  1. Slide 1: 2025 Electric Integrated Resource Plan

    2025 Electric Integrated Resource Plan Technical Advisory Committee Meeting No. 9 Agenda Tuesday, June 18, 2024 Virtual Meeting – 8:30 am to 10:00 am PTZ Topic Staff Introductions John Lyons Loads & Resources Discussion Lori Hermanson IRP Generation Option Transmission Planning Studies Dean Spratt D

  2. Slide 2: 2025 IRP TAC 9 Introductions

    2025 IRP TAC 9 Introductions John Lyons, Ph.D. Technical Advisory Committee Meeting No. 9 June 18, 2024

  3. Slide 3: Today's Agenda

    Today’s Agenda Introductions, John Lyons Loads & Resources Discussion, Lori Hermanson IRP Generation Option Transmission Planning Studies, Dean Spratt Distribution Planning and Microgrids, Damon Fisher 2

  4. Slide 4: Remaining 2025 Electric IRP TAC Schedule

    Remaining 2025 Electric IRP TAC Schedule • Technical Modeling Workshop: June 25, 2024: 9:00 am to 12:00pm (PTZ) o PRiSM Model Tour o ARAM Model Tour o New Resource Cost Model • TAC 10: July 16, 2024: 8:30 to 10:00 (PTZ) o Preferred Resource Strategy Results o Washington Customer Benefit Indicator Im

  5. Slide 5: Remaining 2025 Electric IRP TAC Schedule

    Remaining 2025 Electric IRP TAC Schedule • September 2, 2024- Draft IRP Released to TAC. • Virtual Public Meeting- Natural Gas & Electric IRP (September 2024) o Recorded presentation o Daytime comment and question session (12pm to 1pm- PST) o Evening comment and question session (6pm to 7pm- PST)

  6. Slide 6: 2025 IRP Loads & Resources Discussion

    2025 IRP Loads & Resources Discussion Lori Hermanson, Senior Power Supply Analyst Technical Advisory Committee Meeting No. 9 June 18, 2024

  7. Slide 7: Portfolio Realignment

    Portfolio Realignment Palouse - 105 MW Rattlesnake - 144 MW ELF | Solar - 19 MW Colstrip - (222) Mw jed REC Sales - 42 MW water Paper Sale-47 MW. 2024 2025 2026 «2027: «-2028:« 2029 «2030 2031 «2032» 2033 :«« 2034 «2035 «2036 »«« 2037 «2038 «2039 «2040-2041 «2042-2043 20442045

  8. Slide 8: Monthly Net Energy Position

    Monthly Net Energy Position Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual 2026 (25) 26 175 348 696 508 177 78 200 171 63 22 204 2027 (1) 54 209 381 750 553 226 133 254 215 94 57 244 2028 (7) 96 209 374 743 551 219 126 255 219 98 51 245 2029 9 87 234 401 760 563 221 122 258 227 106 67 255 20

  9. Slide 9: Proposed CETA's Clean Energy Goals

    Proposed CETA’s Clean Energy Goals 5% 10% 15% 20% 4

  10. Slide 10: Washington Clean Energy Position

    Washington Clean Energy Position 1,200 Idaho Legacy Hydro Available for Alternative Compliance 1,000 Washington CETA Primary Load Estimate Compliance Washington Average Megawatts 800 Retail Load CETA Shortfall Idaho Allocated 600 Clean Energy Transferable to Allocated Wind Washington 400 Allocated B

  11. Slide 11: Capacity L&R Discussion Issues

    Capacity L&R Discussion Issues • Avista is not settled on capacity planning assumptions • LOLP studies indicate a need for increased planning margin or higher market reliance. – Current market reliance limit is 330 MW in “constrained” hours – Avista’s main challenge is energy limited capacity resour

  12. Slide 12: Integrated Resource Plan (IRP) Transmission Planning Studies

    Integrated Resource Plan (IRP) Transmission Planning Studies Dean Spratt, Transmission Planning Technical Advisory Committee Meeting No. 9 June 18, 2024

  13. Slide 13: FERC Standards of Conduct

    FERC Standards of Conduct Summary of requirements • Non-public transmission information can not be shared with Avista Merchant Function employees. • There are Avista Merchant Function employees attending today. • We will not be sharing any non-public transmission information. Avista’s OASIS is where

  14. Slide 14: Agenda

    Agenda • Introduction to Avista System Planning – Useful information about Transmission Planning – Overview of recent Avista projects • Generation Interconnection Study Process – Integrated Resource Plan (IRP) Requests – Large Generation Interconnection Queue – Third year into the Cluster Study Proc

