Chalice Gold Mines — Investor Presentation (June 2009)
19 slides from Chalice Gold Mines's investor presentation, June 2009
Slide 1: A New East African-Focused Gold Company
“A New East African- African-Focused Gold Company” www.chalicegold.com Corporate Presentation June 2009
Slide 2: Disclaimer
Disclaimer The material used in this presentation is intended to be a summary of the proposed merger between Chalice Gold Mines Limited and Sub-Sahara Resources NL and includes activities that are current and proposed based on the information available to Chalice Gold Mines Limited as at 3rd June 20
Slide 3: Overview
y Well-funded ASX-listed gold company (ASX: CHN) y Strong track record in successful development & operation of mining projects y Proposed merger with Sub-Sahara Resources NL targeted for completion by August 2009 y Strategy to consolidate ownership and fund development off 944,000oz 944 000 hihigh
Slide 4: Corporate Snapshot
y Listed on ASX since 2006 Board y 72.8M shares on issue – top 20 Tim Goyder (Executive Chairman) hold 56 56.6% 6% Doug Jones (Managing Director) y ~$10M cash Anthony Kiernan (Non-executive Director) y Portfolio of gold and base metal exploration projects in WA – JV’s with Teck Cominco, Atlas Iron,
Slide 5: Merger Overview
y Chalice and Sub-Sahara to merge via Scheme of Arrangement, subject to consents and approvals y Scheme consideration will comprise 1 Chalice Share for every 10.73 10 73 Sub-Sahara S bS h Shares Sh y Fully y supported pp by y both Boards y Deemed to be in best interests of Sub-Sahara shareholders by
Slide 6: Indicative Merger Timetable (subject to change)
Scheme Booklet lodged with ASX and ASIC 2 June 2009 First Court Hearing 18 June 2009 Despatch of Notice of Meeting & Scheme Booklet to SBS Shareholders 23 June 2009 Scheme Meeting 22 July 2009 Second Court Hearing 30 July 2009 Lodging of Court Order with ASIC 6 August 2009 Indicative Merger Timetabl
Slide 7: Post Merger Snapshot
Post Merger Board y Approximately A i t l 121M shares h on issue on completion of the merger Tim Goyder (Executive Chairman) Doug Jones (Managing Director) y Postt merger market P k t capitalisation it li ti of ~A$30M (based on Chalice Mike Griffiths (Executive Director) share price of $0.25) Anthon
Slide 8: Zara Gold Project – Location
Zara Gold Project – Location 8
Slide 9: Eritrea Overview
y Stable operating and social environment y Increasing foreign investment, e.g. US$250M Bisha development (Nevsun Resources) y Proactive Government stance on mining developments – “open for business” y Zara Project tenements located 160km NW of capital, Asmara Eritrea Overview 9
Slide 10: Gold in the Arabian-Nubian Shield
y An emerging gold and base metal province y Numerous +1Moz deposits and mines dating back to ancient times y Gold endowment >20Mozs – but largely unexplored in modern times y Various deposit types including mesothermal & epithermal gold and polymetallic (VHMS) styles y Associated with structural co
Slide 11: The Zara Gold Project
y Koka Deposit - JORC compliant Indicated and Inferred resource of 5.04 Mt grading 5.8 g/t gold for 944,000 oz contained y Current resource based on results from 109 diamond drill holes (~18,000 metres drilled) y 570 metres strike length y 20 30 metres wide 20-30 y Drilled to a depth of 300 metres y
Slide 12: Koka Deposit - Mineralisation
y Quartz stockwork system cutting micro-granite sill Galena y Limited oxide – bulk of Visible Gold resource is primary sulphide Pyrite y y Coarse sulphide blebs associated with quartz veins y Visible gold & high gold values associated with pyrite, galena, sphalerite & minor chalcopyrite y Metallurgi
Slide 13: Koka Deposit - 3D Model
13 3D Model Koka Deposit - XN
Slide 14: Koka Deposit – Section 9840N
33m @ 4.17 g/t 28m @ 8.16 g/t 18m @ 9.46 g/t 7m @ 23.29 g/t Koka Deposit – Section 9840N 14
Slide 15: Koka Deposit – Section 9520N
W E 10m @ 76.8 g/t 11m @ 14.7 g/t 6m @ 42.3 g/t Koka Deposit – Section 9520N 15
Slide 16: Exploration Upside … virtually untouched
New Permit y Major regional scale structural corridor controls gold occurrences Tenements T t cover 50k 50km strike t ik Koka Prospect y on this corridor (approx 600km² including new permits to north and south) Konate Prospect Fah Prospect y Numerous prospects identified from artisanal g gold workin
Slide 17: Forward Program
y Complete p Prefeasibility y Study y by y October 2009 y Complete Feasibility Study by May 2010 y Experienced ‘Owner’s Owner s Representative Representative’ appointed – metallurgist Steven Chadwick y ‘Request for Proposal’ or PFS and FS dispatched to 5 engineering consulting lti firms fi y Site pr
Slide 18: Summary – Investment Proposition
y Focused growth strategy via proposed Sub Sub-Sahara Sahara merger y Rare opportunity to develop a high-grade high grade open-pit open pit gold project y Sub-Sahara portfolio includes extensive tenement position in emerging gold & base metal province y Work commencing on the ground while merger is
Slide 19: Competent Persons Statement
Competent Persons Statement The information in this report that relates to Exploration Results is based on information compiled by Dr Doug Jones, Jones a full-time full time employee and Director of Chalice Gold Mines Limited, who is a Member of the Australasian Institute of Mining and Metallurgy an
Chalice Gold Mines — Investor Presentation (June 2009) on 6ix