Suntech Infra Solutions Limited · NSE:SUNTECH
Suntech Infra Solutions — H2 FY26 Earnings Presentation
42 slides from Suntech Infra Solutions's earnings presentation, May 21, 2026
Slide 1: Investor Presentation filing cover letter to NSE
Date: 21.05.2026 To Listing Compliance Department National Stock Exchange of India Ltd, Exchange Plaza, C-1, Block G, Bandra Kurla Complex, Bandra (E), Mumbai – 400 051 NSE Symbol: SUNTECH ISIN: INE0SGZ01016 Subject: Investor Presentation Dear Sir / Madam, Pursuant to Regulation 30 read with Schedul
Slide 2: H2 & FY26 Investor Presentation
SUN TECH SUNTECH INFRA SOLUTIONS LIMITED H2 & FY26 INVESTOR PRESENTATION
Slide 3: Disclaimer
DISCLAIMER This presentation and the accompanying slides (the “Presentation”), which have been prepared by Suntech Infra Solutions Limited (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for an
Slide 4: H2 FY26 Highlights
H2 FY26 Highlights
Slide 5: Who we are
Who we are • Founded in 2009 • Pan India Infrastructure Execution Company Core Business Verticals • Foundation & Piling • Civil & Superstructure • Equipment Rental Our Strength • 100+ Owned Machines • 750+ Team Members • Strong Execution & Delivery Capabilities Key Focus Sectors • Refineries • Power
Slide 6: Meet Our Senior Leadership
MEET OUR SENIOR LEADERSHIP Mr. Gaurav Gupta TEAM (Chairman & MD) At Suntech Infra Solutions, our leadership team drives excellence Mr. Parveen Gupta Mrs Shikha Gupta Mr. Varun Chug with expertise, (Whole time Director) (Non executive director) (Independent director) vision, and a passion for innovat
Slide 7: Why Suntech
Why Suntech Strong Asset Heavy In-house fleet execution Repeat Model gives execution capability in Business control tight timelines Suntech Infra Solutions stands as one of India’s most trusted partners for foundation and ground engineering works, equipped with 150+ machines, a highly skilled workfo
Slide 8: Our Services
Our Services Bored Piles Ground Retention Te s t i n g Equipment Civil Works Improvement System Works Rental Services • Bored Cast-in situ Piles • Stone Columns – Top/ • Piling Rigs • Driven Cast-in-situ Piles • Pile Caps Bottom Feed • Boom Placers • Precast spun & sheet • Infrastructure Projects •
Slide 9: H2 FY26 Key Ratios
H2 FY26 KEY RATIOS Total Income EBITDA PAT 11020 3000 1200 1072.8 9540 2500 2456.07 970.41 2233.1 1000 2000 800 1500 600 1000 400 500 200 0 0 H2 FY25 H2 FY26 H2 FY25 H2 FY26 H2 FY25 H2 FY26 Total Income EBITDA 1,600.00 PAT 3822.09 1,400.00 1,375.25 3,821.50 20,000.00 1,202.08 17,916.16 1,200.00 18,0
Slide 10: H2 FY26 Highlights
H2 FY26 Highlights Particulars H2 FY26 H2 FY25 YoY FY26 FY25 YoY Net Sales 10,863.63 9,478.87 17,627.37 15,265.10 Other Income 156.58 61.45 288.79 177.48 Total Income 11,020.21 9,540.31 16% 17,916.16 15,442.58 16% Raw Material Expenses 4,061.79 2,866.74 6992.79 4,016.27 Employee Benefit Expenses 1,4
Slide 11: Key Business Performance – FY26
KEY BUSINESS PERFOMANCE – FY26 STRONG ORDER BOOK PROVIDING FY27 REVENUE VISIBILITY Segment Order Book (₹ Cr) Executable in FY27 (₹ Cr) Job Work 208.75 197.25 Rental 5.69 5.69 Total 214.44 202.94 Healthy Order Book Ensuring Strong FY27 Execution Pipeline • Total Order Book stood at ₹214.44 Cr as on A
Slide 12: Strategic Capital Investments Powering Scalable Expansion
Strategic Capital Investments Powering Scalable Expansion Capex (₹ Cr ) Total Fleet Size (nos) 100 FY26 27.60 90 FY25 18.75 FY25 FY26 0.0 0 5.0 0 10. 00 15. 00 20. 00 25. 00 30. 00
Slide 13: Growth Strategy
Growth Strategy ROBUST ORDER BOOK POSITION Sustainable Business Growth • Strong order book of ₹214.44 Cr with ₹202.94 Cr executable in FY27, ensuring healthy revenue visibility. 20–25% EXPANDING MARKET PENETRATION Annual Revenue Growth Focused on long-term value creation over • Direct engagement wit
Slide 14: Company Overview
& Company : Overview
Slide 15: Strong Projects. Strong Culture. Strong People.
