  1. Slide 1: Financial Results 2021

    Slide 1: Financial Results 2021

    FINANCIAL RESULTS 2021 Warsaw, March 2022 1

  2. Slide 2: Agenda

    Slide 2: Agenda

    AGENDA PART 01 Summary PART 02 Presales and revenue’s perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 05 ESG PART 06 Appendices 2

  3. Slide 3: Part 01 Summary 2021

    Slide 3: Part 01 Summary 2021

    ROBYG PART 01 Summary 2021

  4. Slide 4: Summary 2021

    Slide 4: Summary 2021

    01. Summary 2021 Summary 2021 Operating cash flow: Revenues: Strong cash position*: PLN 585 million PLN 1 300 million PLN 471 million (excl. purchase of new plots) 4 * Including amounts kept on individual escrow accounts.

  5. Slide 5: Summary 2021

    Slide 5: Summary 2021

    01. Summary 2021 Summary 2021 Developer agreements signed: Units presold: 4 276 Units recognized 4 308 (net after cancellations) (net after cancellations) in revenue: 2 941 Number of units under construction: app. 5 260 Units on offer: 2 214 (1 555 units, recognized in Q4, (out of which <1% finished

  6. Slide 6: Material investments and financial activities

    Slide 6: Material investments and financial activities

    01. Summary 2021 ROBYG Group – material investings and financial activities Total new financing: Total value of signed agreements: PLN 210 million ca. PLN 521 million NEW PLOTS NEW PLOTS FINANCING Warsaw/Poznan/Wroclaw Gdansk/Gdynia ROBYG S.A. Total expected potential Total expected potential BONDS

  7. Slide 7: Land acquisition value

    Slide 7: Land acquisition value

    01. Summary 2021 ROBYG Group – land acquisition value Total value of signed agreements: ca. PLN 521 million Potential of Area of plots Type of saleable area Locations [ha] contracts [sqm] 1.6 Final 17 000 Warsaw, Mokotow 1.2 Final 9 400 Warsaw, Ursus 10.7 Final 100 000 Warsaw, Wilanów 2.2 Final 42 0

  8. Slide 8: Part 02 Presale & revenue perspective

    Slide 8: Part 02 Presale & revenue perspective

    PART 02 Presale & revenue perspective 8

  9. Slide 9: Presale structure (quarterly)

    Slide 9: Presale structure (quarterly)

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 2021: 4 276 units (+98% 2021/2020), PLN 2 071 million (+127% 2021/2020) Net number of presold units (quarterly) 1196 1110 1032 938 755 633 606 162 Q1 2020 Q2 2020 Q3 2020 Q4 2020 Q1 2021 Q2 2021 Q3 2021 Q4 2021 9

  10. Slide 10: Presale structure (annually)

    Slide 10: Presale structure (annually)

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 2021: 4 276 units (+98% 2021/2020), PLN 2 071 million (+127% 2021/2020) Net number of presold units (annually) 4276 4308 57% 17% 98% 3471 -27% 27% 2% -16% 10% 2957 2738 22% 2520 2569 2333 2118 2156 56% 9% 1731 1019 1113

  11. Slide 11: Presale structure by city

    Slide 11: Presale structure by city

    02. Presales & revenue’s perspective ROBYG Group – presale structure Presale in 2021: 4 276 units (+98% 2021/2020), PLN 2 071 million (+127% 2021/2020) Poznan 1% Gdansk 43% 47 units 1 831 units Wroclaw 12% 537 units Warsaw 44% 1 861 units 11

  12. Slide 12: Units on offer

    Slide 12: Units on offer

    02. Presales & revenue’s perspective ROBYG Group – units on offer FINISHED GOODS ON OFFER: <1% 2592 2492 42 2214 2021 87 1852 19* 179 34 2405 2550 2195 1842 1818 4Q 2020 1Q 2021 2Q 2021 3Q 2021 4Q 2021 Units under construction** Units completed * The offer is decreased by 20 commercial units which a

