  1. Slide 1: Q4 & Full Year 2014 Production Results

    Q4 & Full Year 2014 Production Results January 2015 www.argonautgold.com / TSX: AR

  2. Slide 2: Forward Looking Information

    FORWARD LOOKING INFORMATION This presentation contains certain “forward-looking statements” and “forward-looking information” under applicable Canadian securities laws concerning the proposed transaction and the business, operations and financial performance and condition of Argonaut Gold Inc. (“Arg

  3. Slide 3: Who is Argonaut?

    Who is Argonaut? Gold Resource Distribution 500 Production (Thousand ounces) 400 300 Canada 36% 490 Mexico 200 64% 100 150 0 Current Capability Potential Core Values/Foundations  America’s Focused, Favorable Jurisdictions(1) Canada (#2) and Mexico (#5) ranked as top mining jurisdictions  Leverage

  4. Slide 4: Production Growth

    Production Growth 200 Production of AuEq oz/Yr 100 0 2009 2010 2011 2012 2013 2014 2015 Guidance El Castillo La Colorada 4

  5. Slide 5: 2014 Results

    2014 Results Production Growth Cash Flow from Ops before WC 160 40.0 140 35.0 120 30.0 US$ Millions 100 25.0 GEO Oz/Yr 80 20.0 60 15.0 40 10.0 20 5.0 0 - 2009 2014 FY 2010 Q3 YTD 2014 2014 Estimated Investments Market Capitalization 30 $300 25 $24.3 $20.2 $250 20 US$ Millions $200 15 $ Millions Shar

  6. Slide 6: Argonaut Investment Potential

    Argonaut Investment Potential PNAV Valuations Argonaut Historical Performance 1.4 1.3 1.2 1.1 1.1 1 0.9 0.8 0.8 0.8 0.7 0.7 0.7 0.6 0.5 0.4 0.4 0.3 1104 1410 1574 1658 1201 1150 10.1 111 122 130 534 728 622 597 644 760 1.7 0.5 4.6 9.8 7.8 0.8 0.8 0.8 0.8 0.7 0.4 51 72 29 0.2 nmf 0 Au Oz/Yr (000s) Ca

  7. Slide 7: Growing by Smart Acquisitions

    Growing by Smart Acquisitions Project Purchases Resource Growth from post acquisition drilling 14,000  2009 Castle Gold Original purchase, M&I ounces (000s) 12,000 Post Drilling Program, M&I ounces (000s) (El Castillo mine) ~$98 Million 10,000 Global Inventory (includes inferred material)  2011 Pe

  8. Slide 8: Focusing purchases on assets with upside

    Focusing purchases on assets with upside Project Returns Project Returns 1000 900 800 700 Capex Future 600 Capex - Historical 500 1.7 M 1.2 M 1.3 M 1.7 M 4.2 M LOM Cash Cost -2010 Fwd 400 ozs. ozs. ozs. ozs. ozs. 300 purchase price 200 2010 2012 100 Fwd Fwd 0 El Castillo La San San Magino Colorada A

  9. Slide 9: El Castillo Mine

    El Castillo Mine Location: 100 Production Profile (000’s ozs)  120 kilometers from the capital of Durango in state of Durango, Mexico 80 95 93 85-90 88 60 72 Mining/Processing:  Open Pit / Heap Leach Mine 40 51  15.0 M Ore Tonnes Processed in 2014 20 29  Strip Ratio of 1.1:1 2 14 0 Gold Resource

  10. Slide 10: El Castillo 2015 Mine Plan

    El Castillo 2015 Mine Plan Q1E Q2E Q3E Q4E Full Year E Ore Tonnes 3.3 M 3.4 M 3.1 M 3.3 M 13.1 M Oxides 80% 78% 71% 87% 79% Transition 20% 22% 29% 13% 21% Average grade (g/t) Au 0.37 0.40 0.36 0.31 0.36 Strip Ratio 1.24 1.24 1.24 1.24 1.24 10

