Azure Power Global Limited · OTC:AZREF

Azure Power Global — Investor Presentation (June 2020)

41 slides from Azure Power Global's investor presentation, June 2020

  1. Slide 1: Investor Presentation June 2020

    7 GW+ Pan India portfolio of solar assets India’s first private grid connected MW solar plant Issued India’s first solar Green Bond Investor Presentation June 2020 0|Copyright © 2020 Azure Power |www.azurepower.com

  2. Slide 2: Disclaimer

    Disclaimer Forward-Looking Statements This information contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934 and the Private Securities Litigation Reform Act of 1995, including statements regarding our future financial and operating guidance, op

  3. Slide 3: Executive Summary

    Executive Summary 2

  4. Slide 4: Azure Power Overview

    Azure Power Overview (AZRE: NYSE) A Leading Pan Indian Solar Power Developer Portfolio of 7,115 MWs(1) (1,808 MWs Operational, 1,307 MW Contracted, 2,000 MW Committed and 2,000 MW Greenshoe (1,2) ) 6,948 MWs 167MWs Utility-Scale Projects Azure Roof Power •• Founded in 2008, built India’s first priva

  5. Slide 5: 7,115 MW Committed Portfolio, 1,808 MWs Operational

    7,115(1) MW Committed Portfolio, 1,808 MWs Operational ~90% (2) in High Irradiation Zone ~6%(2) in Mid Irradiation Zone Focus on Strong Counterparty Credit Punjab (214 MW) 214 MW Rajasthan (3,675 MW) BBB- & above 475 MW Uttar Pradesh (100 MW) 95% ~95% of the portfolio 100 MW 3,200 MW is Investment G

  6. Slide 6: Visible Historical and Future Growth

    Visible Historical and Future Growth Growing Portfolio with Strong Contracts in Place Substantial Revenue Growth to Portfolio Run-Rate(1)(2) 7,800 7,115 6,500 $711(1) 5,115 Revenues (US $ Million) 5,200 MWs 3,115 3,900 600 Committed 707 1,808 2,600 Under Construction 1,300 $144 $172 $112 - $44 $61 O

  7. Slide 7: Key Highlights of Recent Developments

    Key Highlights of Recent Developments No material adverse impact from COVID-19, to date; Operational assets on track; We expect MWs under construction will be completed Present Value of Equity(3) before expected revised COD. (No value for growth beyond current portfolio or cost reductions) $2,500 Ca

  8. Slide 8: COVID-19 Update: Azure Power As A Safe Haven

    COVID-19 Update: Azure Power As A Safe Haven No Material Adverse Impacts From COVID-19 Performance Illustrates Quality and Predictability of Assets and Cash Flows Strong Liquidity through at least March 31, 2021(1) With Superior Access to Capital and Operations, Azure Should Further Differentiate It

  9. Slide 9: Recent 4 GW Project Win Is Value Accretive

    Recent 4 GW Project Win Is Value Accretive Tariff ~15% Present Value of Equity for 4 GW Win(2) higher than $1,000 Potential of (USD Mn) similar SECI Opportunity $800 around 6.0x central grid for 20%+ $600 EV/EBITDA connected equity IRRs $400 PV of Equity Value build cost auctions we $200 have won $-

  10. Slide 10: Historical and Future Strong Growth

    Historical and Future Strong Growth MWs Operational Guidance MWs EBITDA, Cash Flow to Equity(2) and Debt 8,000 7,000 Forecast 6,000 USD Millions EBITDA: CAGR 32% $700 $575 - $675 5,000 4,000 $600 3,000 2,000 CAGR 45% $500 1,000 - $400 FY'17(a) FY'18(a) FY'19(a) FY'21(e) FY'22(e) FY'23(e) FY'24(e) FY

  11. Slide 11: Plan For Equity Funding Requirements

    Plan For Equity Funding Requirements Identified $150mn of equity sources towards Pursuing Lowest Cost of $600 million equity need to build 4 GWs Capital Fully equity funded for 3,115 MWs; Continue to expect that Identified opportunities since February 2020 to no new shares will be issued before at l

  12. Slide 12: Published First Sustainability Report; Launched Sustainability Website

    Published First Sustainability Report; Launched Sustainability Website Highlights  Avoided 5.2 mn tons of CO2 equivalents since inception (1)  50% saving last year in water consumption per unit of electricity generated (2)  Aim to become water neutral over the coming years Environment  Volunteer

  13. Slide 13: Corporate Social Responsibility Programmes

    Corporate Social Responsibility Programmes Promoting livelihood enhancement by providing Donation of modified wheelchair and two Promoting education by providing smart class in skill development across 7 sites in Gujarat wheelers to the disabled army veterans Government schools across multiple state

  14. Slide 14: Strong Governance and Disclosure Standards

    Strong Governance and Disclosure Standards Only Indian Solar Independent Power Producer listed on NYSE Standards reinforced by listing requirements Strong Corporate Governance Home country SEC & NYSE SGX-ST requirements that requirements regulatory also require regular requiring periodic requirement

