  1. Slide 1: Fourth Quarter and 2018 Year-End Results

    TSX: LUN Nasdaq Stockholm: LUMI Fourth Quarter and 2018 Year-End Results February 15, 2019 Candelaria, Atacama Region, Chile

  2. Slide 2: Cautionary Statements

    Cautionary Statements Caution Regarding Forward-Looking Information and Non-GAAP Performance Measures All statements, other than statements of historical fact, made and information contained or incorporated by reference in or made in giving this presentation and responses to questions is "forward-lo

  3. Slide 3: Participants

    Participants Marie Inkster President & CEO Jinhee Magie SVP & CFO Peter Richardson SVP & COO 3 Zinkgruvan Underground

  4. Slide 4: 2018 Highlights

    2018 Highlights Excellent Advancing Disciplined Capital Performance Projects Management – overall safety performance – Candelaria low-risk high- – early redemption of better than target for sixth return investments on remaining high yield notes consecutive year schedule and budget – actively assessi

  5. Slide 5: Summary Results

    Summary Results 2018 Full-Year Results Production – 199,630 t of copper – 152,041 t of zinc – 17,573 t of nickel – 31,184 t of lead $1,726M in Revenue – 64% copper – 17% zinc – 9% nickel – 3% lead 55 New Candelaria Haul Trucks

  6. Slide 6: Financial Highlights

    Financial Highlights Realized Metal Prices 1 2018 2017 Δ Copper $2.79/lb $2.98/lb (6%) Nickel $5.64/lb $4.84/lb 17% Zinc $1.25/lb $1.37/lb (9%) Summarized Financial Results 2 2018 2017 Δ Revenue $1,726M $2,077M (17%) Gross Profit $437M $820M (47%) Attributable Net Earnings from Continuing Operations

  7. Slide 7: Candelaria

    Candelaria Met Annual Guidance Copper Production & Cash Cost Outlook (100% basis; kt & $/lb Cu, net of by-product credits) – produced 134,578 t of copper at $1.68/lb cash cost – moved 72.3 Mt of waste from open pit 175-185 – North Sector UG production at ~10,200 tpd, an 11% 165-175 increase over the

  8. Slide 8: Candelaria Open Pit – Phase Pushback

    Candelaria 8 Candelaria Open Pit – Phase 10 Pushback – Early February 2019

  9. Slide 9: Candelaria

    Candelaria Fleet Reinvestment, Mill Optimization and South Sector Development Progressing Well – ~60% of new open pit mine fleet received and in service. Remaining equipment to be delivered mainly in 2019 – >95% of Mill Optimization Project equipment orders placed and construction >40% completed at

  10. Slide 10: Neves-Corvo

    Neves-Corvo Excellent Mine and Mill Performance – produced 45,692 t of copper and 75,435 t of zinc at $1.28/lb copper cash cost Copper, Zinc Production & Cash Cost Outlook (kt & $/lb Cu, net of by-product credits) – improved mine productivity and mill throughput both contributed to significant perfo

  11. Slide 11: ZEP – Underground Construction

    ZEP – Underground Construction Top of Crusher Chamber Transfer Point #3 Turnover Station Conveyor #3 11

  12. Slide 12: ZEP – Zinc Plant Construction

    ZEP – Zinc Plant Construction Zinc Plant Construction – Early February 2019 12

  13. Slide 13: ZEP – Surface Construction

    ZEP – Surface Construction New Zinc Plant Construction – Early February 2019 Flotation Cell Installation in Existing Plant 13

  14. Slide 14: Eagle & Eagle East

    Eagle & Eagle East Robust Performance – produced 17,573 t of nickel and 17,974 t of Nickel, Copper Production & Cash Cost Outlook copper at $1.01/lb nickel cash cost (kt & $/lb Ni, net of by-product credits) – lower head grades as per mine sequencing ahead of Eagle East coming online 19-22 16-19 18

  15. Slide 15: Zinkgruvan

    Zinkgruvan Improved Grades and Mill Throughput – produced 76,606 t of zinc,1,386 t of copper Zinc Production & Cash Cost Outlook and 24,613t of lead at $0.34/lb zinc cash cost (kt & $/lb Zn, net of by-product credits) – Q4 2018 zinc production was the best quarter of the year on improved zinc ore he

  16. Slide 16: 2019 Capital & Exploration Expenditure Guidance

    2019 Capital & Exploration Expenditure Guidance Capital Expenditures Capital Expenditures 1 (US$M) – unchanged from previous guidance Capitalized Stripping2 130 Los Diques TSF 10 Exploration – aggressive in-mine and near-mine programs New Mine Fleet Investment 75 – $80M to be invested in 2019 in exp

  17. Slide 17: Increasing Production Profile

    Increasing Production Profile1 (kt) Copper Zinc Nickel Forecast 7% CAGR primarily on improved Forecast ~55% increase primarily on Eagle East planned on-line in Q4 2019 Candelaria mine plan and low-risk investments Neves-Corvo Zinc Expansion Project 251 241 246 19 18 231 16 210 15 232 16 218 227 195

  18. Slide 18: Capital Allocation Priorities

    Capital Allocation Priorities Invest in low-risk, high-return brownfield expansion projects and exploration Maintain regular dividend Keep a flexible balance sheet to move quickly on compelling growth opportunities Consider other returns of capital to shareholders from time-to-time – announced Norma

  19. Slide 19: TSX: LUN Nasdaq Stockholm: LUMI

    TSX: LUN Nasdaq Stockholm: LUMI

  20. Slide 20: NI 43-101 Compliance

    NI 43-101 Compliance Unless otherwise indicated, Lundin Mining Corporation (the “Company”) has prepared the technical information in this presentation including Mineral Reserve and Mineral Resource estimates (“Technical Information”) based on information contained in the technical reports and news r