  11. Slide 11: El Castillo – Operating Statistics

    El Castillo – Operating Statistics East Pad Cost Per Tonne of Ore Processed Q3 2014 2013 2012 2011 2010 Mining $2.43 $2.56 $2.58 $2.25 $2.46 Crushing $0.79 $0.54 $0.58 $0.49 $0.34 Processing $1.86 $1.99 $1.84 $1.37 $1.15 Mine G&A $0.49 $0.45 $0.30 $0.23 $0.26 Total $5.57 $5.54 $5.30 $4.34 $4.21 West

  12. Slide 12: El Castillo Capital Program

    El Castillo Capital Program Sustaining: 2015 Future Pad Expansion: 2015 Future  Support Equipment $1.6 M  Drill, Grader, Ancilliary  West Pad 8 $0.1 M  Component Repair $3.6 M $6.0M  East Pad 3B Construction  Major Overhaul $4.3 M $10 M  Misc. Other $0.8 M $0.5-$1.0M Total $4.4 M Total $6.0

  13. Slide 13: La Colorada Mine

    La Colorada Mine Location: 200 Production Profile (000’s ozs)  45 kilometers from the capital of Hermosillo 150 Gold Silver170 154 Mining/Processing: 133  Open Pit / Heap Leach Mine 100  3.7 M tonnes ore processed in 2014  Strip ratio of 5.18:1 for material mined 50 43 50-55 GEO 20 25 Resources:

  14. Slide 14: La Colorada 2015 Mine Plan

    La Colorada 2015 Mine Plan Q1E Q2E Q3E Q4E Full Year 2015 E Ore Tonnes Mined (000s) 467 478 483 478 1,906 Waste Tonnes Mined (000’s) 2,448 2,503 2,530 2,503 9,984 Rehandled Ore (000’s) 823 842 851 842 3,358 Tonnes to Leach Pad (000’s) 1,291 1,320 1,334 1,320 5,265 Gold grade loaded to pads (g/t) 0.5

  15. Slide 15: La Colorada - Operating Statistics

    La Colorada - Operating Statistics Cost Per Tonne of Ore Processed Q3 2014 2013 2012 Mining $4.08 $1.40 $0.95 Crushing & $3.91 $4.09 $2.07 Processing Mine G&A $0.82 $1.48 $0.71 Total $8.81 $6.97 $3.73 Statistics 2015E Q4 2014 2014 2013 2012 Total Tonnes Mined (M) 11.9 4.3 17.0 16.3 4.1 Tonnes Ore (0

  16. Slide 16: La Colorada Capital Program

    La Colorada Capital Program Capital Program 2015 E Future Conveying/Crushing $1.4 M $0.5 M Heap Leach Pads $2.7 M $10.0 M Equipment & misc. $0.3 M $0.3 M/yr Total $4.4 M $10.9 M Capitalized stripping $6.5 M $3 – 5 M/yr 16

  17. Slide 17: Development Projects

    Development Projects San Antonio Magino San Agustín PFS Pit Resource Pit 2015 Goals 2015 Goals 2015 Goals • Permitting • Drilling campaign • Design • New PEA • Drilling • Permitting • Permitting • Construction decision 17

  18. Slide 18: San Agustin Project

    San Agustin Project  Location: Production Profile GEO (000's ozs)  10 kilometers from the El Castillo Mine 70 60 59 60 57  Mining/Processing: 52  Open Pit / Heap Leach Mine 50  10.5 year mine life 39 40  Average yearly production of 7 million tonnes  Strip ratio of 0.4:1 30  Average annual p

  19. Slide 19: San Agustin PEA

    San Agustin PEA Economic Model Results Capital Costs (millions) Gold Silver Mine 4.7 Avg Annual Production, ozs. 45,400 359,000 Total Production, ozs. 488,000 3,804,000 Process 37 Infrastructure 7.7 Years - active mine & stack 10.5 Total Capex 49.1 Avg. Cash Cost/oz Au (by-product) $611 Contingency,