  13. Slide 13: Revenue recognition

    Slide 13: Revenue recognition

    02. Presales & revenue’s perspective ROBYG Group – revenue recognition (as at 31 December 2021) Recognition potential of units in revenues Number of units recognized in revenues (quarterly) Units not presold and not 1840 recognized: 2 234 1555 Completed: 39 1453 Under construction: 1 312 Which const

  14. Slide 14: Units to be completed in 2022-2023

    Slide 14: Units to be completed in 2022-2023

    02. Presales & revenue’s perspective Number of units to be completed in 2022-2023 and also (contracted) until 31 December 2021 Note: Due to uncertainty pertained to the spreading of Coronavirus Total & Presold disease (COVID-19), estimation of the completed investments may 2021 2022 2023 2022+2023 m

  15. Slide 15: Number of units to be completed in 2022

    Slide 15: Number of units to be completed in 2022

    02. Presales & revenue’s perspective Number of units to be completed in 2022 Gdansk Warsaw Wroclaw Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2022 completed in 2022 completed in 2022 Lawendowe Osiedle Życzliwa Jagodno 227 Wzgórze /

  16. Slide 16: Number of units to be completed in 2023

    Slide 16: Number of units to be completed in 2023

    02. Presales & revenue’s perspective Number of units to be completed in 2023* Gdansk Warsaw Wroclaw & Poznan Total no. of units to be Total no. of units to be Total no. of units to be Project Project Project completed in 2023 completed in 2023 completed in 2023 Lawendowe Osiedle nad Widawą - Royal R

  17. Slide 17: Part 03 Financial results

    Slide 17: Part 03 Financial results

    ROBYG PART Financial results ”

  18. Slide 18: Financial results

    Slide 18: Financial results

    03. Financial results Financial results (PLNk) 2021 2020 Change Revenues 1 299 900 1 105 307 17.6% Cost of sales (929 778) (800 304) 16.2% Gross profit on sales 370 122 305 003 21.4% Selling and marketing expenses (36 850) (26 436) 39.4% Administrative expenses (48 814) (39 972) 22.1% Other* 206 142

  19. Slide 19: Financial condition

    Slide 19: Financial condition

    03. Financial results Financial condition (PLNk) 2021 2020 Change Total assets, including: 3 479 289 2 573 916 35.2% Non-current assets, including: 709 734 498 993 42.2% Investment properties and investment properties 522 641 339 431 54.0% under construction Inventories 1 925 257 1 559 525 23.5% Tra

  20. Slide 20: Statement of cash flow

    Slide 20: Statement of cash flow

    03. Financial results Statement of cash flow (PLNk) 2021 2020 Net cash flows from operating activities, including: 238 926 36 746 Expenditures for the purchase of new plots (346 127) (243 785) Net cash flows from investing activities, including: (167 564) 19 835 Expenditures for the purchase of new

  21. Slide 21: Debt financing

    Slide 21: Debt financing

    03. Financial results Debt financing Nominal value and maturity of bank credit facilities and bonds as at December 31st, 2021 (PLNm). DEBT – Aging <1 year 1-2 years 2-3 years 3-4 years 4-5 years Over 5 years Total BANK CREDIT 14.26 0.05 0.00 0.00 0.00 0.00 14.31 FACILITIES BONDS 0.00 360.00 100.00 6

  22. Slide 22: Leverage and collections

    Slide 22: Leverage and collections

    03. Financial results Leverage and collections as at December 31st, 2021 * Net debt ratio = net debt ** / equity ** Net debt = interest bearing liabilities + derivatives + guarantees Net debt ratio* = 0.12 granted – intercompany loans – cash and cash equivalents – amounts kept on individual escrow a

  23. Slide 23: Dividend

    Slide 23: Dividend

    03. Dividend Dividend Dividend for 2021: The Management Board of ROBYG S.A. recommended the payment of dividend in the total amount of PLN 550 million. Dividend for 2020: The Ordinary General Meeting of ROBYG S.A. retained the standalone net profit of ROBYG S.A. for the year ended 31 December 2020 a

