Cohu, Inc. · NASDAQ:COHU

Cohu — SEMICON Korea 2026

18 slides from Cohu's conference presentation, Feb 11, 2026

  1. Slide 1: From Reactive to Predictive: AI-Driven Optimization for ATE Performance & Reliability

    From Reactive to Predictive: AI-Driven Optimization for ATE Performance & Reliability Wai-Kong Chen, Cohu, Inc. February 11, 2026 © 2026 Cohu, Inc. All rights reserved.

  2. Slide 2: Agenda

    Agenda • Reactive Automated (ATE) application - Pre-emphasis setting optimization • Predictive Automated (ATE) application - Improvement in ATE maintenance

  3. Slide 3: Reactive: Automated Pre-Emphasis Setting

    Reactive: Automated Pre-Emphasis Setting

  4. Slide 4: Reactive: Automated Pre-Emphasis Setting

    Reactive: Automated Pre-Emphasis Setting • Objectives - Provides a structured, automated method to select optimal pre-emphasis settings. - Combines simulation, measurement, and software-guided testing. - Supports a wide range of probe card and load board configurations. - Ensures robust performance

  5. Slide 5: Pre-Emphasis Setting Challenges: Too Many Settings

    Pre-Emphasis Setting Challenges Too Many Settings • There are 3 knobs for pre-emphasis setting - Pre-1 - Post-1 - Post-2 • Each knobs has 32 settings - A combination of 32K settings with 3 knobs - To determine the optimum setting will be time consuming and challenging without oscilloscope • Pre-emph

  6. Slide 6: Hardware Characterization

    Scope-Based Validation Hardware Characterization Signal Integrity Simulation Preliminary Setting Table Simulation Result Scope-Based Validation • To reduce the number of settings • Create Final Setting Table

  7. Slide 7: Software-Based Optimization

    PCB Trace Routing Software-Based Optimization • On the user load board, select an unused TX (transmit) lane that is routed similarly to other high-speed lanes. This ensures it accurately reflects the overall high-speed channel characteristics. • Create a loopback connection by routing the selected u

  8. Slide 8: The Methodology: Real world data collection

    The Methodology The base: Real world data collection The Scaling Rules • Half Rate Rule: If speed drops by 50% (6.25G), loss drops by ~50%. Steps scale by 0.5. • Voltage Ratio Rule: If swing drops by 50% (200mV), the required cancellation voltage drops by 50%. Steps scale by 0.5. Parameters & Relati

  9. Slide 9: The "Sweet Spot" Chart

    The “Sweet Spot” Chart • The map visualizes the Maximum Eye Quality achievable for every combination of Pre1 and Post 1. • By collapsing the other dimensions (Post2, RX settings), we can clearly see the “mountain peak” of signal integrity - Yellow/Green areas: High Eye Quality (the optimal zone) - P

  10. Slide 10: Signal Integrity Landscape Visualization of Conditions

    Signal Integrity Landscape Visualization of 5 Conditions • Based on the data points we have analyzed and the physical scale rules. The optimal emphasis setting (for both Pre1 and Post1) is directly proportional to the product of the Data Rate and Voltage Swing • The Wire mesh represents the “Eye Qua

  11. Slide 11: Figuring Out the Formula

    Figuring Out the Formula The data that generated the coefficient is accumulative For instance: Coefficient -0.0016 is calculated using dataset1. Coefficient -0.00187 is using dataset1 + dataset2

  12. Slide 12: Pre-Emphasis Setting Formula

    Pre-Emphasis Setting Formula X-Axis Value from the equation (e.g., -8.0) Y-Axis The specific setting for each tap Key Relationships Tracks the "Optimal Step" almost 1:1. If the Post-Tap 1 (Green) equation says -8, set Post1 to -8. Tracks closely but is slightly weaker. If the Pre-Tap (Blue) equation

  13. Slide 13: Initial Results (based on actual data collected)

    Initial Results (based on actual data collected) Data was manually collected using multiple pre-emphasis settings, data rates, and voltage swings Pre-emphasis settings were recommended by an AI model using the collected data. Validation results indicate strong correlation between the AI-suggested an

  14. Slide 14: Predictive: Improving Cpk Value

    Predictive: Improving Cpk Value

  15. Slide 15: Predictive: Process Stability Monitoring

    Predictive: Process Stability Monitoring Use Case Potential Impact • High-speed digital instrument: Low Cpk in • Difficulties in manufacturing voltage swing test • Out of box quality • Tester-to-tester or site-to-site variation • Insufficient design margin • Parameter sensitivity • Corner condition

  16. Slide 16: Reason for Low Cpk (<2.0)

    Reason for Low Cpk (<2.0) Process Mean is Shifted High Process Variation Test Condition Calibration Toward Upper Limit (Sigma) Sensitivity Margin The mean is closer to the This is the lowest swing volt The test The standard deviation is upper specification limit age test point (example of uses perce

  17. Slide 17: Recommendations to Improve Cpk

    Recommendations to Improve Cpk Center the Reduce Review Hardware Process Mean Process Variation Specification Limits Investigation • Adjust calibration offset to • Investigate sources of • The current limits are overly • Potential hardware-related shift the mean variation in the swing conservative f

  18. Slide 18: Thank you

    SEMICON’ & sem KOREA Thank you TRANSFORM A=Cohu: TOMORROW

Cohu — SEMICON Korea 2026 on 6ix