: Strong operating history, fleet availability

    Strong operating history, fleet availability Very good operating performance history with high plant availability (1) 12,000 95% 95% 91% 94% 94% 100% 10,000 75% Total 8,000 Plant Generation 6,000 50% Availability (GWh) 4,000 (%) 25% 2,000 - 0% (2) 2006 2007 2008 2009 2010E Capital Power Generation P

  9. Slide 9: Financial strength and access to capital

    Financial strength and access to capital(1) ƒ Strong balance sheet with BBB investment grade credit rating (S&P/DBRS) • $1.2B in credit facilities, of which $1.0B available • Net debt / total capitalization of ~34% (non-consolidated basis) • Consolidated assets of ~$5.0B with only ~$1.7B in long-ter

  10. Slide 10: Strong cash flow generation

    Strong cash flow generation $M (on a de-consolidated basis) $240(1) FFO excluding non-controlling interests in CPILP ~($100) Dividends ~($30 - $40) Average maintenance capex (excluding CPILP) ~($10 - $20) Average other capex (emission credits) ~$80 - $100 Free cash flow Generating significant discre

  11. Slide 11: Financial ratio targets

    Financial ratio targets ƒ Dividend • Consistent with peers in the 60-70% payout ratio over the long term ƒ Debt-to-total capitalization ratio • 40-50% ƒ Funds from operations to total debt ratio • Minimum 20% ƒ Contracted versus merchant operating margin contribution • Minimum 50% contracted CONFIDE

  12. Slide 12: Alberta power prices

    Alberta power prices ƒ Alberta spot power prices of ~$46/MWh in Q4/09 declined 6.5% from Q3/09 ƒ Higher spot pricing in Q3/09 due to a number of significant base load plant outages and derates that constrained supply and caused higher spot prices ƒ $57/MWh captured power price(1) for Alberta commerc

  13. Slide 13: Hedging Alberta spot power price exposure

    Hedging Alberta spot power price exposure Alberta commercial portfolio ƒ Actively manage our position; despite being flat in 2010, there will be some quarterly fluctuations in results depending on the success of our positioning in the quarter substantially sold forward @ ~70% hedged low-$60/MWh @ lo

  14. Slide 14: Hedging update

    Hedging update ƒ Took early view prices would be soft in 2010 and locked in all of our base load length ƒ Continue to have material heat rate upside from our natural gas facilities (~300 MW from Clover Bar and Joffre) ƒ To date, our call on 2010 has been prudent ƒ Increased hedging on base load leng

  15. Slide 15: Hedging update (cont'd)

    Hedging update (cont’d) ƒ May see some level of increased hedging for 2011, but expect to not only carry some open base load into 2011, but also 300 MW of variable length providing lots of capacity to participate in upside ƒ Clover Bar provides significant ability to manage our portfolio • Plant can

  16. Slide 16: Outstanding platform for growth

    Outstanding platform for growth ƒ Pursue selected target markets Development ƒ Numerous development opportunities at various stages ƒ Near term opportunities for contracted cash flows ƒ Very disciplined and patient approach Acquisitions ƒ Focus on large natural gas facilities ƒ 1,066 MW(1) of mercha

  17. Slide 17: Growth development opportunities

    Growth development opportunities Size Estimated Project (MW) Cost ($M) Fuel Location Keephills 3(1) 247.5 $955 Coal AB Quality Wind 142 $455 Wind BC Port Dover & Nanticoke 100 - 110 $340 Wind ON Kingsbridge II 270 $800 Wind ON Pioneer (carbon - TBD Chilled ammonia AB capture & storage) BC Wind 500 $

  18. Slide 18: Keephills 3 construction project

    Keephills 3 construction project ƒ 495 MW coal-fired plant, supercritical boiler technology (same as Genesee 3) ƒ Partnership with TransAlta ƒ Total project cost of ~$1.9B (CPX 50% portion = $955M) ƒ Project currently at peak hired labor (~1,600 workers) ƒ Overall project 84% completed; power island

  19. Slide 19: Quality Wind project

    Quality Wind project ƒ Quality Wind project selected by BC Hydro for the award of an Energy Purchase Agreement (EPA) ƒ 142 MW wind power project ƒ 79 turbines on a site 10 km northeast of Tumbler Ridge, B.C. ƒ Energy generated would be sold under a 25-year EPA with BC Hydro ƒ Commercial operation ex