  24. Slide 24: Part 04 Plans of ROBYG Group

    Slide 24: Part 04 Plans of ROBYG Group

    PART 04 Plans of ROBYG Group 24

  25. Slide 25: Strategic goals

    Slide 25: Strategic goals

    04. Plans of ROBYG Group Strategic goals Number of presold of residential units in 2022 > 2.200 units Completion of units designated for rent: Till 2024 >4.500 units Till 2027 >12.000 units Maintaining the margins Maintaining the adequate level of the land bank Expansion of activities in Wroclaw and

  26. Slide 26: Total land bank

    Slide 26: Total land bank

    04. Plans of ROBYG Group Total land bank 18 775 units + 2 214 units on offer = 20 989 units Gdansk/Gdynia Warsaw Wroclaw Poznan Number of Number of Number of Number of District % District % District % District % units units units units Nowy Port 750 17% Wilanów 870 10% Krzyki 260 14% Ostrów Tumski 1

  27. Slide 27: Commercial potential

    Slide 27: Commercial potential

    04. Plans of ROBYG Group Commercial potential = 45 000 sqm of usable area Commercial potential = 45 000 sqm of usable area WROCLAW* POZNAN 35 000 10 000 TOTAL: 45 000 sqm 27 * Preliminary land purchase agreements.

  28. Slide 28: Part 05 ESG

    Slide 28: Part 05 ESG

    PART 05 ESG ROBYG FOR SOCIETY AND ENVIRONMENT 28

  29. Slide 29: ESG: Mission, philosophy, actions

    Slide 29: ESG: Mission, philosophy, actions

    05. ESG FOR SOCIETY AND ENVIRONMENT MISSION PHILOSOPHY ACTIONS “Our mission is to inspire others CARE The protection of natural resources and to work together, to fulfil the vision care for the environment are very of a sustainable world for our important to us, hence we implement ecological solutio

  30. Slide 30: ESG - Environmental dimension

    Slide 30: ESG - Environmental dimension

    05. ESG – Environmental dimension ROBYG FOR PLANET Focus Areas ▪ Green standard: successfully incorporating eco- friendly and low-carbon solutions 15 ▪ Making 15-minute city concept a reality ▪ Water and biodiversity Strategic Goals We lead sustainable development processes fully respecting the natu

  31. Slide 31: ESG - Environmental dimension

    Slide 31: ESG - Environmental dimension

    05. ESG – Environmental dimension ROBYG FOR PLANET 31 * Estimated values. Data for all projects in company’s history unless otherwise stated

  32. Slide 32: ESG - Social dimension

    Slide 32: ESG - Social dimension

    05. ESG – Social dimension ROBYG FOR PEOPLE Focus Areas ▪ Building new, integrated communities ▪ Employee well-being: be the employer that attracts, retains and grows people. ▪ Client satisfaction ▪ Through its projects, ROBYG shapes new communities. Strategic Goals ▪ We are also considering our soc

  33. Slide 33: ESG - Social dimension

    Slide 33: ESG - Social dimension

    05. ESG – Social dimension ROBYG FOR PEOPLE 33 * Estimated values. Data for all projects in company’s history unless otherwise stated

  34. Slide 34: ESG - Governance dimension

    Slide 34: ESG - Governance dimension

    05. ESG – Governance dimension ROBYG FOR SUSTAINABLE BUSSINES Focus Areas ▪ ESG in management practices ▪ Annual ESG disclosure & transparent business Strategic Goals ▪ ROBYG ESG Website- already launched ▪ We are managing the company responsibly while www.esg.robyg.pl delivering strong financial per

  35. Slide 35: ESG

    Slide 35: ESG

    05. ESG All of us at ROBYG acknowledge how important sustainable growth is for the envirnomnent and society. So far we have done a lot, but we treat this is a journey that will involve over time. Thus, we are committed to continuing our work to constantly improve our performance and disclose it to t

  36. Slide 36: Part 06 Appendices

    Slide 36: Part 06 Appendices

    PART 06 Appendices 36

  37. Slide 37: Senior Management Team

    Slide 37: Senior Management Team

    06. Appendices Senior Management Team Oscar Kazanelson Zbigniew Okonski Eyal Keltsh Marta Hejak Artur Ceglarz Wojciech Gruza Chairman of the President of the (CPA) Vice President Vice President Vice President Supervisory Board Management Board Vice President COO CFO & Head of HR Head of Business Dev