  15. Slide 15: Introduction to Avista System Planning

    Introduction to Avista System Planning Avista’s System Planning Group includes: • Distribution Planning • Transmission Planning – Focus on reliable electric service • Federal, regional, state, and local compliance • Regional system coordination – Provide transmission service and system analysis • Pl

  16. Slide 16: Information About Transmission Planning

    Information About Transmission Planning • Our focus is the Bulk Electric System (BES) – Avista’s 115 kV and 230 kV facilities (>100 kV) • We identify issues where Avista’s BES won’t reliably deliver power to our customers • Then we develop plans to fix it – “Corrective Action Plans” – Mandated and d

  17. Slide 17: NERC Standard TPL-001-5

    NERC Standard TPL-001-5 • Describes outage conditions we must study – P0: everything online and available – P1: single facility outages, like a transformer – P2, P4, P5 & P7: multiple facility outages – P3 & P6: overlapping combination of two facilities 6

  18. Slide 18: TPL-001-5, cont.

    TPL-001-5, cont. • A couple of NERC directives for the above faults – “The System shall remain stable” • Cascading and uncontrolled islanding shall not occur – “Applicable Facility Ratings shall not be exceeded” • Equipment ratings, voltage, fault duty, etc. – “An objective of the planning process i

  19. Slide 19: Two Approaches to Reliability Issues

    Two Approaches to Reliability Issues • Transmission Operations (TO) are guided by significantly different standards than Transmission Planning (TP) • TO standards provide flexibility that TP standards do not allow – Operators can push system limits to SAVE the interconnected system • Shed load, over

  20. Slide 20: Standards are a Roadmap

    Standards are a Roadmap • Western Systems Coordinating Council (WSCC) – Ensure that disturbances in one system do not spread to other systems. • Operating agreement with 40 electric power systems established in 1967 • Western Electricity Coordinating Council (WECC) – Responsible for coordinating and

  21. Slide 21: Recent Transmission Projects

    Recent Transmission Projects 10

  22. Slide 22: Non-Wire Alternatives are Considered

    Non-Wire Alternatives are Considered • We are documenting this with more clarity • Non-wire options require robust wires to perform – Avista is working on the transmission fundamentals 11

  23. Slide 23: Evaluated Batteries for T-1-1

    Evaluated Batteries for T-1-1 • TPL-001-5 ~ T-1-1 for long lead equipment – Double transformer outages • Shawnee 230/115 kV outage followed by a concurrent outage of Moscow 230/115 kV transformer. – Could we mitigate performance issues with storage? • Yes…but… We would need a 125 MW battery – Typica

  24. Slide 24: Generation Interconnection Study Process

    Generation Interconnection Study Process Process for Generation Requests • Two sources: • External developers • Enter via the OATT • Internal IRP requests • Feasibility Study…then OATT • AVA Merchant MUST follow the OATT just like external parties • Typical process: • Hold a scoping meeting to discu

  25. Slide 25: Transition to Cluster Study Process

    Transition to Cluster Study Process Challenges with Serial Interconnections • Large serial queues become difficult to process efficiently • Interdependency of projects becomes complicated • Studying single projects is inefficient compared to studying projects in a group • Projects that do not reach

  26. Slide 26: Serial Process was Complex and Slow

    Serial Process was Complex and Slow Interconnection Requests necessitated a better Process 15

  27. Slide 27: Two-Phase Cluster Study Process

    Two-Phase Cluster Study Process Benefits and Objectives • Create a more efficient process • Design a process with definitive timelines that can be consistently met • Allocate System Upgrades proportionally • Ensure commercially viable projects have a clear path for development • Alleviate the backlo

  28. Slide 28: Current Interconnection Queue

    Current Interconnection Queue 17

  29. Slide 29: Generation Integration Cost Estimates

    Generation Integration Cost Estimates Generation Integration at New sites 18 Preliminary estimates are given as -25% to +75%

  30. Slide 30: Cost Estimates, continued

    Cost Estimates, continued Increase in Capacity or Additional Generating Facilities at existing generation sites 19 Preliminary estimates are given as -25% to +75%

  31. Slide 31: Reardan: 100 MW

    Reardan: 100 MW Choice of interconnection point may result in extensive system reinforcements 20

  32. Slide 32: Espanola: 100 MW

    Espanola: 100 MW Optimizing the interconnection point is a key benefit of the Cluster Study process 21

  33. Slide 33: Questions?

    Questions? Refer to Avista’s Open Access Same-time Information System (OASIS) link for information regarding System Planning and the Interconnection Process at: http://www.oasis.oati.com/avat/index.html 22

  34. Slide 34: North Plains Connector

    North Plains Connector • 2025 IRP will model this transmission expansion as a capacity market resource up to 300 MW. • QCC will be limited to the difference between line rating and Montana Wind QCC. • Project can be selected beginning in 2033 or any year thereafter.