Strong Culture. 3 HR Culture Strong People. S Strong Projects.
Slide 16: Team Work
Professional Team Team Work
Slide 17: Launch of HSE & Quality Policies
Launch of HSE & Quality Policies POLICES & MANUAL Suntech Infra has officially launched its HSE (Health, Safety & Environment) and Quality Policies to reinforce its commitment towards safe operations, zero-incident worksites, and excellence in project delivery. These policies establish clear guideli
Slide 18: HSE Standards and Recognition
HSE Standards and recognition @Safe environment www.suntechinfra.com
Slide 19: HSE Standards and Recognition
HSE Standards and recognition @Safe environment www.suntechinfra.com
Slide 20: HSE Standards
HSE Standards @Inspections www.suntechinfra.com
Slide 21: HSE Standards
HSE Standards @Environment and awareness www.suntechinfra.com
Slide 22: Key Projects at Suntech Infra Solutions – Ongoing
Key projects at Suntech Infra Solutions – On going
Slide 23: Deepak Group
DeepakGroup Deepak Chem Tech Limited (DCTL), a subsidiary of Deepak Nitrite Ltd, is investing around ₹5,000 crore to establish a 165,000 MTPA polycarbonate (PC) resin plant at Dahej, Gujarat, with commissioning targeted by Q4 FY2028. The greenfield project aims to manufacture high-quality engineerin
Slide 24: Polycarbonate, Offsite and Utilities, Bharuch Gujarat
Polycarbonate, Offsite and Utilities, Bharuch Gujarat Deepak Chem Tech Limited • Project Value : 54.75 cr. • PMC : Technip Energies India Limited • Project Duration : 9 months • Scope of works Bored Piles - Type I (500 mm dia.) : 22,221 meters(13.5 m) - Type II (600 mm dia.) : 50,394 meters (18.5m)
Slide 25: Linde Bored Piling Works at Dahej
Linde Bored Piling Works at Dahej • Project Value : 6.8 cr. • Owner : Deepak group • Scope of works • Bored Piles - 600 mm dia. : 615 Nos - Depth of pile : 11m-30m - Load testing works : 12 Nos - Grade of Concrete : M30 • Plant and Machines : 2 Rigs +2 Cranes No of piles – 13 Nos ~ 2% Completed
Slide 26: Indo Asia Copper
IndoAsiaCopper Indo Asia Copper Limited is planning a greenfield integrated copper smelter and refining plant in Amreli, Gujarat. The project aims to produce 10 lakh tonnes of copper per year along with 16.5 lakh tonnes of fertilizers annually, and will include a precious metal recovery unit, making
Slide 27: Integrated copper smelter and refining plant, Gujarat
Integrated copper smelter and refining plant, Gujarat Indo Asia Copper • Project Value : 38.17 Cr. • Consultant : Dongneng Zhuohuan Survey & Design • Scope of works • Bored Piles - Trial works (600 mm) : 5 Nos - Trial works (750 mm) : 5 Nos - Main works (600 mm) : 3,150 Nos - Depth of Piles : 30 m -
Slide 28: L&T Construction – NTPC Gadarwara
L&TConstructio NTPC Gadarwara Super Thermal Power Project in Madhya Pradesh is an operational 1600 MW coal-based power plant comprising two units of 800 MW each. NTPC is planning a Stage-II expansion with an additional 2 × 800 MW ultra-supercritical units, for which Larsen & Toubro (L&T) has been aw
Slide 29: NTPC Gadarwara Super Thermal Power
NTPC Gadarwara Super Thermal Power L&T Constructions • Project Value : 19 cr. • Owner / Consultant : NTPC • Scope of works • Bored Piles - 600 mm dia. : 138 Nos - 750 mm dia. : 1,747 Nos - 1,000 mm dia. : 1.400 Nos - Depth of Piles : 28 meters - Reinforcement : 4,435 MT - Load testing works : Initia
Slide 30: Virat Ramayan Mandir
ViratRamayanMandir Viraat Ramayan Mandir Project, located in East Champaran, Bihar, is a large-scale temple development by the Mahavir Mandir Trust aimed to become the world’s largest Hindu temple upon completion. Inspired by Angkor Wat and major South Indian temple architecture, the ₹500 crore, thr