  38. Slide 38: Ownership structure

    Slide 38: Ownership structure

    06. Appendices Ownership structure On 23 December 2021 Bricks Acquisitions Limited entered into a conditional share purchase agreement of 100% of the Company’s shares. The Agreement was signed with TAG Immobilien AG, a company incorporated under German law, with its registered office in Hamburg and

  39. Slide 39: Investments under construction (1)

    Slide 39: Investments under construction (1)

    06. Appendices Description of investments – under construction (1) Lawendowe Wzgórza / Osiedle Kameralne Stacja Nowy Gdansk City: Gdansk City: Warsaw District: Jasień District: Bemowo No. of stages: ca. 40 No. of stages: 8 Stages completed: 35 Stages completed: 5 Stages under construction: 3 No. of

  40. Slide 40: Investments under construction (2)

    Slide 40: Investments under construction (2)

    06. Appendices Description of investments – under construction (2) Nowa Letnica Young City 2 City: Gdansk City: Warsaw District: Letnica District: Bemowo No. of stages: 15 No. of stages: 6 Stages completed: 13 Stages completed: 1 Stages under construction*: 1 Stages under construction: 1 No. of unit

  41. Slide 41: Investments under construction (3)

    Slide 41: Investments under construction (3)

    06. Appendices Description of investments – under construction (3) Zajezdnia Wrzeszcz City Sfera Modern City City: Gdansk City: Warsaw City: Warsaw District: Wrzeszcz District: Włochy District: Bemowo No. of stages: 14 No. of stages: 14 No. of stages: 9 Stages completed: 12 Stages completed: 3 Stage

  42. Slide 42: Investments under construction (4)

    Slide 42: Investments under construction (4)

    06. Appendices Description of investments – under construction (4) Jagodno Osiedle Życzliwa Praga Nadmotławie Estate City: Wroclaw City: Warsaw City: Gdansk District: Krzyki District: Tarchomin District: Śródmieście No. of stages: 8 No. of stages: 7 No. of stages: 12 Stages completed: 3 Stages compl

  43. Slide 43: Investments under construction (5)

    Slide 43: Investments under construction (5)

    06. Appendices Description of investments – under construction (5) Moment Park Południe Apartamenty Królewskie City: Gdansk City: Gdansk City: Warsaw District: Ujeścisko District: Łostowice District: Wilanów No. of stages: 2 No. of stages: 9 No. of stages: 2 Stages completed: 1 Stages completed: 3 S

  44. Slide 44: Investments under construction (6)

    Slide 44: Investments under construction (6)

    06. Appendices Description of investments – under construction (6) Więcej Mój Ursus Lagom City: Gdansk City: Warsaw City: Gdansk District: Łostowice District: Ursus District: Ujeścisko No. of stages: 2 No. of stages: 8 No. of stages: 2 Stages completed: 1 Stages completed: 2 Stages under constructio

  45. Slide 45: Investments under construction (7)

    Slide 45: Investments under construction (7)

    06. Appendices Description of investments – under construction (7) Szumilas Wojszyckie Alejki City: Gdansk (Kowale) City: Wroclaw District: Krzyki No. of stages: 4 No. of stages: 2 Stages under construction*: 2 Stages completed: 1 Stages under construction: 1 No. of units: ca. 880 units No. of units

  46. Slide 46: Investments under construction (8)

    Slide 46: Investments under construction (8)

    06. Appendices Description of investments – under construction (8) Praga Deco Młode Stogi Porto City: Warsaw City: Gdansk City: Gdansk District: Praga Południe District: Stogi District: Nowy Port No. of stages: 1 No. of stages: 1 No. of stages: 10 Stages under construction: 1 Stages under constructi

  47. Slide 47: Investments under construction (9)

    Slide 47: Investments under construction (9)

