Australian Mines Limited · ASX:AUZ
Australian Mines — The Mining 2004 Resources Convention
25 slides from Australian Mines's conference presentation, Nov 3, 2004
Slide 1: ASX cover letter: Mining 2004 Resources Convention presentation
Australian Mines Limited (>) aN 68-073 914 195 Level 1, 681 Murray Street, West Perth, Western Australia 6005 Tek: 08-9481 5811 Fax: 08-9481 5611 Email: office@australianmines.com.au 3" November 2004 Company Announcements Office Australian Stock Exchange Limited 10" Floor 20 Bond Street SYDNEY NSW 2
Slide 2: Australian Mines Limited - Mining 2004
Slide 3: Executive Summary
Slide 4: Share Structure
Slide 5: Share Price
Share Price’
Slide 6: Project locations map
a — — ee I - is ey y ay ayy SC Ve Ly ; Vie ee — — — = = — = = See — ~ oS — ~ oo = < ten ee ae ¢< Soiden Ridge AGC Se SENS os ‘oon ‘Boiith (Au) , , if i : 7 71 if —_ SCE BLAIR PROJECT | \ : San SS ‘as Martin (AU, 1 Celebration (Av) cuniva ri ou L i oe lode ee i & pe Ley 4 a " [ 4 ver 2k Leg LD eS LEG
Slide 7: Blair – Reserves
Blair — Aer:
Slide 8: Blair – Reserves & Resources
Slide 9: Blair – Production Results
Slide 10: Blair Underground
Blair S Pro y
Slide 11: Blair Nickel Mine Geology Plan
1090mMRL Blair Nickel Mine Geology Plan TAS 5.1% Ne aia 2 6.2% 8 a "htt 7am G85 \ AREA 57 BONIS 8.2m 1 207% Hi S = oe 2) O : & 'e) N © ~ Or HERE era soe 6 cht MRE 90 Suri ore icon GO085.0- tds BEI 1¢ Bla
Slide 12: Surface
01 Surface
Slide 13: Blair – Unmined Shoots
Blair — Unmined Shoots a na meas 2.35m @ 10.21% Ni 32m @ 10.75% Ni 2.94m @ 4.06% Ni §.66m @ 3.18% Nip
Slide 14: Blair Future
Blair Futur - y
Slide 15: Blair – Exploration
Slide 16: Blair Project Nickel Resource Targets
BLAIR PROJECT Nickel Resource Targets Marshall 4m @ 2.55% Ni from 78m: oe T Under explored section a of prospective contact beneath soil cover i Blair South | 4m @ 1.86% Ni from 224m 1.8m @ 2.32% Ni from 170.6m im @ 2.4% Ni from 477.3m et ie y Duptex Hilt Anomaly 11 @ 1.54% Ni from 36m 6.1m @ 1.32%
Slide 17: Blair
Blair | Blair west | BH N40 Contact | [sees] 9
Slide 18: Anomaly – Long Section
Anomaly 11 — Long Section AMRC016 9m @ 0.88% Ni AMRCOIS || _ 14m @ 1.18% Ni ~ incl 2m @ 1.54% Nif incl 3m @ 2.33% Ni i 19 10m: @ 10% Ni ll 4 : om @ 0.58% Ni incl 3m @ 1.48% Ni ff] ° AMRCO18 1m @ 0.49% Ni AMRCO017 5m @ 0.65% Ni incl 1m @ 1.09% Ni LEGEND 4 i?) WE + 15% mi ( 10-15%mNi 7-10%m Ni [] 5-7%
Slide 19: Eastern Ultramafic Sequence section
Pe HERE ae Bay Ly a ._ ee . | Le, _ Lo a : Eastern Ultramafic Sequence (off Litt position) Gyo ein 789m @ 0.64% Ni / incl 1.53m @ 4.00% Ni ran caramels | edi sce suli fich
Slide 20: Blair Project Gold Resource Targets
Blair Regio So _ shone | GOAT 118 FOOTER | 2m @ 6.88 gft Au from 47m i7m @ 2.81 git Au from surface 7 | GOLDEN RIDGE MINE @ (Gold) | SOIL ANOMALY } Up to 119 ppb Au | SOIL ANOMALY Up to 72 ppb Au SOIL ANOMALY Up to 82 ppb Au ABO me BLAIR PROJECT Gold Resource Targets FLYING ANT e 8m @ 4.29 git Au fr
Slide 21: Gold drill hole pierce points
“Fim@ 26tgtAu| ‘[im@zsigtau| 4m @ 1.25g/t Au] im @ 2.72git Au} _ [am @ 2.29git Au 3m @ 2.09g/t Au LEGEND a WE +10 g/mAu +5. gim Au [1] +1 9mAu ; cs Drill Hole Pierce Point a _———_
Slide 22: Footer gold intercepts
18 Footer — 4m @ 1.26 git Au So So
Slide 23: Blair Potential
Blair Poten / : | AUZ. )
Slide 24: Australian Mines
Austr alian
Slide 25: Australian Mines Limited - Mining 2004
Australian Mines — The Mining 2004 Resources Convention on 6ix