  15. Slide 15: Experienced Board Backed by Long Term Marquee Shareholders

    Experienced Board Backed by Long Term Marquee Shareholders IFC Global Infrastructure Fund  Increased stake in Azure Power to c.50.9% through multiple rounds &  Made its first investment in company in 2010 and increased stake open market purchase through multiple rounds with current holding of c.24

  16. Slide 16: Industry Overview

    Industry Overview 15

  17. Slide 17: Industry and Regulatory Update

    Industry and Regulatory Update Industry Update Regulatory Update Continued robust demand for new renewable energy in India – In light of the COVID disruption, renewable energy is deemed an despite the short-term blip in demand related to COVID-19, essential service. MNRE reiterated “must run status”

  18. Slide 18: The Solar Advantage in India

    The Solar Advantage in India Electricity Usage per Capita (MWh) 12.8 US: ~14x > India Azure’s solar plants have ~100 mn people without high availability Seasonal Energy direct power source Curve Summer Monsoon China: ~5x > India 4.3 India-Demand Peak Low 0.9 Solar-Generation Peak Low USA China India

  19. Slide 19: Operating and Financial Metrics

    Operating and Financial Metrics 18

  20. Slide 20: FY’20 Key Performance Metrics

    FY’20 Key Performance Metrics 1,808 MW Operating 7,115 MW(3) Operating US$ 0.43m Project US$ 43.0 mn CFe for & Committed Cost/MW (DC) Operating Assets 25% increase(1) 112% increase 27% reduction(2) 15% increase(1) • 367 MW (610MW DC) commissioned • 707 MWs are under construction • DC cost per MW US$

  21. Slide 21: Review of Q4 FY’20 Results

    Review of Q4 FY’20 Results Reported Reported Reported 4Q FY’20 After % Change Adjustments* (in million) 4Q FY’19 4Q FY’20 4Q FY’20 Adjustments Adjusted Q4FY’20 Comments US$ INR INR US$ US$ vs Q4FY’19 2,847 3,675 48.7 0.6 49.3 31% 41% increase in operational DC MWs. $0.6 mn Revenue adjustment is for

  22. Slide 22: Cash Flow to Equity for Operating Assets: FY’20 vs FY’19

    Cash Flow to Equity (CFe) for Operating Assets: FY’20 vs FY’19 15% growth in CFe from Operating Assets in FY’20 vs FY’19 100 90 $40.2 ( $4.2 ) 80 ( $32.9 ) 70 60 In US$ Millions 50 $43.0 $2.5 40 $37.3 30 20 10 0 FY'19 CFe from Additional Revenue Higher Cash Operating Higher Cash Interest Lower Debt

  23. Slide 23: A Growing Balance Sheet

    A Growing Balance Sheet As at March 31, 2019 As at March 31, 2020 (in million) (in million) INR INR US$## Cash, Cash Equivalents and Current 10,545 9,792 129.9 Investments* Property, Plant & Equipment, Net 83,445 95,993 1,273.4 Net Debt# 59,014 73,780 978.6 *Does not include Current and Non-Current

  24. Slide 24: Reiterating FY’21 Guidance

    Reiterating FY’21 Guidance 2,650 – 2,950 MWs INR 15,800 – 16,600 million(1) Operating by March 31, of Revenue for FY’21 2021 1Q FY’21 Revenue: INR 3,800 – 4,000 million Q1 FY’21 PLF 22%-23% _________________________ 1) US$ 210- 220 Mn (at March 31, 2020 exchange rate- INR75.39 to US$1) 23|Copyright

  25. Slide 25: Appendix

    Appendix 24

  26. Slide 26: Historical Plant Load Factor (PLF); 1Q FY’21 Forecast

    Historical Plant Load Factor (PLF); 1Q FY’21 Forecast 23.0% 22-23%1Q FY’21 forecast 22.3% 22.0% FY’20: 20.5% 21.5% 21.0% 20.5% FY’19: 18.6% 20.0% 19.4% 19.0% 17.9% 18.0% 16.8% 17.0% 17.7% 16.4% 16.0% 15.0% 1Q 2Q 3Q 4Q FY'19a FY'20a 25|Copyright © 2020 Azure Power |www.azurepower.com

  27. Slide 27: DSO by Counterparty

    DSO by Counterparty Amounts in US$ million On time/ Project Total Within Past due up Past due more DSO Customer Name Capacity (MWs) Name outstanding grace to one year than 365 days days (1) period 14 14 - - 74 SECI , NTPC, NVVN 689 8 1 5 2 423 Southern Power Distribution Com of AP Ltd(1) AP-1 50 5 1

  28. Slide 28: Use of Non-GAAP Financial Measures: EBITDA

    Use of Non-GAAP Financial Measures: EBITDA Adjusted EBITDA is a non-GAAP financial measure. We present Adjusted EBITDA as a supplemental measure of its performance. This measurement is not recognized in accordance with USGAAP GAAP and should not be viewed as an alternative to USGAAP GAAP measures of