  20. Slide 20: Quality Wind project (cont'd)

    Quality Wind project (cont’d) ƒ Meets our minimum 9% hurdle rate (unlevered, after-tax IRR) for contracted facilities ƒ 5-year wind study used in evaluating project; 35% expected capacity factor ƒ Low construction risk ƒ Majority of construction costs are turbine-related, which have been conditional

  21. Slide 21: 2010 Corporate priorities

    2010 Corporate priorities ƒ Operational targets • Plant availability of ≥ 94% • Sustaining capex of $60M (includes $20M for emissions credits) ƒ Construction / development objectives • CPC’s share of final costs for Keephills 3 project at ≤ $955M with completion by Q2/11 • Commit at least $500M to c

  22. Slide 22: Investment summary

    Investment summary ƒ Positive long-term fundamentals for the Alberta power market • Demand expected to increase in 2011 from oil sands investment activity • Retirement of capacity on Alberta electricity grid positive for creation of new generation capacity • Alberta power prices expected to be among

  23. Slide 23: Appendix

    Appendix • Q4/09 results • Board of Directors • Non-GAAP financial measures CONFIDENTIAL

  24. Slide 24: Q4/09 - Corporate updates

    Q4/09 - Corporate updates ƒ Operating performance in line. Q4/09 and H2/09 operating performance in-line with management’s expectations • 92% average plant availability in Q4/09, including scheduled outage at Genesee 1 ƒ Development on track. Construction activity continues to meet milestones, and d

  25. Slide 25: Q4/09 Operating performance

    Q4/09 Operating performance Q4, 2009 Plant Generation Availability (Gwh) Alberta commercial plants Genesee 3 99% 484 Joffre 94% 73 Clover Bar Energy Centre(1) 98% 9 Taylor Coulee Chute 66% 2 Clover Bar Landfill Gas 94% 10 Weather Dancer 0% - 97% 578 Alberta contracted plants Genesee 1 74% 618 Genese

  26. Slide 26: Financial highlights – Q4/09

    Financial highlights – Q4/09 ($M, except earnings per share) Q4/09 Q3/09 Change Revenues $497 $511 2.7% Gross margin (excluding fair value changes)(1) $182 $189 3.7% Operating margin(1) $154 $169 8.9% Net income $7 $14 50% Earnings per share (normalized)(1) $0.18 $0.42 57% Funds from operations $71

  27. Slide 27: Financial outlook

    27 Financial outlook 2010 vs. 2009 ƒ Sale of remaining 15% interest of Battle River PPA in Jan/10 ƒ Higher operating margin (excluding fair value adjustments) from full year of operation of Clover Bar units 2 and 3 ƒ Higher captured power price for Alberta commercial portfolio as a significant porti

  28. Slide 28: Experienced board of directors

    Experienced board of directors Donald Lowry ƒ President and CEO of EPCOR and Chairman of EPLP Chairman, EPCOR Nominee ƒ Director of Canadian Oil Sands Trust ƒ Former President and COO of TELUS Hugh Bolton ƒ Non-executive chair of the Board of Directors of EPCOR EPCOR Nominee ƒ Chairman of Matrikon;

  29. Slide 29: Non-GAAP financial measures

    Non-GAAP financial measures The Company uses (i) gross margin, (ii) operating margin, (iii) funds from operations, (iv) funds from operations excluding non-controlling interests in CPILP and (v) normalized earnings per share as financial performance measures. These terms are not defined financial me

  30. Slide 30: Non-GAAP financial measures (cont'd)

    Non-GAAP financial measures (cont’d) Prior to the third quarter of 2009, the Company used adjusted earnings before foreign exchange gains and losses, interest, income tax, depreciation and amortization and impairments (adjusted EBITDA) to measure plant operating performance. Commencing with the thir

  31. Slide 31: Non-GAAP financial measures (cont'd)

    Non-GAAP financial measures (cont’d) Normalized net income and normalized earnings per share The Company uses normalized earnings per share to measure performance by period on a comparable basis. Normalized earnings per share is based on net income according to Canadian GAAP adjusted for items that

  32. Slide 32: Contact information

    Contact information Investor Relations (780) 392-5305 (866) 896-4636 (toll-free) investor@capitalpower.com www.capitalpower.com CONFIDENTIAL 32

Capital Power — Non-Deal Roadshow (March 2010) on 6ix