Slide 1: Investor community site visit, 14 June 2007
Energy Resources of Australia Ltd (ERA) Suresh Rajapakse General Manager Operations Investor community site visit 14 June 2007 Forward-looking statements This presentation contains statements which may include predictions as to the future, and which may constitute forward-looking statements within t
Slide 2: Acknowledge Traditional Owners / Safety briefing
Acknowledge Traditional Owners Energy Resources of Australia (Ltd) is located on Aboriginal land and is surrounded by, but separate from, Kakadu National Park. ERA respectfully acknowledges the Mirarr Gundjeihmi, Traditional Owners of the land on which the Ranger Mine is situated. 3 Safety briefing
Slide 3: Agenda for day / ERA leases
Agenda for day • Overview briefing • Morning tea • Split into 3 groups — Mine – Overview of pit 3 – Waste stockpiles — Processing plant – Radiometric sorting & Laterite plant – Water treatment plant – Processing — Exploration programs • Depart for Jabiru airport 5 ERA leases • Operations located 250
Slide 4: Safety – injury frequency rates
Ranger mine site Magela Creek Current Pit Stockpiles Plant and infrastructure Previous pit Water evaporation pond Safety – injury frequency rates LTIFR/AIFR by Year AIFR LTIFR 4.5 4 3.5 Frequency Rate 3 2.5 2 1.5 1 0.5 0 2001 2002 2003 2004 2005 2006 2007 YTD 8 4
Slide 5: Safety – injury severity
Safety – injury severity ERA LTI 12 Month Rolling Severity Rate (LTISR) 50 45 40 35 Severity Rate 30 25 20 15 10 5 0 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 Apr-07 May-07 9 Process flow 10 5
Slide 6: Cyclone trough – rainfall event
Cyclone trough – rainfall event • Jabiru received 850mm rain in seven days ending 2 March • 750mm rain fell in one 72 hour period (1:2,000 year event) • No injuries or adverse environmental impacts during the event • ERA has declared force majeure on sales contracts due to effect of rainfall • Direc
Slide 7: Pit 3 December 2006 / Pit 3 March 2007
Pit 3 December 2006 13 Pit 3 March 2007 14 7
Slide 8: Water storage and treatment / Jabiru and ERA
Water storage and treatment • Process Water – water used directly in the process plant – stored in Pit 1 and Tailings Dam • Disposal via evaporation and Water Treatment Plant • Pond Water - water that has mainly been disturbed by mining operations – stored in Pit 3 and retention pond 2 • Disposal in
Slide 9: Staff / Current projects
Staff • Approximately 380 staff directly employed by ERA • Diverse workgroup – 13% Indigenous, 20% female (Employer of Choice for women), many cultural groups represented • Significant focus on training – trainees, apprentices, graduates • Increasing Indigenous employment is a key focus for 2007 — S
Slide 10: Pit 3 extension
Pit 3 extension Existing Pit Crest 19 20 10