Slide 1: ASX Announcement: Investor Presentation
ASX Announcement For personal use only 1 September 2014 Investor Presentation Attached is a copy of the Investor Presentation that Managing Director Scott Huffadine will be giving over the next two weeks as part of a domestic and international roadshow. -ENDS- For more information please contact: In
Slide 2: The Way Linggo Project: High Grade and Low Cost Mines
For personal use only The Way Linggo Project High Grade and Low Cost Mines Investor Update August 2014 ASX:KRM
Slide 3: Disclaimer & Competent Persons Statement
Disclaimer & Competent Persons Statement The information contained in this Presentation has been prepared by Kingsrose Mining Limited (“Kingsrose” or the “Company”). This Presentation does not constitute an offer or invitation to any person to subscribe for or apply for any securities in the Company
Slide 4: Corporate Overview
Corporate Overview Key Statistics (ASX:KRM)1 Directors & Management For personal use only Shares on issue 359 million John Morris Chairman Share Price ~50c Scott Huffadine Managing Director Market Cap ~$180 million Bill Phillips Non Exec Director Av. Daily Volume ~240,000 Andrew Spinks Non Exec Dire
Slide 5: Recent Milestones and Achievements
Recent Milestones and Achievements (past 12 months) Management refreshed – Scott Huffadine commenced as MD and Matthew Smith For personal use only as CFO – January 2014 Whole of operation review - implemented operational/geological strategy Increased focus on safety – site 12 months LTI free
Slide 6: Project Location – “Rim of Fire”
Project Location – “Rim of Fire” Located on the prolifically mineralised Trans-Sumatran Fault For personal use only Extensive and strategic landholding located in the “Rim of Fire” on the Trans-Sumatran Fault Zone World’s second most significant source of Tertiary Age gold deposits +1Moz Au pr
Slide 7: Way Linggo Project – Current Status
Way Linggo Project – Current Status Talang Santo Mine - production ramp up For personal use only in progress, with opportunity to expand via exploration from existing development Talang Samin - advanced exploration play with potential to increase production profile 15 existing targets across b
Slide 8: Talang Santo Mine
Talang Santo Mine No further capex required to return to Talang Santo JORC Mineral Resource For personal use only (Indicated & Inferred) production 1.6mt @ 5.4g/t Au and 17g/t Ag Located 17km from 140,000tpa Merrill Crowe gold circuit (expandable to 200,000tpa) via Forecast Steady State Metrics
Slide 9: Talang Santo Mine
For personal use only Talang Santo Mine 8
Slide 10: Talang Santo Mine- Production Ramp up
For personal use only Talang Santo Mine- Production Ramp up 9
Slide 11: Talang Santo Mine - Production Ramp up
For personal use only Talang Santo Mine - Production Ramp up Key Activities Primary focus on setting up sublevels for commencement of room & pillar stoping in September Increase in working faces from 9 to 17 as part of establishing production profile Internal Shaft from 3 to 4 Level underway a
Slide 12: Talang Santo – The Upside
For personal use only Talang Santo – The Upside Talang Santo part of a much larger system, with mineralisation proven in multiple orientations, open at depth and targets along strike Large mineralised system preserved, drilled and open to 500m depth Mineralisation over 800m along strike in the
Slide 13: Talang Santo – The Splay Vein
For personal use only Talang Santo – The Splay Vein Overall strike >200m across 2 Zones (Zone A & Zone B) Development supports a second orebody and highlights potential for additional lodes within the current development footprint of the Talang Santo mine Establishing trial stopes on the 3 Lev
Slide 14: The Splay Vein – A Second Orebody
For personal use only The Splay Vein – A Second Orebody Zone A consists of 113m of development with an average width of 2m; weighted average grade is (uncut) 26.7g/t Au and 99.6g/t Ag remains open along strike and down dip4 High grade assays (uncut) include: 2.6m @ 110.0 g/t Au & 188 g/t Ag
Slide 15: Talang Samin – Advanced Exploration
For personal use only Talang Samin – Advanced Exploration Talang Samin (800m from Talang Santo) is the most prospective target Exploration shaft at Talang Samin (800m from Talang Santo) has been sunk to 75m aiming to expose a large previously interpreted vein which has returned encouraging inter
Slide 16: Talang Cluster – Exploration Upside
Talang Cluster – Exploration Upside The “Talang Cluster” – multiple structures out-cropping at surface within a 2km radius of For personal use only the Talang Santo Mine which is characteristic of larger epithermal systems 15
Slide 17: Further Exploration Opportunities
Further Exploration Opportunities Numerous defined epithermal targets For personal use only within the existing 100km2 Project area Planning underway to complete infill of Project scale dataset with surface mapping of alteration, structure and geochemistry and integrate with geophysics Back an
Slide 18: Growth Strategy – Tiered Approach
For personal use only Growth Strategy – 3 Tiered Approach Immediate focus on near-mine resource development Near mine opportunities opportunities within range of existing Talang Santo infrastructure Appraise Evaluate advanced exploration play at Talang Samin Advanced Projects Recovery of remnant res
Slide 19: Investment Highlights
For personal use only Investment Highlights 1 Low cost, high grade, high margin gold production from Talang Santo 2 Established mine infrastructure = minimal capex 3 Board and Management with significant in-country and operational experience Substantial project pipeline including Talang Samin explor
Slide 20: Community, Safety & the Environment
Community, Safety & the Environment Recipient of “Golden Flag’ certificate in recognition for the creation of a safe and responsible work environment For personal use only Occupational Health & Safety Site is currently 12 months Lost Time Injury (LTI) Free Environmental Awareness Small footprint
Slide 21: Scott Huffadine – Managing Director
For personal use only Scott Huffadine – Managing Director +61 8 9486 1149 info@kingsrosemining.com.au www.kingsrosemining.com.au ASX:KRM ACN 112 389 910 20
Slide 22: Appendix – Way Linggo Project Mineral Resource Statement
Appendix 1 – Way Linggo Project Mineral Resource Statement As at 30 June 2013 Classification Tonnes Gold (Au) g/t Silver (Ag) g/t Au ounces Ag ounces For personal use only Talang Santo Measured Indicated 863,625 6.2 16 171,873 451,200 Inferred 797,355 4.5 17 115,616 443,751 Subtotal 1,660,980 5.4 17