Altamin Limited · ASX:AZI
Altamin — Alta Zinc — Investor Presentation (November 2020)
17 slides from Altamin's investor presentation, Nov 16, 2020
Slide 1: Alta Zinc Limited: Emerging European Metal Producer
Alta Zinc Limited For personal use only Emerging European Metal Producer INVESTOR PRESENTATION | NOVEMBER 2020 | ASX: AZI ACN: 078 510 988
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT For personal use only This presentation contains summary information about Alta Zinc Limited (Alta Zinc or the Company). Summary of information: This presentation contains general and background information about the Company’s activities current as at the date of the presentatio
Slide 3: Emerging European Metal Producer
EMERGING EUROPEAN METAL PRODUCER For personal use only Positioned to become a long-term and strategic supplier of clean zinc Rönnskär Smelter and lead concentrates located in Western Europe Kokkola Smelter Harjavalta Høyanger Smelter Smelter Odda Results confirm high-grade Low-cost UG drill program
Slide 4: Corporate & Team
CORPORATE & TEAM For personal use only Capital Structure Leveraging a project and corporate team with a strong track record 3,611M $18.1M Geraint Harris Managing Director Mr Harris is a Mining Engineer with over 25 years’ of multi-disciplinary mining industry experience. He has Alexander Burns Execu
Slide 5: A Low-Risk Brownfield Exploration Corridor
A LOW-RISK BROWNFIELD EXPLORATION CORRIDOR For personal use only An extensive Mississippi Valley Type (MVT) zinc district with widespread mineralisation 5
Slide 6: Multiple Lenses, Open on Strike and Dip
MULTIPLE LENSES, OPEN ON STRIKE AND DIP For personal use only High-grade assays currently across >3km strike Extensive and Unexplored Exploration Potential ▪ Well understood mineralisation, historically mined (c.6-8Mt @ 14.4 Zn%) ▪ 8km of historically developed strike, largely focused on extracting
Slide 7: Drilling Towards a Stronger Mineral Resource
DRILLING TOWARDS A STRONGER MINERAL RESOURCE For personal use only Pian Bracca Highlighted Drill Results 1 Hole ID From To Intercept Ag Zn Pb Zn+Pb m m m g/t % % % PBD01 18.0 20.0 2.0 23 13.3 2.9 16.1 PBD01 36.6 47.2 10.6 34 7.2 2.3 9.5 PBD02 23.4 31.9 8.5 19 17.0 2.0 19.1 PBD02 40.3 41.0 0.7 52 21.
Slide 8: Delivering Exploration Success
DELIVERING EXPLORATION SUCCESS ▪ PIAN BRACCA: Drill intersections1 include: For personal use only ▪ PONENTE: Pre-drilling channel sampling1 has shown high grades, including: ▪ 10.7m at 14.8% Zn+Pb and 52g/t Ag from 58.0m (PBD03); 12.1m at 19.4% ▪ 2.4m at 58.8% Zn+Pb and 80g/t Ag (POCH04); and Zn+Pb
Slide 9: Stepping Out the Drilling Footprint
STEPPING OUT THE DRILLING FOOTPRINT For personal use only H2-20/ H1-21 Exploration Programme ▪ Resource extension focusing on several areas, maximising opportunity and diversifying risk ▪ UG drill pads accessed from existing development ▪ Drilling commenced July 2020 ▪ Two rigs currently operational
Slide 10: Jurisdiction & Permitting
JURISDICTION & PERMITTING For personal use only Northern Italy – highly supportive of industrial development and extractive industries Project Status ▪ ESIA and baseline monitoring completed ▪ 20 year mining licence renewal is well underway ▪ Continual dialogue with Italian regulators ▪ Exploration
Slide 11: De-Risked Development: Key Milestones & Catalysts
DE-RISKED DEVELOPMENT For personal use only KEY MILESTONES & CATALYSTS DE- 2020 2021 2022 2023 2024 GORNO PROJECT DEVELOPMENT RISKED STATUS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 ESIA and Baseline Data Collection ✓ Achieved PERMITTING Environmental Monitoring ✓ Ongoing since 2015 Surface
Slide 12: Punta Corna: A European Cobalt / Nickel Project
PUNTA CORNA: A EUROPEAN COBALT / NICKEL PROJECT For personal use only Contiguous veins, so far defined over a strike length of 2.5km and at least 340m of vertical extension • Seven main outcropping linear veins with additional mineralised splays between1 • Recent grab samples up to 3.4% cobalt, 2.5%
Slide 13: Investment Highlights
INVESTMENT HIGHLIGHTS For personal use only Alta has delivered exceptional results and is expanding exploration to build further intrinsic value Drilling at Pian Bracca has been highly successful and is intersecting high-grade and thick zinc and lead/silver DELIVERY mineralisation, with historical s
Slide 14: Contact
CONTACT For personal use only Alta Zinc Limited Level 3, Suite 3.5 9 Bowman Street South Perth, WA 6151 Australia Tel: +61 (0) 8 9321 5000 Email: info@altazinc.com www.altazinc.com 14
Slide 15: Clean and Simple Metallurgy
CLEAN AND SIMPLE METALLURGY For personal use only Gorno will produce some of the cleanest and highest grade globally available concentrates Clean and high grade concentrates1 ▪ Concentrate recoveries of 96% for zinc and 74% for lead ▪ Zinc concentrate grade of 63.3% Zn (1.66% Si and 0.62% Fe) ▪ Lead
Slide 16: Strong Local and Governmental Support
STRONG LOCAL AND GOVERNMENTAL SUPPORT For personal use only Support at all levels to reopen the Gorno Mine Published in Araberara Newspaper – 21 February 2020 “We are sure that a project for the development of a mine, involving also in the area of Gorno municipality, can be considered unique and it
Slide 17: Competent Persons Statement
COMPETENT PERSONS STATEMENT For personal use only Information in this presentation that relates to Exploration Results is based on information prepared or reviewed by Dr Marcello de Angelis, a Competent Person who is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM). Dr de Ang