Equus Mining — Shareholder Meeting (November 2012)
17 slides from Equus Mining's shareholder meeting presentation, Nov 26, 2012
Slide 1: Annual General Meeting Presentation
CHILE Annual General Meeting Presentation 26 November 2012
Slide 2: Capital Structure
Capital Structure Ordinary Shares: 246.7M Options: 4.46M • 0.46M @ 30 cents, expiring 31 Oct 2013 • 4.0M @ 7.5 to 25 cents, expiring 13 Nov 2015 Share Price: 6 cents Market Capitalisation: $14.8M Cash and Liquid Assets*: $7.3M Top 20 Shareholders: 63% ASX Code: CIG (EQE) * Cash, listed shares, gold
Slide 3: Equus Board
Equus Board Norm Seckold Ted Leschke Colin Carson Non-Executive Chairman Managing Director Non-Executive Director Juerg Walker Mike Sandy Marcelo Mora Non-Executive Director Non-Executive Director Company Secretary 3
Slide 4: Our People in Chile
Our People in Chile Damien Koerber Lorenzo Araya (Site Foreman) Exploration Manager – South America and his Naltagua Field Crew Robert Perring Cristian Quintana Consultant Geologist Logistics Manager - Chile 4
Slide 5: Naltagua Copper - Overview
Naltagua Copper ‐ Overview Targeting*: 60Mt to 80Mt at 0.8% to 1.3% Cu • Located in one of the main copper producing belts • Close to infrastructure (75km from port of San Antonio) • Mining Leases (18.05km2) • Option to Purchase (exercisable Sept 2014 ‐ $4.3M) • Historical Mining Centre (1905 to 194
Slide 6: Location
Location South America Map Area Chile El Soldado Mine Anglo American 200Mt at 1.35% Cu Naltagua Copper District El Teniente Mine CODELCO Equus Mining Limited World’s Largest Cu-Mo Deposit Targeting* 60Mt to 80Mt at 0.8% to 1.3% Cu * The target size is conceptual in nature and should not be construed
Slide 7: Manto Model (Naltagua)
Manto Model (Naltagua) Araya-Trend Chalcopyrite Zone Yerba-Trend El Gato-Trend Bornite Zone Fault Hydrothermal Breccia Black Shale Andesite Volcanics
Slide 8: El Soldado Mine (Anglo American)
El Soldado Mine (Anglo American) • 135km north of Naltagua • 200Mt at 1.35% Cu • Coastal Metallogenic Belt (like Naltagua) • La Prado Formation (like Naltagua) • Andesite host rock (like Naltagua) • Strong structural control (like Naltagua) • Open‐pit and Underground Mining (open‐stope)
Slide 9: Naltagua Copper System
Naltagua Copper System Yerba Project Yerba Mine Araya Project Naltagua Copper System Equus Option Area Copper Occurrence 2km
Slide 10: Yerba Project Area, Naltagua
Yerba Project Area, Naltagua Phase 1 Drilling Area Channel sections limited by outcrop 33m @ 0.88% Cu 48m @ 1.35% Cu Yerba Workings 55m @ 0.27% Cu 10m @ 1.73% Cu 20m @ 0.52% Cu High Resistivity (Geophysical Anomaly) Surface Rock Channel Geochemistry (2m & 5m composites) 500m Outcropping Copper
Slide 11: Yerba Mine (Metallurgy)
Yerba Mine (Metallurgy) Copper Sulphide (Bornite) Adit Metallurgical Sample Site Yerba Structural Trend • 30kg ALS Ammtec, Sydney • Premium sulphide concentrate (41% Cu, 463g/t Ag) • +75% recovery in partially oxidised ‘ore’ ( considerable upside) • Silver (Ag) reporting with copper in sulphide conc
Slide 12: Yerba Mine - Longsection
Yerba Mine – Longsection 600m RL blocke d adit Pit Wall: 48m @ 1.3% Cu 34m @ 0.6% Cu Yerba Open Pit 550m RL adit 56m @ 1.1% Cu adit 60m @ 1.7% Cu adit 55m @ 0.1% Cu 40m @ 0.6% Cu adit 500m RL 40m @ 1.1% Cu 40m @ 0.4% Cu adit 50m @ 0.2% Cu 50m
Slide 13: Yerba Mine
Yerba Mine 48m @ 1.35% Cu Yerba Pit (Historical Working – Early 1900’s) Drill Pad Drill Pad 48m @ 1.35% Cu Depth Limit of Historical Workings Planned Initial Drill Holes IP Chargeability 200 metres
Slide 14: Naltagua Copper System
Naltagua Copper System Yerba Project Yerba Mine Araya Project Naltagua Copper System Equus Option Area Copper Occurrence 2km
Slide 15: Araya Project
Araya Project Araya Project Area 16m @ 1.9% Cu Underground (adit) 20m @ 0.65% Cu Surface Outcrop Hydrothermal Breccia Copper Working (Adit) Copper Occurrence (No Working) Rock Channel Geochemistry (2m & 5m composites) 500m
Slide 16: Disclaimer & Compliance
Disclaimer & Compliance This presentation has been prepared by Equus Resources Limited (“Equus”). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties, though Equus has no re
Slide 17: CHILE
CHILE www.equusmining.com 17