Slide 31: Virat Ramayan Mandir, Bihar
Virat ramayan Mandir, Bihar Asia’s Tallest Shivling – 33 Feet • Project Value : 43.92 cr. (Piling Works Completed, Civil in progress) • Consultant : Tata Consultancy • Scope of works • Bored Piles - 500 mm dia. : 2,591 Nos - 600 mm dia. : 267 Nos - 750 mm dia. : 452 Nos - Depth of pile : 23 meters -
Slide 32: NTPC Thermal Power Plant
NTPC,ThermalPowerPlant The Nabinagar Super Thermal Power Project in Aurangabad district, Bihar, is being developed by Nabinagar Power Generating Company (NPGC), a joint venture of NTPC and Bihar State Electricity Board. Phase I comprises 3 × 660 MW units (1,980 MW), using coal from the North Karanpu
Slide 33: Tata Projects, Nabinagar
Tata Projects, Nabi Nagaar Bored Piling Works at Thermal Power Plant • Project Value : 17.94 cr. • Consultant : Tata Projects • Scope of works • Bored Piles - 600 mm dia. : 1,160 Nos - 750 mm dia. : 40 Nos - Depth of pile : 22 meters - Reinforcement : 794 MT - Load testing works : Initial & Routine
Slide 34: BCIS Piles at Gurgaon Project
BCIS Piles at Gurgaon Project Project Summary • Contracts Summary – Work Order 1 (SP2) • Project Value : 24.13 cr. • No of Piles : 446/446 Nos • No of Pile Chipping : 314/446 Nos • No of load testing : 5/9 Nos (Dynamic tests) • Contracts Summary – Work Order 2 (SP3) • Project Value : 0.47 cr. + GST
Slide 35: Execution Capability
Execution Capability 1.65 lakh+ piles 425+ projects 18 lakh+ cubic 37.5 lakh+ completed executed meter running meters concreting @ Operations www.suntechinfra.com Capability
Slide 36: Annual Financials
Annual Financials
Slide 37: Key Financial Highlights
KEY FINANCIAL HIGHLIGHTS Revenue EBITDA PAT EBITDA Margin PAT Margin 4,50 0.00 17,627.37 35. 00 4,00 0.00 3,821.50 3,822.09 15,265.10 28.65 3,50 0.00 30. 00 3,00 0.00 24.75 2,738.40 25. 00 2,50 0.00 21.33 9,559.45 20. 00 2,00 0.00 15. 00 1,50 0.00 1,375.25 1,202.08 1211.36 12.57 10. 00 1,00 0.00 7.9
Slide 38: Profit & Loss Statement
PROFIT & LOSS STATEMENT In ₹ Lakhs Particulars FY26 FY25 FY24 Revenues 17,627.37 15,265.10 9,559.45 Other Income 288.79 177.48 66.02 Total Income 17,916.16 15,442.58 9,625.48 Expenditure Raw Materials 6992.79 4,016.27 2,077.50 Employee costs 2614.52 2,510.32 1,843.78 Other expenses 4486.76 5,094.49
Slide 39: Balance Sheet
BALANCE SHEET In ₹ Lakhs Equities & Liabilities FY26 FY25 FY24 FY23 Assets FY26 FY25 FY24 FY23 Equity 1,936.26 1,538.82 256.47 241.53 Non-Current Assets Reserves 7,562.66 3,496.82 3,567.81 2,390.32 Fixed Assets 7,853.76 6,607.62 6,230.39 5,630.57 Net Worth 9,498.92 5,035.64 3,824.28 2,631.85 Deferre
Slide 40: Key Ratios
KEY RATIOS ROE In % ROCE In % Debt to Equity In Times 31.43 1.47 1.43 20.18 24.06 17.50 13.95 0.82 14.48 FY24 FY25 FY26 FY24 FY25 FY26 FY24 FY25 FY26 Current Ratio Earnings Per Share In Times In ₹ 1.65 11.05 1.43 1.10 7.48 6.21 FY24 FY25 FY26 FY24 FY25 FY26 INVESTOR PRESENTATION 39
Slide 41: Stock Data
STOCK DATA As on 18/05/2026 As on 31/03/2026 SHAREHOLDING PATTERN NSE CODE: SUNTECH | INE0SGZ01016 Share Price (₹) 36.00 30.36% Market Capitalization (₹ Cr) 69.71 No. of Shares 1,93,62,600 69.64% Face Value (₹) 10.00 52 week High-Low (₹) 110.00 – 30.00 Promoter & Promoter Group Public INVESTOR PRESE
Slide 42: Thank You!
THANK YOU! Execution Builds Trust. Trust Builds Growth Suntech Infra Solutions Limited 604/05/06, NDM 2 Building, Netaji Subhash Place, Pitampura, New Delhi, Delhi, 110034 Phone: +91 9818265777 Email: info@suntechinfra.com Website: www.suntechinfra.com Investor Relations Advisor EquibridgeX Advisors