Kpi Green Energy Limited · NSE:KPIGREEN

Kpi Green Energy — Investor Presentation (June 2024)

22 slides from Kpi Green Energy's investor presentation, Jun 4, 2024

  1. Slide 1: Cover letter to stock exchanges

    KPI/INV/PPT/2024/514 Date: June 3, 2024 BSE Limited National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers, Exchange Plaza, Dalal Street, Bandra Kurla Complex, Mumbai - 400 001 Bandra (E), Mumbai - 400051 Scrip Code: 542323 Symbol: KPIGREEN Dear Sir/Madam, Sub.: Investor Presentation for

  2. Slide 2: KPI Green Energy Limited Investor Presentation June 2024

    KPI Green Energy Limited Investor Presentation June 2024

  3. Slide 3: Company Overview

    Company Overview ▪ We are one of the leading Gujarat based renewable power Key Financial Metrics on a Consolidated Basis generating company, operating both as an Independent Particulars FY2021 FY2022 FY2023 FY2024 Power Producer (IPP) and Captive Power Producer (CPP) Total Capacity MW 58 165 312 445

  4. Slide 4: KPI Green Energy Journey

    KPI Green Energy Journey 2008 2015 2018 2020 2022 KPI Green Energy • Signing of the first PPA and • Received a GEDA registration • Successfully commissioned an • Successfully achieved the milestone of was established beginning of construction of certificate for developing the next additional 25 MW o

  5. Slide 5: Revenue Model

    Revenue Model • Develops and maintains grid-connected solar power projects as IPP and generates revenue by Unit generation growth under IPP selling power units generated from our solar plants through Power Purchase Agreements (PPAs) (Units = kWh) with reputed business houses FY16 0.02 Cr. Units IPP

  6. Slide 6: Project Execution Process

    Project Execution Process Project Monitoring and Project Evaluation Project Execution Controlling ▪ Land and Site Collection – assessing ▪ Designing and Engineering - develop ▪ Operation and Maintenance – including factors like solar and wind resource detailed project plans, including the monitoring

  7. Slide 7: O&M Capabilities

    O&M Capabilities ▪ Professional team of ~94 members to look after O&M ▪ Monitoring energy production at each level, effective data interpretation, Trending and Analytics for continuous improvement, preventive maintenance, fault restoration and Spare parts and inventory management ▪ Entire O&M is car

  8. Slide 8: Strong Execution Capabilities

    Strong Execution Capabilities Current Capacity + Order Book = ~1.68 GW Secured Capacity Summary of Key Projects already commissioned ~15yrs Renewable Energy Expertise Client Capacity Type of Project COD Date* (MW) Sudi Project# ~66.2 MW IPP-Solar Over CY 2016-21 33 sites with 1,657+ MW Greenlab ~34.

  9. Slide 9: Project Sites

    Project Sites ▪ The Government of Gujarat is now actively working to harness the State’s substantial RE potential of ~36 GW of solar capacity and ~143 GW wind capacity. And has set a target of achieving ~100GW of renewable energy capacity by 2030. This will make Gujarat a leader in renewable energy

  10. Slide 10: Key Strengths

    Key Strengths Product innovation through use of key technologies to augment efficiency Building Hybrid capability, augmenting potential through technology – Robotics Strong Pipeline and large land bank cleaning, bifacial solar panels, tracker-based structures, Drone and thermal imaging Professional

  11. Slide 11: Key Strategies

    Key Strategies Focus on a mix of IPP- CPP Projects to Capturing MSME Focus on strategic achieve a strong steady and smaller power acquisition of land cash flows with tax projects through within the vicinity of benefits subsidiaries PE sub-station Pursue portfolio Focus of growing hybrid Focus on tim

  12. Slide 12: Technological Advancement

    Technological Advancement Use Bifacial solar panels (Mono PERC halfcut solar Trackers panel) for increased efficiency and space optimization Use of single Axis Sun-tracker in order to increase generation by 20% using mechatronics system Robotic Cleaning Investing on Robotic cleaning through Research

  13. Slide 13: Project Site Pictures

    Project Site Pictures Sudi Bhimpura Sudi - Tancha Vedchha Kora 12

  14. Slide 14: Strong Clientele

    Strong Clientele IPP CPP Hybrid IPP Hybrid CPP

  15. Slide 15: Synergies within some of our Promoter Group Companies

    Synergies within some of our Promoter Group Companies Promoter and Promoter Group KP Green KPI Green Energy K. P. Energy KPI Green OMS KP Energy OMS Engineering Limited Limited Private Limited Limited Limited Our Company derives significant synergies from Subsidiaries and Group Companies Sundrops En

  16. Slide 16: Key Pillar – Leadership Team

    Key Pillar – Leadership Team Mr. Amit Khandelwal Mrs. Bhadrabala Joshi Mrs. Venu Birappa Mr. Moh. Hanif Dalchawal Non – Executive Director Non - Executive Director Independent Director Independent Director Dr. Faruk G Patel Chairman and Managing Director Mr. Tejpalsingh Bisht Mr. Sharadchandra Patil

  17. Slide 17: Awards and Recognitions

    |i ‘www kpgroup.co Mission SOLAR AWARDS 2022 An orca esse 17 4 ‘itr aun Soler Ineration & Ecellence Awards =-2016 16

  18. Slide 18: Annexure: Income Statement

    Annexure: Income Statement INR Crore FY2021 FY2022 FY2023 FY2024 Total Revenue 103.9 231.5 647.0 1,030.8 Expenses: Cost of Material Consumed 22.6 91.4 379.7 533.2 Purchases of stock-in trade 2.7 3.4 4.5 3.2 Changes in inventories of finished goods, work-in-progress and stock-in trade (0.8) (0.7) (2.

  19. Slide 19: Annexure: Balance Sheet

    Annexure: Balance Sheet INR Crore FY2021 FY2022 FY2023 FY2024 INR Crore FY2021 FY2022 FY2023 FY2024 ASSETS EQUITY AND LIABILITIES (1) Non Current Assets (1) Equity (a) Property, Plant and Equipment 315.1 481.3 800.4 898.1 (a) Equity Share Capital 18.1 18.1 36.1 60.3 (b) Capital Work in Progress 21.0

  20. Slide 20: Disclaimer (1/2)

    Disclaimer (1/2) "This presentation and the accompanying slides (the “Presentation") contains selected information about the activities of KPI Green Energy Limited ("Company") and its subsidiaries (together, the “Group") as at the date of the presentation. It does not purport to present a comprehens

  21. Slide 21: Disclaimer (2/2)

    Disclaimer (2/2) If the Company should at any time make an offering of securities, any decision to invest in any such offer to subscribe for or acquire securities of the Company must be based wholly on the information contained in the offer document or offering circular, letter of offer, and/or any

  22. Slide 22: Thank You

    Thank You

KPI Green Energy — Investor Presentation (June 2024) on 6ix