Jupiter Energy Limited · ASX:JPR
Jupiter Energy — Investor Presentation (October 2024)
11 slides from Jupiter Energy's investor presentation, October 2024
Slide 1: Corporate Overview
Corporate Overview October 2024
Slide 2: Disclaimer
DISCLAIMER This presentation contains forward-looking statements that are subject to risk factors associated with the oil and gas industry. It is believed that the expectations reflected in these statements are reasonable, but they may be affected by a variety of variables which could cause actual r
Slide 3: Table of Contents
TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Progress in 2024 and Outlook for 2025
Slide 4: Overview of Jupiter
OVERVIEW OF JUPITER Listed on Australian Stock Exchange (ASX) with 2 major shareholders holding ~81% of the issued capital. o 2024/2025 Work Program Approved – next drilling location will be on the Akkar East field. Operating in Kazakhstan since 2008 – fully compliant in its operations. 3 oilfields
Slide 5: Table of Contents
TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Progress in 2024 and Outlook for 2025
Slide 6: Location of the Licence Area
LOCATION OF THE LICENCE AREA North Akkar Total reserves for the Mangistau basin are estimated to be in excess of 5 billion barrels including two large oil fields, Uzen and Zhetybai
Slide 7: Reserves Summary
RESERVES SUMMARY Current production levels: Akkar North (East Block), Akkar East and West Zhetybai producing a cumulative ~80T/day (~600 bbls) Ongoing review of existing wells to continue to optimize production levels. Regular review of workover plans – timing of work is funding dependent CPR: Indep
Slide 8: Current Field Development
CURRENT FIELD DEVELOPMENT License area of “MMG” JSC Prospect of the reserves’ increase in North Akkar the area of well #54 by 2.8mln. tons oilfield Akkar North (Eastern block) С1+С2 geol./recov. reserves Akkar North 2976/642thous.tons Joint Full Field Development Project with MMG JSC in place includ
Slide 9: Table of Contents
TABLE OF CONTENTS Overview of the company Reserves, licence area and operational status Progress in 2024 and Outlook for 2025
Slide 10: 2024 Progress and 2025 Outlook
2024 PROGRESS and 2025 OUTLOOK RESERVES AND FINANCIAL PRODUCTION/DRILLING INFRASTRUCTURE NEXT STEPS MODEL OUTLOOK 4 existing Production wells Stage 1 Gas Utilisation CPR released in January Address funding with remediation plans for infrastructure has been in 2024 confirming updated requirements for
Slide 11: Contact Details
CONTACT DETAILS Geoff Gander Chairman & CEO Jupiter Energy Limited +7 701 221 8907 (KZ) +61 417 914 137 (AU) geoff@jupiterenergy.com www.jupiterenergy.com