  20. Slide 20: San Agustin – Upside

    San Agustin – Upside • Familiarity with the communities, ejidos, agencies and officials • Phase II drill program has potential to further expand resource 20

  21. Slide 21: San Antonio Project

    San Antonio Project  Location:  45 kilometers from the capital of La Paz 150 Production Profile (000’s ozs) 4 MTPY  Mining/Processing: 100 6 M TPY  Open Pit / Heap Leach Mine  4 MTPY vs. 6 MTPY crushing circuit 122 125  Strip ratio of 3.1:1 50 85 86 83 87 70 83 35 41  M&I Resources: (@ Sept 2

  22. Slide 22: Magino Project

    Magino Project  Location: 300 Production Profile (000’s ozs)  40 km northwest of Wawa, Ontario 245 200 195 203 200  Mining/Processing 134  Open Pit 107  12,500 Tonnes Per Day Mill 100  Strip Ratio of 2.6:1 0  Resource* Year 1 Year 2 Year 3 Year 4 Year 5 Year 6  P&P of 1.7 M oz – 60 Million t

  23. Slide 23: Potential Value Drivers

    Potential Value Drivers:  Potential for full resource extraction Current Potential 1.7 M ozs 4.2 M ozs Indicated and 1.0 M ozs inferred 60 M tonnes 150 M tonnes  Enhanced economics with full utilization of mining fleet  Currently 7 year mine life then and idle @ cost of $80 M  Potential Mine Lif

  24. Slide 24: Going Forward

    Going Forward San Agustín •Design •Land and Permit •Drill •Construction Decision 2015 Guidance 135,000 – 145,000 gold equivalent El Castillo ounces at a cash cost of $700-$750 per Magino •Production profile gold ounce sold. •Drilling of 85,000-90,000 •Permitting ounces •New PEA Upcoming Catalysts Sa

  25. Slide 25: Growth to 300,000-500,000 oz per year

    Growth to 300,000-500,000 oz per year 600 Magino +500k oz 500 with San Antonio upside* 400 San Agustin La Colorada 280-310k oz 300 El Castillo 200-230k oz 200 137k oz 150-180k oz 120k oz 108k oz 100 0 2012 2013 2014 Expansion New Mine - New Mine - New Mine - La Colorada & San Agustin San Antonio Mag

  26. Slide 26: For Additional Information

    For Additional Information www.argonautgold.com Curtis Turner Corporate Development Officer Argonaut Gold Inc. 9600 Prototype Ct. Reno, NV 89521 Ph.: 775-284-4422 ext. 104 Fax: 775-284-4426 26

  27. Slide 27: Mineral Reserves and Resources Tables

    Resource Tonnes Au Grade Au Ounces Ag Ag Ounces Argonaut Gold is a Canadian gold company engaged in exploration, mine development Category (000's) (g/t) (000's) Grade (g/t) (000's) and production activities. Its primary assets are the production stage El Castillo Mine in Mineral Reserves Durango, Me

  28. Slide 28: San Agustin Resource

    San Agustin Resource Material Class Tonnes of Gold Gold Grade Silver Grade Gold Ounces Silver Type Material Equivalent (g/t) (g/t) Contained Ounces (000s) Grade (g/t) (000s) Contained (1,2,3) (000s) Oxide Indicated 79,373 0.37 0.32 10.6 817 27,050 Transition Indicated 2,837 0.37 0.31 13.3 28 1,213 T

  29. Slide 29: Argonaut Position

    Argonaut Position Board of Directors Analyst Research (12-31-2014) Chairman Prior Experience BMO Andrew Kaip Brian J. Kennedy Chairman/President /CEO Meridian Gold Inc. Canaccord Genuity Rahul Paul Directors Peter C. Dougherty CFO, Meridian Gold Inc. CIBC Jeff Killeen James E. Kofman Vice Chairman,