Sky Metals Limited · ASX:SKY

Sky Metals — Planet Gas — CSG 2011

25 slides from Sky Metals's conference presentation, May 31, 2011

  1. Slide 1: CSG 2011

    Slide 1: CSG 2011

    CSG 2011 Planet Gas and CBM Ltd May 31, 2011

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer This presentation may contain forward looking statements which involve subjective judgment and analysis and are subject to significant uncertainties, risks and contingencies including those risk factors associated with the oil and gas industry, many of which are outside the control of and

  3. Slide 3: Company Snapshot

    Slide 3: Company Snapshot

    Company Snapshot TEAM: – Highly qualified Board and management team PROJECTS: – Low risk CBM exploration onshore Australia, in areas of existing production and infrastructure (5,579 km2) – Low risk conventional oil and gas exploration onshore Australia, in area of existing infrastructure (1,972 km2)

  4. Slide 4: Market capitalisation peer group comparison

    Slide 4: Market capitalisation peer group comparison

    May 31, 2011 Market capitalisation (M$A) 0 100 200 300 400 500 600 700 800 Eastern Star Gas Dart Energy Senex Energy Bow Energy Molopo Energy European Gas Redfork Energy AJ Lucas Icon Energy Innamincka Planet Gas peer group Metgasco L&M Energy Westside Corp Central Petroleum Blue Energy Exoma Energy

  5. Slide 5: Planet Gas CBM Highlights 2010

    Slide 5: Planet Gas CBM Highlights 2010

    Planet Gas CBM Highlights 2010  Executed a farm‐in agreement for 50% equity in three Coal Bed Methane prospective PELs 468, 469 and 470 in New South Wales, covering 5579 km2  Progressed to phase 2 of the farm‐in, and commenced planning for the acquisition of 80 line km of seismic and the drilling

  6. Slide 6: Why NSW CBM?

    Slide 6: Why NSW CBM?

    Why NSW CBM ? Projects with development approval Power station Location Owner Technology Capacity Bamarang Stage 1 Nowra Delta Electricity OCGT 400 MW Bamarang Stage 2 Nowra Delta Electricity conversion to Base load CCGT Bayswater B Bayswater Macquarie Generation CCGT or Ultra- 2000 MW Power Station

  7. Slide 7: Why NSW CBM - Sydney Basin

    Slide 7: Why NSW CBM - Sydney Basin

    Why NSW CBM ‐ Sydney Basin Sydney Basin Area 49,000 Km2 Formation age Late Permian Coal type/ maturity High to Medium Vol/ %VR: 0.8‐1.5 Depth 300 ‐ 1000 m Net coal thickness 15 ‐ 60 m Gas content 5.0‐ 25.0 m3/ton Permeability 1– 15 mD Recovery factor 65% (10 to 15 years) 1‐3 Seams/well (up to 20 sea

  8. Slide 8: CBM - Bylong PEL 468

    Slide 8: CBM - Bylong PEL 468

    CBM ‐ Bylong PEL 468 • Bylong is 1,736km2, located on the boundary of the Gunnedah Basin and Sydney (Hunter Coalfield) Basins • 300km NW of Sydney and approximately equidistance to the regional centres of Dubbo, Tamworth and Newcastle • Some 48 drillholes present, mostly NSW Government commissioned

  9. Slide 9: CBM - Bylong PEL 468

    Slide 9: CBM - Bylong PEL 468

    CBM ‐ Bylong PEL 468 Apollo PEL 456C PR: 2TCF CR: 0.9TCF Apollo Cuan-1 Coal 78.5m, 15m3//tonne AGL PEL 4 2P : 8PJ 3P : 10PJ 9 May 31, 2011

  10. Slide 10: CBM - Bylong PEL 468

    Slide 10: CBM - Bylong PEL 468

    CBM ‐ Bylong PEL 468 Poggy-1&3 wells Total Coal : 23m 10 May 31, 2011

  11. Slide 11: CBM - Mooki PEL 470

    Slide 11: CBM - Mooki PEL 470

    CBM ‐ Mooki PEL 470 • Mooki covers some 670km2, located between the regional centres of Moree and Narrabri in the Northern Gunnedah Basin • The eastern boundary of the prospect is adjacent to the Hunter‐Mooki fault, a regional structure active throughout deposition of the coal measures and a depo‐ce

  12. Slide 12: CBM - Mooki PEL 470

    Slide 12: CBM - Mooki PEL 470

    CBM ‐ Mooki PEL 470 Orion PEL 427 PR: 2458 PJ CR : 751 PJ Orion PEL 6 PR: 1160 PJ CR : 152 PJ ESG Edgeroi wells Coal 42.5m, “gassy” Eastern Star PEL 238 CR : 4040 PJ 12 May 31, 2011

