Turquoise Hill Resources — Scotiabank Mining Conference 2016
19 slides from Turquoise Hill Resources's conference presentation, Nov 30, 2016
Slide 1: Oyu Tolgoi: Long-term value
Scotiabank Mining Conference DECEMBER 6-7, 2016 Oyu Tolgoi: Long-term value World’s best developing copper project
Slide 2: Turquoise Hill's investment thesis
Turquoise Hill’s investment thesis Oyu Tolgoi will be the world’s third-largest copper mine with underground Hugo North Lift 1 financing in place1 Timing of underground benefits from expected drop in copper supply (~2020) Oyu Tolgoi’s resources provide long-term development optionality 1. Fi
Slide 3: Analysis of potential full production upside
Analysis of potential full production upside1 Indicative valuation (US$B) EV/Reserves EV/M+I Resources5 Price/NAV TRQ EV/Reserves ($/lb.) TRQ EV/M+I Resources ($/lb.) TRQ P/NAV $0.156 $0.061 0.825x Trading comps2 Average EV/Reserves ($/lb.) Average EV/M+I Resources ($/lb.) Average P/NAV $0.321 $0.12
Slide 4: Long-term copper fundamentals strong
Long-term copper fundamentals strong Copper supply/demand outlook Copper market likely to be in Base Highly Probable Primary Demand Annual avg cu price balance in 2017 30 Forecast $4 Ongoing attrition at existing mines driven by declining Annual average LME copper price (US$/lb) 25 grade $3 Copp
Slide 5: Oyu Tolgoi underground a Tier 1 asset
Oyu Tolgoi underground a Tier 1 asset 2025 copper mine C1+royalties+sustaining normal cost curve C/lb, 2016$ 400 Q1 Q2 Q3 Q4 300 Oyu Tolgoi Other Mines 200 100 0 kt 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Cumulative production (‘000 tonnes) -100 Source: Wood Mackenzie (Q3’16 Cos
Slide 6: 2016 Reserves Case mining areas
2016 Reserves Case mining areas Underground Open Pit Plant Ramp-up (2020-2027), full production (~33mtpa) Open-pit mine tops-up concentrator Highest grade ore mined first – copper ~2.5% After 2039, open-pit head grades average ~ 0.45% copper Opportunities to reduce construction time, faste
Slide 7: Complete ramp-up expected by 2027
Complete ramp-up expected by 2027 Sustainable underground production Complete convey to surface Project 1st draw Complete concentrator Complete re-start bell firing upgrade ramp-up 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 Pre-start Excavation (lateral / mass / vertical) Excav
Slide 8: Key underground components
Key underground components Shaft 1 Shaft 2 Shaft 5 Shaft 3 Shaft 4 (early development (production and (ventilation) (ventilation) (ventilation) and ventilation) ventilation) Total Depth 1,385 metres 1,284 metres 1,178 metres 1,148 metres 1,149 metres Diameter 6.7 metres 10 metres 6.7 metres 10 metre
Slide 9: Approved underground CAPEX
Approved underground CAPEX $1.3 $1.2 $1.2 $1.0 $0.8 $0.5 $0.5 $0.3 $0.4 $0.4 $0.4 $0.3 Underground expansion capital, VAT and escalation of $5.3 billion Underground sustaining capital, VAT and escalation of $2.8 billion to full ramp-up expected in 2027 9
Slide 10: 2016 Resources Case
2016 Resources Case Oyut Open Pit ~950Mt (reserve) 0.45% copper; 0.31 g/t gold Hugo North Lift 1 ~500Mt (reserve) 1.66% copper; 0.35 g/t gold Hugo South ~300Mt (resource) Heruga 1.07% copper ~700Mt (resource) 0.06 g/t gold 0.42% copper 0.43 g/t gold; >100Mlb moly Plant Hugo North Lift 2 ~700Mt (reso
Slide 11: Alternative Production Cases
Alternative Production Cases Resources 120 Case • Assumes ~Year 20, concentrator expanded to 120mtpa • NPV8% $8.80 billion1 • Expansion capital costs of $14.86 billion3 Resources 100 Case • Assumes ~Year 20, concentrator expanded to 100mtpa • NPV8% $8.88 billion1 Resources 50 Case • Expansion capita
Slide 12: Production highlights
Production highlights All injury frequency rate (AIFR) Concentrator throughput (per 200,000 hours worked) ('000 tonnes) ↑70% 0.47 2015 vs. 2013 34,537 0.43 27,872 28,333 0.33 20,317 ↓72% 2016 YTD vs. 2013 0.12 2013 2014 2015 Q3'16 YTD 2013 2014 2015 Q3'16 YTD Industry-leading safety performance Mult
Slide 13: Financial highlights
Financial highlights Cash position Operating cash flow ($'000,000) ($'000,000) $1,437 $719 $1,344 $651 $381 $863 Cu:$3.10 Cu:$2.49 Cu:$2.15 Au:$1,266 Au:$1,160 Au:$1,259 2013 2014 2015 Q3'16 YTD Cu:$3.33* Au:$1,411* $78 ($631) 2013 2014 2015 Q3'16 Strong cash position Consecutive periods of positive
Slide 14: Open Pit - managing ore grade challenges
Open Pit - managing ore grade challenges Phase 2 finished and Phase 3 nearly complete (2017) Phase 6 and lower-grade stockpile ore processed mid-2016 to mid-2018 Phase 4 waste mining critical, uncovers 2017 medium-grade ore, then 2018 high-grade ore Primary Crusher 2017-18 Ore (Phase 4a & 6, s
Slide 15: Oyu Tolgoi's impact in Mongolia
Oyu Tolgoi’s impact in Mongolia Mongolian Workforce Taxes and Fees In-country Spend 94% $1.6B $5.9B At the end of Q3’16, ~94% Between 2010 and 1H’16, Between 2010 and Q3’16, of Oyu Tolgoi’s workforce Oyu Tolgoi paid $1.6B in Oyu Tolgoi has spent was Mongolian taxes, fees and other $5.9B in Mongolia1
Slide 16: Oyu Tolgoi– a long-term growth opportunity
Oyu Tolgoi– a long-term growth opportunity Open pit performing as expected in low gold areas Demonstrated productivity and cost improvements Underground development progressing Long-term development optionality and plant expansion opportunities Oyu Tolgoi is the best copper asset in develo
Slide 17: Appendix
Appendix
Slide 18: Project financing – flow of funds
Project financing – flow of funds At September 30, 20161 At project finance drawdown Payable to Turquoise Hill* Receivable from Oyu Tolgoi* Proceeds: $4.3 billion2 $4.3 billion3 $4.2 billion Shareholder loan: $2.9 billion Shareholder loan: $2.9 billion Payable to Turquoise Hill* Receivable from Oyu
Slide 19: Oyu Tolgoi at China's doorstep
Oyu Tolgoi at China’s doorstep 19
Turquoise Hill Resources — Scotiabank Mining Conference 2016 on 6ix