Endeavour International — Canaccord Adams (August 2006)
32 slides from Endeavour International's conference presentation, Aug 9, 2006
Slide 1: Canaccord Adams August 9, 2006
Canaccord Adams August 9, 2006
Slide 2: Cautionary Statement
Cautionary Statement This is an oral presentation which is accompanied by slides. Investors are urged to review our SEC filings. This presentation contains certain forward-looking statements regarding various oil and gas discoveries, oil and gas exploration, development and production activities, an
Slide 3: Goal
Goal To become the leading North Sea Independent Exploration and Production Company
Slide 4: Strategy
Strategy Experienced Management + Talented, Experienced Explorationists + Extensive Regional 3D Seismic Database + Equity Incentives Shareholder Value
Slide 5: Why the North Sea?
Why the North Sea? Large Resource Potential UK: DTI estimates 16 bboe yet-to-be discovered Norway: NPD estimates 24 bboe yet-to-be discovered >250 new fields with more than 25 mmboe each to be discovered High value fields with existing and available infrastructure Effective recycling of acreage Supp
Slide 6: North Sea - A Major Hydrocarbon Province
North Sea - A Major Hydrocarbon Province... Source: EIA, RBS, NPD, BP Statistics, Wood Mackenzie With Substantial Exploration Potential 2005 Results U.K. - 57 E&A Wells found 732 mmboe 1 Norway - 12 Expl. Wells found 1.0 bboe 2 Netherlands - 5 significant gas discoveries 3 (1) Hannon Westwood (2) NP
Slide 7: Technical Team
Technical Team Geologists Geophysicists Engineers John N. Seitz Ronald A. Bain, Ph.D. Bruce H. Stover J.W. Munns David J. Griffiths Clint Smith Tord Pedersen Michael Neese Chris Hopper, Ph.D. Idar Kjorlaug David Rhodes J. Felix Acree Robert Fitzpatrick Fiona Goodfellow, Ph.D. Jan Olimstad Debbie War
Slide 8: Endeavour North Sea Data
Endeavour North Sea Data Location: Offshore UK, Norway, and The Netherlands Data Sets: • MegaSurvey (104,200 km2) • Digital Atlas • Regional structural mapping on 11 horizons • Pressure data (573 wells) • Well database (more than 1,500 wells) • Biostratigraphic database (600 wells) • 2D long offset
Slide 9: Endeavour North Sea MegaSurvey Database
Endeavour North Sea MegaSurvey Database Overlaid on Gulf of Mexico PGS MegaSurveys .. Central North Sea - 4,800 km2 Southern North Sea - 22,000 km2 Norwegian Norh Sea - 12,400 km2 Dutch North Sea - 15,250 km2 Total - 104,450 km2 Relative to Gulf of Mexico Represents 104,450 km2 of MegaSurvey
Slide 10: Talisman Transaction Overview
Talisman Transaction Overview Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing as
Slide 11: Transaction Impact
Transaction Impact Immediate critical mass in North Sea Diversification across 10 producing fields (10,000+ boepd) Balanced exposure to oil and gas Cash flow to support an exploration drilling program of 4-8 wells per year Portfolio balanced between exploration and production Exploration fuels organ
Slide 12: Sources and Uses of Funds
Sources and Uses of Funds Sources Permanent Capital Structure Target Sources Permanent Capital Structure Target Uses Net Cash Flow From Jan. 1, 2006 ^ $40 Acquisition Price $414 Cash on Hand $14 Hedging Costs $10 Convertible Preferred Stock $125-250 Net Working Capital ^ $10 Senior Bank Facility $15
Slide 13: Reinvestment of Pre Tax Cash Flow from Acquisition of Talisman Assets
Reinvestment of Pre Tax Cash Flow from Acquisition of Talisman Assets 1 Income before income tax, after Petroleum Royalty Tax (PRT) and capital expenditures associated with the acquired assets, and after interest expense and dividends associated with acquiring the assets, assuming the capital struct
Slide 14: North Sea Exploration Drilling Program
North Sea Exploration Drilling Program 2006 Schedule 44/12 (Cygnus) - gas discovery! 23/16f (Columbus) Endeavour Oper. (GSF 140) Pending Farmins - outside operators 2007 Drilling Prospects Endeavour operated 48/17 (Emu) (GSF 140) - Southern Gas Basin 30/23 (Balgownie) - Central North Sea - UK 23/16f
Slide 15: 44/12 Cygnus
44/12-1 44/12-2 Leman Sst Carboniferous GWC -11313' NNW SSE Basin: Southern North Sea Partners: Endeavour 12.5% GdF (op) 25% Tullow 35% EOn 27.5% Reserves: FBI 170 bcf FBIIa 120 bcf FBIIb 100 bcf Well cost: £18.6 million (44/12-2) Est spud: 2007 Analogue field: Markham (230 bcf) Cygnus I IIa III IV
Slide 16: 23/16f Columbus
23/16f Columbus (stratigraphic pinchout with DHI downdip from Magellan Prospect) Basin: Central Graben Partners: Endeavour 50% Serica (op) 50% Reserves: 85 bcf + condensate Est. well cost: $18 million (DHC) Est. spud: 2006 Analogue field: Everest (1.2 Tcf) Everest Monan Fiddich Montrose Arbroath How
Slide 17: 30/23b Balgownie