  13. Slide 13: CBM - Mooki PEL 470

    Slide 13: CBM - Mooki PEL 470

    CBM ‐ Mooki PEL 470 Bellata-1 well Total Coal : 15.2m 13 May 31, 2011

  14. Slide 14: CBM - Shoalhaven PEL 469

    Slide 14: CBM - Shoalhaven PEL 469

    CBM ‐ Shoalhaven PEL 469 • Shoalhaven covers 3,173km2, located in Southern Coalfield of the Sydney Basin • Illawarra coals are prospective and are up to 15 metres thick for the Clyde Measures and more than 25 metres for the Illawara Measures • High to very high coal reflectance for these seams • His

  15. Slide 15: CBM - Shoalhaven PEL 469

    Slide 15: CBM - Shoalhaven PEL 469

    CBM ‐ Shoalhaven PEL 469 AGL PEL 2 2P: 154 PJ 3P: 201 PJ Apex PEL 454 Apex PEL 442 CR: 1.64 TCF 2P: 58 PJ 3P: 210PJ CR : 1360 PJ 15 May 31, 2011

  16. Slide 16: CBM - Shoalhaven PEL 469

    Slide 16: CBM - Shoalhaven PEL 469

    CBM ‐ Shoalhaven PEL 469 Moonshine-4 well Total Coal : 15m 16 May 31, 2011

  17. Slide 17: CBM Sydney and Gunnedah Basins

    Slide 17: CBM Sydney and Gunnedah Basins

    CBM Sydney and Gunnedah Basins Planet Gas is farming in to three PELs for 50%, in three phases Phase 1 ‐ Data acquisition and Due Diligence completed Phase 2 ‐ Commenced October 2010 ‐ Acquisition and processing of a total of 80 line kms of seismic ‐ Drilling and testing of a single open hole in PEL

  18. Slide 18: Implementation update 2011-12

    Slide 18: Implementation update 2011-12

    Implementation update 2011‐12 • Coal Bed Methane Sydney & Gunnedah ‐ Spud the first of 3 exploration coreholes mid‐end Jun 2011 ‐ Release Contingent Resources post‐drilling (August) • Coal Bed Methane Cooper ‐ Sign farm‐in arrangements on PELA 514 prior to executing PEL with PIRSA ‐ Execute PEL with

  19. Slide 19: CBM Sydney and Gunnedah Basins

    Slide 19: CBM Sydney and Gunnedah Basins

    CBM Sydney and Gunnedah Basins • Planet’s CBM acreage is in the main CBM play fairway in the Sydney and Gunnedah Basins close to existing or planned infrastructure and market • Third Party pre‐drill, un‐risked, whole block GIP estimates based on proximal wells c. 2 TCF (PJ) per PEL, using gas concen

  20. Slide 20: CBM Development Strategy/Community

    Slide 20: CBM Development Strategy/Community

    CBM Development Strategy/Community Multi well screened drilling pads • Reduce amount of land required and number of individual sites (single=2.5 acres, multi 4 acres) • Reduce overall environmental and visual impact • Reduce capital expenditures and lower production costs by allowing more wells per

  21. Slide 21: PELA 514 - CBM prospectivity

    Slide 21: PELA 514 - CBM prospectivity

    PELA 514 ‐ CBM prospectivity PELA 514 • Successfully tendered Q3, 2009 • Area 1972 km2 • Close to existing infrastructure • Proven working petroleum system • Currently under ILUA process • Conventional Oil & Gas plays • Shale gas potential • CBM potential, coal bed thickness up to 41m in the Toolach

  22. Slide 22: PELA 514 - CBM prospectivity

    Slide 22: PELA 514 - CBM prospectivity

    PELA 514 ‐ CBM prospectivity • Net coal pay zones calculated using a density cut‐off of 1.75 g/cc. or in its absence a Sonic log cut off of 110 μsec/ft • For volumetrics a log derived average coal density of 1.4g/cc was applie • Blanket gas content of 8m3/tonne used in calculations May 31, 2011 22 M

  23. Slide 23: Cooper PELA CBM

    Slide 23: Cooper PELA CBM

    Cooper PELA 514 CBM • PELA 514 lies close to existing oil and gas producing fields and underutilised pipeline infrastructure in the Cooper Basin • Coals present across the permit area : maximum thickness 41m in the Toolachee and 51m in the Patchawarra • CBM potential identified in 9 different areas

  24. Slide 24: Planet Gas and CBM

    Slide 24: Planet Gas and CBM

    Planet Gas and CBM • Three well addressed CBM prospective PEL’s (Sydney/Gunnedah) ‐ Exploratory drilling imminent ‐ Bylong will be first in sequence • Large potential CBM resources in Cooper Basin PELA 514 ‐ Thick, extensively mapped, coals ‐ Exploration can be “piggy backed” on conventional explora

  25. Slide 25: Planet Gas Limited contact

    Slide 25: Planet Gas Limited contact

    Planet Gas Limited 66, Hunter Street, Sydney NSW 2000 Australia +61 2 9300 3322 +61 2 9221 6333 Contact • Ian Halstead, CEO The information in this report that relates to Exploration Results is based on information compiled by Mr Ian Halstead, geologist, who is a Member of the American Association o

Source: Internet Archive copy of skymetals.com.au

More decks from Sky Metals Limited

All 43 Sky Metals decks