  29. Slide 29: Reconciliation of Non-GAAP Measures to Comparable GAAP measures

    Reconciliation of Non-GAAP Measures to Comparable GAAP measures Quarter Ended March 31, Year Ended March 31, (in million) (in million) 2019 2020 2020 2019 2020 2020 INR INR US$ INR INR US$ Net profit (loss) 241 (394) (5.2) 138 (2,337) (30.9) Income tax expense/ (18) 82 1.1 153 489 6.5 (benefit) Inte

  30. Slide 30: Use of Non-GAAP Financial Measures: Cash Flow to Equity (CFe)

    Use of Non-GAAP Financial Measures: Cash Flow to Equity (CFe) Cash Flow to Equity is a Non-GAAP financial measure. We present CFe as a supplemental measure of our performance. This measurement is not recognized in accordance with U.S. GAAP and should not be viewed as an alternative to U.S. GAAP meas

  31. Slide 31: Cash Flow to Equity (CFe)

    Cash Flow to Equity (CFe) For the year ended For the year ended March 31, 2019 March 31, 2020 (US$ millions) Operating Others Total Operating Others Total Sale of power 131.7 - 131.7 171.9 - 171.9 Cost of operations 11.5 - 11.5 15.2 - 15.2 General and administrative 7.1 10.3 17.4 15.1 17.1 32.3 Depr

  32. Slide 32: Cash Flow to Equity (CFe) – Contd.

    Cash Flow to Equity (CFe) – Contd. (1) Other items from the Statement of Cash Flows: These include most of the items that reconcile “Net (loss) gain” and “Operating profit before changes in working capital” from the Statement of Cash Flows. Other items include: loss on disposal of property plant and

  33. Slide 33: Projects Commissioned - Utility

    Projects Commissioned - Utility As of March 31, 2020 Commercial Duration PPA Capacity DC Capacity Tariff Project Names Operation Off taker of PPA in Credit Rating(6) (MW) (MW) (INR/kWh) Date(1) Years Operational – Utility Punjab 1 (3) Q4 2009 2 2 17.91 NTPC Vidyut Vyapar Nigam Limited 25 AAA Punjab

  34. Slide 34: Projects Commissioned– Utility and C&I

    Projects Commissioned– Utility and C&I As of March 31, 2020 Commercial PPA Duration DC Capacity Tariff Project Names Operation Capacity Off taker of PPA in Credit Ratings5) (MW) (INR/kWh) Date(1) (MW) Years Operational – Utility North & South Bihar Power Distribution Company Bihar1 (4) Q3 2016 10 11

  35. Slide 35: Under Construction and Pipeline Projects –Utility and C&I

    Under Construction and Pipeline Projects –Utility and C&I As of March 31, 2020 Expected Duration PPA Capacity Tariff Credit Ratings(2) Project Names Commercial Off taker of PPA in (MW) (INR/kWh) Operation Date(1) Years Under Construction Assam 1 Q3 2020 90 3.34 Assam Power Distribution Company 25 B+

  36. Slide 36: Debt Overview

    Debt Overview As of March 31, 2020 Maturity Profile (1,2) $600 $510.5 $500 $466.3 $400 $300 $200 $71.7 $85.0 $100 $43.4 $15.1 $0 FY'21 FY'22 FY'23 FY'24 FY'25 - 29 FY'30 & Beyond Debt Split by Currency LT vs ST Debt Split Consolidated Debt (2) $ 1,192.0 INR Debt Foreign Debt Short Term Debt Long Ter

  37. Slide 37: Project Debt Schedule

    Project Debt Schedule As of March 31, 2020 Outstanding Principal Amount (In millions) Type of Interest Currency Maturity Date(1) Name of Project INR US$ (2) Andhra Pradesh 1 2,508 33.3 Fixed INR 2022 Bihar 1 439 5.8 Fixed INR 2022 Gujarat 1 928 12.3 Fixed INR 2022 Karnataka 1 528 7.0 Fixed INR 2022

  38. Slide 38: Project Debt Schedule

    Project Debt Schedule As of March 31, 2020 Outstanding Principal Amount (In thousands) Type of Interest Currency Maturity Date(2) Name of Project INR US$ (5) Punjab 3.1 and 3.2 1,219 16.2 Fixed INR 2024 Chhattisgarh 1.1,1.2 & 1.3 1,296 17.2 Floating INR 2029 Rajasthan 1 475 6.3 Fixed INR 2031 Rajast

  39. Slide 39: Glossary of Select Terms

    Glossary of Select Terms Accelerated Depreciation – Accelerated depreciation can be elected at the project level, such that projects that reach COD in the first half of the fiscal year can expense 100% of eligible project costs in year 1, and otherwise can expense 50% of project costs in year 1 and

  40. Slide 40: Contacts

    Contacts Investor Contact Media Contact Nathan Judge, CFA Samitla Subba ir@azurepower.com pr@azurepower.com +1 (917) 209-6750 +91-11- 4940 9854 39

  41. Slide 41: Thank You

    Thank You 40 40