  35. Slide 35: Distribution Planning and Microgrids

    Distribution Planning and Microgrids Damon Fisher, System Planning Technical Advisory Committee Meeting No. 9 June 18, 2024

  36. Slide 36: Goals of Electric Distribution Planning

    Goals of Electric Distribution Planning • Ensure electric distribution infrastructure to serve customers now and in the future with a focus on: – Safety – Reliability – Capacity – Efficiency – Level of service – Operational flexibility – Corporate/Regulatory goals – Affordability 2

  37. Slide 37: What is a Microgrid?

    What is a Microgrid? • What is a microgrid? • Same as a “macro” grid but smaller (self similar) • Maintain Voltage and Frequency within limits • Respect Thermal Limits • Load = Generation • Protected equipment 3

  38. Slide 38: What is a Microgrid?

    What is a Microgrid? North American Regional Reliability Councils and Interconnections ll NPCC @ FRCC MM TRE | RFC MM MRO §@ WECC ™@ SERC MM SPP © ASCC

  39. Slide 39: What is a Microgrid?

    What is a Microgrid? • Major equipment- • Microgrid Controller and Communications • Generation (PV, Wind, Thermal, Fuel Cells… etc.) • Storage and/or dispatchable source • Grid disconnect switch • Major functionality- • Black start capable • Island mode • Grid Synchronization • Managed Demand 5

  40. Slide 40: Why a Microgrid?

    Why a Microgrid? Typically, one of four reasons or combination of them- 1. Resilience • Critical Load • Essential Service 2. Economic • Demand charges • Energy arbitrage • Other utility services 3. Climate goals 4. Difficulty serving load or getting service • Remote/isolated 6

  41. Slide 41: Microgrid as a resource

    Microgrid as a resource • A microgrid is a black box that the utility can ask for help. That help will usually be in the form of reduced demand or increased generation. • Depending on the goals of the microgrid and the current state of the system the microgrid controller may say- • I can’t help • Su

  42. Slide 42: Avista and Microgrids

    Avista and Microgrids • Avista has a couple of microgrid projects. – WSU Spokane campus (demonstration/pilot) • Solar + Battery – MLK Center (Out for bid) • Solar (115-kW dc array) + Battery (500KW/1MWh) + Natural Gas Generator (150kW) • Approximate cost $2.5 million (grants and matching funds) 8

  43. Slide 43: Avista and Microgrids

    Avista and Microgrids MLK Resiliency Center Operated by the MLK Community Center @ SOLAR PANELS: Produce clean, renewable electricity to run the Center and charge the batteries when grid power Is out. @ BATTERY STORAGE: Powers essential operations during unexpected outages, enabling the Center to fu

  44. Slide 44: Avista and Microgrids

    icrogrids Avista and M fo) =

  45. Slide 45: How could it be a resource? Feeder 3HT12F5

    How could it be a resource? Feeder 3HT12F5 • Mitigate a grid constraint • Transformer • Feeder • Mitigate a resource constraint 11

  46. Slide 46: Advantages of Microgrids

    Advantages of Microgrids 1. Ride through grid outages for those served by the microgrid. 2. Control system optimizes resources on the microgrid for the desired goals. 3. Billing flexibility and autonomy. 4. Grid resource options. 12

  47. Slide 47: Disadvantages of Microgrids

    Disadvantages of Microgrids 1. Initial costs can be high. Equipment is expensive and the systems are custom-made designs which are complex. 2. Extra costs for the ongoing maintenance and the local expertise to maintain it. 3. Regulatory, policy, and contractual complications. 13

  48. Slide 48: Distribution Planning Advisory Group

    Distribution Planning Advisory Group • Avista’s overarching Distribution Planning goals are: • Develop a transparent, robust, holistic planning process for electric system operations and investment • Create a long-term plan to ensure we are maximizing operational efficiency and customer value • Dist

  49. Slide 49: Questions?

    Questions? 15