30/23b Balgownie (inverted rim syncline) Basin: Central Graben Partners: Endeavour (op) 65% Reservoir: Fulmar sand Reserves: 40 mmboe Est. well cost: £12.3 million (DHC) Est. spud: 2007 Analogue field: Janice (70mmbl) NE SW BCU ROT Fulmar
Slide 18: 48/1a Emu
48/1a Emu (large horst block with shows in adjacent wells) Top Leman Depth m 48/1-2a Amerada 1993 Suspended with gas shows in Carboniferous. Leman Sst 10562-10867ft TVDSS. Westphalian A Low gas saturations calculated in Carboniferous sandstones. Ravenspurn Neptune Babbage Hyde West Sole Hoton Newsha
Slide 19: 48/1a Platypus
48/1a Platypus (low relief fault-bounded closure) Top Leman Depth m Ravenspurn Neptune Babbage Hyde West Sole Hoton Newsham Mercury Apollo Minerva Johnston Cleeton Platypus D E P T H Bunter Sand Top Zechstein Top Rotliegend Platypus SW NE PSDM Line 210 2 km Basin: Southern North Sea Partners: Endeav
Slide 20: 31/21b Newburgh
31/21b Newburgh (downthrown fault closures at Rotliegend and Fulmar) Newburgh Base Cretaceous Depth Map (m) Basin: Central Graben Partners: Endeavour (op) 40% Hunt 30% Acorn 30% Reserves: 20 mmboe Est. well cost: £13.3 million (DHC) Est. spud: 2007 Analogue field: Ardmore (82 mmbl)
Slide 21: Inner Moray Firth
Inner Moray Firth (tilted fault blocks) Basin: Inner Moray Firth Partners: Endeavour (op) 33.3% Hunt 33.3% Palace 33.3% Reservoir: Mid Jurassic Beatrice sandstones Upper Jurassic Volgian sandstones Reserves: 400 - 800 bcf Est. well cost: £9.1 million (DHC) Est. spud: 2007 Analogue (structural) field
Slide 22: Norway 2007 potential drilling locations
Norway 2007 potential drilling locations Agat PL363 (Gorilla) 5 km PL304 250 m WD Lower Cretaceous target at ~3500 m TD at ~4200 m 60 days / $ 35 mm 150 m WD Lower Tertiary target at ~1950 m TD at ~2500 m 40 days / $ 23 mm 120 m WD Lower Tertiary target at ~1940 m TD at ~2500 m 40 days / $ 23 mm
Slide 23: PL304 Aegis Prospect
Frigg Balder PL304 S N 25/10-2 25/10-7 9232 m W E Balder sst. Heimdal sst. 25/10-7 Aegis License period: Dec.12 2003 - Dec.12 2008 Aegis Prospect is a 57 mmbo Tertiary oil prospect. Upside reserve potential 113 mmbo at Aegis, with additional Tertiary prospects & leads on License. Nearby Balder Field
Slide 24: License PL304 (Part block 25/5)
License: PL 363 (Part block 25/5) Country: Norway Endeavour equity: 40 % Partner: Lundin (Op., 60 %) Date granted: 6 Jan 2006 (APA 2005) Date valid to: 6 Jan 2011 Original area: 167.941 km2 Current area: 167.941 km2 Initial period 2+2+1 year initial period 15 year extension period Work program: Obta
Slide 25: License AGAT/PL270 (35/3)
License: AGAT/PL270 (35/3) Country: Norway Endeavour 49% Partners: RWE-DEA (Op) Date granted: 27 April 2001 (NST 2000) Date valid to: 27 April 2035 Original area: 488.659 km2 Current area: 241.222 km2 Initial period 5 year 30 year extension period Work program: Drill an exploration well to at least
Slide 26: Growth in Key Metrics
Growth in Key Metrics 2004 2005 2006 0 4 12 2004 2005 2006 0 18 35 2004 2005 2006 0 2 10 2004 2005 2006 8 20 60
Slide 27: Production Profile (P1+P2)
Production Profile (P1+P2) 2004 2005 2006 2007 2008 2009 Njord & Brage 2038 1995 1861 1715 1767 2099 2341 1370 2456 2275 2098 2116 2038 1995 1900 1861 1704 1485 1537 1537 1537 1537 1537 1537 1537 1537 1534 1534 1534 1534 1534 1534 1604 1674 1744 1814 1884 1954 2024 2095 2165 2235 2305 2375 2406 2437
Slide 28: Why Endeavour?
Why Endeavour? Growth in production and cash flow Sustainable exploration program supported by high quality producing assets Balanced portfolio Distinctive investment opportunity Only pure-play North Sea independent Experienced and accomplished team Solid base of production with significant explorat
Slide 29: Appendix
Appendix <> nto
Slide 30: Galtvort license
PL 347 PL 348 Galtvort Date granted: 17 Dec 2004 (APA 2004) Date valid to: 17 Dec 2009 Original area: 207.727 km2 Current area: 207.727 km2 Initial period 2+2+1 year initial period 15 year extension period Work program: Reprocessing of 200 sq. km 3D and by 17 Dec 2006 Drill-or-drop-decision by 17 De
Slide 31: Njord Draugen field
NJORD DRAUGEN Field: NJORD AREA License/Block: PL107, PL132 Country: Norway Endeavour: 2.5% Partners: Seismic line Map (Geo-)seismic line Log BCu T.Tilje Njord field is heavly faulted & segmented The field has been developed using a semi-submersible drilling, livingquarter and production platform (N
Slide 32: Brage field
The main drive mechanism in the Statfjord and Fensfjord formations is water injection. The Sognefjord formation is currently produced by two single producer and natural depletion. During drilling of a new Fensfjord producer Spring 2004 Brent formation was encountered on the north western part of the
Endeavour International — Canaccord Adams (August 2006) on 6ix