    06. Appendices Description of investments – under construction (9) Kameralna Olszówka Początek Piątkowo Royal Residence City: Wrocław City: Poznań City: Warsaw District: Krzyki District: Piątkowo District: Wilanów No. of stages: 1 No. of stages: 8 No. of stages: 10 Stages under construction: 1 Stage

  48. Slide 48: Investments completed (1)

    Slide 48: Investments completed (1)

    06. Appendices Description of investments – completed (1) Szczęśliwy Dom Osiedle Zdrowa Nowa Rezydencja Królowej Marysieńki City: Warsaw City: Warsaw City: Warsaw District: Ochota District: Wilanów District: Wilanów No. of stages: 3 No. of stages: 5 No. of stages: 10 No. of units: 304 units No. of u

  49. Slide 49: Investments completed (2)

    Slide 49: Investments completed (2)

    06. Appendices Description of investments – completed (2) City Apartments Osiedle Królewskie Albatross Towers City: Warsaw City: Warsaw City: Gdansk District: Żoliborz District: Wilanów District: Przymorze No. of stages: 6 No. of stages: 6 No. of stages: 5 No. of units: 1 190 units No. of units: 640

  50. Slide 50: Investments completed (3)

    Slide 50: Investments completed (3)

    06. Appendices Description of investments – completed (3) Królewski Park Park Wola Residence Modern Żoliborz City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Wola District: Żoliborz No. of stages: 6 No. of stages: 1 No. of stages: 1 No. of units: 528 units No. of units: 317 units N

  51. Slide 51: Investments completed (4)

    Slide 51: Investments completed (4)

    06. Appendices Description of investments – completed (4) Young City Młody Wilanów Mila Baltica City: Warsaw City: Warsaw City: Gdansk District: Bemowo District: Wilanów District: Zaspa No. of stages: 9 No. of stages: 3 No. of stages: 2 No. of units: 1 302 units No. of units: 257 units No. of units:

  52. Slide 52: Investments completed (5)

    Slide 52: Investments completed (5)

    06. Appendices Description of investments – completed (5) Apartamenty Villa Nobile Słoneczna Morena MoreNova City: Warsaw City: Gdansk City: Gdansk District: Wilanów District: Piecki-Migowo District: Piecki-Migowo No. of stages: 3 No. of stages: 22 No. of stages: 3 No. of units: 637 units No. of uni

  53. Slide 53: Investments completed (6)

    Slide 53: Investments completed (6)

    06. Appendices Description of investments – completed (6) Ogrody Wilanów Green Mokotów Stacja Nowy Ursus City: Warsaw City: Warsaw City: Warsaw District: Wilanów District: Mokotów District: Ursus No. of stages: 3 No. of stages: 9 No. of stages: 5 No. of units: 221 units No. of units: 673 units No. o

  54. Slide 54: Investments completed (7)

    Slide 54: Investments completed (7)

    06. Appendices Description of investments – completed (7) Forum Wola Praga Arte Leśna Przystań City: Warsaw City: Warsaw City: Wroclaw District: Wola District: Praga Południe District: Osobowice No. of stages: 4 No. of stages: 1 No. of stages: 1 No. of units: ca. 880 units No. of units: ca. 250 unit

  55. Slide 55: Investments completed (8)

    Slide 55: Investments completed (8)

    06. Appendices Description of investments – completed (8) Willa Nad Potokiem Uroczysko City: Wroclaw City: Wroclaw District: Fabryczna District: Psie Pole No. of stages: 1 No. of stages: 3 No. of units: 13 units No. of units: 309 units Start of construction: Q3 2019 Start of construction: Q1 2020 Co

  56. Slide 56: Summary 2021 and contact

    Slide 56: Summary 2021 and contact

    Summary 2021 Units presold: 4 276 (net after cancellations) Please contact us: Investor Relations ROBYG S.A. Number of signed development agreements: 4 308 ri@robyg.com.pl (22) 419 11 00 Number of units recognized in revenues: 2 941 Units on offer: 2 214 (out of which 1% are finished goods) Revenues

  57. Slide 57: Disclaimer

    Slide 57: Disclaimer

    Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely

Source: company website

More decks from Robyg S.A.

All 64 Robyg decks