Hastings Technology Metals Limited · ASX:HAS

Hastings Technology Metals — Mines and Money London (December 2023)

22 slides from Hastings Technology Metals's conference presentation, Dec 21, 2023

  1. Slide 1: London Mines & Money Corporate Presentation (Update)

    21 December 2023 LONDON MINES & MONEY CORPORATE PRESENTATION (UPDATE) Hastings Technology Metals Ltd (ASX:HAS) (“Hastings” or “the Company”) advises the Corporate Presentation titled ‘Developing the Yangibana Rare Earths Project’, which was originally lodged on 4 December 2023 has been updated in re

  2. Slide 2: Developing the Yangibana Rare Earths Project

    Developing the Yangibana Rare Earths Project Paul Brown, CEO Hastings Technology Metals Ltd | ASX:HAS Mines and Money London

  3. Slide 3: Disclaimer

    Disclaimer DISCLAIMER This presentation has been prepared by Hastings Technology Metals Limited (“Company” or “Hastings”). This presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale of any securities in the Company. This

  4. Slide 4: Strong Demand Driving Supply Deficit

    STRONG DEMAND DRIVING SUPPLY DEFICIT Supply gap forecast to increase during the decade, requiring around 13x Yangibana Projects Global REO Magnet Demand – Anticipated Growth1 NdPr Oxide – Forecast Supply and Demand Balance Electric Vehicles / mobility Wind Power Supply Demand Supply deficit Industri

  5. Slide 5: Hastings' Strategy

    HASTINGS’ STRATEGY Capturing increased value by pursuing downstream processing opportunities Rare earth concentrate Mixed rare earth Rare earth oxide Metals and alloys Permanent magnets carbonate Processing Separation Refining Manufacturing Yangibana Mine and Pursue downstream Mine to magnet Benefic

  6. Slide 6: World-Class Asset

    WORLD-CLASS ASSET Unique deposit located in a tier one jurisdiction with unrivalled high percentage of NdPr:TREO in orebody Average NdPr:TREO Ratio1 Yangibana Project – Mineral Resources and Ore Reserves2 35 Sichuan (China) 14% Mineral Resources Ore Reserves Mountain Pass (US) 16% 30 Kangankunde (Ma

  7. Slide 7: Staged Development Feasibility Study

    STAGED DEVELOPMENT FEASIBILITY STUDY1 Staged delivery model supporting de-risked pathway to becoming Australia’s next rare earths producer Broome Port Hedland Yangibana Project Downstream processing Dampier Mining and Beneficiation Hydrometallurgical Plant Onslow 20.9mt Ore Reserve for Cracking, lea

  8. Slide 8: Strong Base to Ramp Up Construction

    STRONG BASE TO RAMP UP CONSTRUCTION $126 million invested in non-processing infrastructure for Stage 1 of Yangibana Project Development ready Fully permitted to begin construction and for first concentrate production in 2025 A$52 Non-Processing Infrastructure $126 million investment in finalising ea

  9. Slide 9: Kurrbili Accommodation Village

    KURRBILI ACCOMMODATION VILLAGE 8

  10. Slide 10: Siphon Well Borefield

    SIPHON WELL BOREFIELD 9

  11. Slide 11: Yangibana Airstrip

    _YANGIBANA = AIRSTRIP hastings | a

  12. Slide 12: SAG Mill

    SAG MILL 11

  13. Slide 13: Beneficiation Plant Construction

    BENEFICIATION PLANT CONSTRUCTION1 Engineering, Procurement and Construction (“EPC”) contract in place with leading engineering and contracting company $210 million Including fixed-price component of $180 million GR Engineering Services Strong track record of delivering integrated project solutions K

  14. Slide 14: Project Execution Strategy

    PROJECT EXECUTION STRATEGY Hastings is well-positioned to move into development of the Yangibana Project Design and Operational Execution Cost Management Schedule Readiness • All key approvals in place for • $210 million EPC contract with • Early works agreement in • Key leadership roles filled, fir

  15. Slide 15: Robust Project Metrics

    ROBUST PROJECT METRICS1 Comprehensive project delivery and capital review in H1 2023 reaffirming attractive project economics $530 - $1,010 million 27.5% - 50.9% Post-tax NPV11 (ungeared)2 Post-tax IRR (ungeared)2 $175 - $250 million 2.1 – 4.4 years Average EBITDA per annum2 Payback period2 First qu

  16. Slide 16: Project Funding

    PROJECT FUNDING Multiple non-binding financing proposals received in order of target gearing ratio of 60% Staged development Completion of Multiple financing Shortlist feasibility study financing due proposals preferred diligence reports received (Loans, provider(s)/ JV, Bonds) funding solution Janu

  17. Slide 17: Leading ESG Credentials

    LEADING ESG Green Finance Accreditation CREDENTIALS Certified by DNV for green bonds and/or green loans Aligned with International Capital Market Association’s Green Bond Principles and Loan Market Association’s Green Loan Principles Ranked fourth Out of 159 companies in 2022 diversified metals mini

  18. Slide 18: Our Vision and Values

    Our Vision and Values To be a leading Australian producer of rare earth minerals needed to meet the global transition to renewable energy and advanced technologies. >Passion >Teamwork We are loyal to the project and work We are honest and work as one team to passionately to deliver our vision. achie

  19. Slide 19: Hastings Technology Metals Limited

    Hastings Technology Metals Limited ABN 43 122 911 399 Level 6, 197 St Georges Terrace Perth Western Australia 6000 Follow us on T: +61 8 6117 6118 E: info@hastingstechmetals.com hastingstechmetals.com

  20. Slide 20: Appendix

    APPENDIX 19

  21. Slide 21: Peer Comparison

    PEER COMPARISON Average NdPr:TREO ratio over life of mine Mine Ownership Ticker NdPr:TREO ratio Source Hastings Technology Metals Yangibana HAS:ASX 37% 6 February 2023: ASX Announcement: “Yangibana Ore Reserves Increase by 25%” Ltd 5 July 2022: SEDAR Announcement: “Mkango Announces Results of Defini

  22. Slide 22: Resources and Reserves

    RESOURCES AND RESERVES Yangibana Project – total JORC Mineral Resources (30 Oct 22)1 Yangibana Project – total JORC Ore Reserves (6 Feb 23)1 Nd2O3+ %Nd2O3+ TREO %Nd2O3+ Category mt %TREO Deposit mt %TREO Pr6O11 as Pr6O11 tonnes Pr6O11 % of TREO Measured 4.97 0.96 0.37 47,721 Bald Hill 8.12 0.79 0.32

Hastings Technology Metals — Mines and Money London (December 2023) on 6ix