Barksdale Resources Corp. · TSXV:BRO

Barksdale Resources — Investor Presentation (February 2026)

34 slides from Barksdale Resources's investor presentation, February 2026

  1. Slide 1: Copper & Critical Metals for a Sustainable Future

    TSXV: BRO FRA: 2NZ OTCQB: BRKCF COPPER & CRITICAL METALS FOR A SUSTAINABLE FUTURE INVESTOR PRESENTATION February 2026

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS TERMS OF USE AND DISCLAIMER – This presentation is being provided for the sole purpose of providing the recipients with background information about Barksdale Resources. (“Barksdale Resources” or the “Company). Barksdale Resources has made reasonable efforts to ensure that

  3. Slide 3: Barksdale: Focused on Exploration in Two Distinctive Districts

    BARKSDALE: FOCUSED ON EXPLORATION IN TWO DISTINCTIVE DISTRICTS Patagonia District, Arizona • USFS PoO and FONSI Approved • Copper Porphyry System • Huge multi-deposit type potential • Neighbor to World Class Resource San Javier District, Mexico • Copper PEA Resource • 60% to 85% Recoveries • Undefin

  4. Slide 4: Our Projects

    OUR PROJECTS SUNNYSIDE PROJECT The Sunnyside Property is held by Arizona Standard, a 51%-49% joint venture between Barksdale Resources and Great Basin Metals. The planned 2026 Phase II program will increase Barksdale’s ownership to 67.5%. Historical drill intercepts on the Sunnyside property*: • CRD

  5. Slide 5: Capital Structure

    CAPITAL STRUCTURE As of Feb 19, 2026. All prices listed in CAD. TOP 30 DAY SHARE PRICE RANGE $0.105 – $0.20 SHAREHOLDERS SHARES OUTSTANDING 206,097,077 • Teck Resources OPTIONS 113.331 million • Crescat Capital • Osisko Dev Corp WARRANTS 97.917 million • US Global Investors • Eric Sprott FULLY DILUT

  6. Slide 6: Barksdale Timeline

    BARKSDALE TIMELINE June 2025 May 2021 The Company Barksdale acquires Goat Canyon Feb 2024 announces a and Canelo from Kennecott Announcement of Feb 2025 board decision to February 2026 Aug 2017 Aug 2019 13 mineralized Highly regarded geologist pursue Phase ll The Phase ll BRO announces Barksdale acq

  7. Slide 7: Barksdale Leadership Team

    BARKSDALE LEADERSHIP TEAM Board of Directors DARREN BLASUTTI WILLIAM WULFTANGE ALAN ROBERTS BRAD NORLING Chairman EVP Minera Alamos CEO and Director VP Exploration & QP Senior Permitting Consultant President, Mexico, Americas Gold William began his career in Nevada as A seasoned professional with ov

  8. Slide 8: Barksdale Arizona Holdings

    SUNNYSIDE – 51%, plan to 67.5% BARKSDALE ARIZONA HOLDINGS • Downdip extensions of South 32’s Taylor and Peake deposits, but that’s not all…. • Near surface chalcocite deposits • Porphyry style Cu and Au • 286 unpatented claims, 5,223.1 acres • Earn-in up to 67.5% CANELO and GOAT CANYON - 100% • Form

  9. Slide 9: One System, Two Properties

    ONE SYSTEM, TWO PROPERTIES • The SUNNYSIDE PROJECT borders South32’s Hermosa project on the North, South and East claim boundaries • The HEAT ENGINE responsible for mineralization at Sunnyside and Hermosa is located on the SUNNYSIDE PROJECT Secondary • BRO exploration confirmed the Targets extension

  10. Slide 10: One System, Multiple Discoveries

    View to the North ONE SYSTEM, MULTIPLE DISCOVERIES SUNNYSIDE TARGETS CHALCOCITE MANTO UPPER PORPHYRY SUNNYSIDE PORPHYRY PEAKE EXTENSION TAYLOR EXTENSION Note: Initial drilling at Sunnyside prior to Barksdale Resources was completed before the implementation of NI 43-101 standards and has not been ve

  11. Slide 11: South32's Hermosa (Our Sunnyside Neighbor)

    SOUTH32’s HERMOSA (Our Sunnyside Neighbor) ~US$6 Billion 28 Year 4.3Mtpa US$0.16/lb Acquisition and Mine Life Annual Milling Capacity All-In Sustaining Costs Construction • 65Mt reserve grading 4.35% • Production: 114kt zinc; 142kt for Zinc (After Credits) • Acquired for $1.7B in 2018 Zinc, 4.9% Lea

  12. Slide 12: 2026 Phase II Strategy

    2026 PHASE ll STRATEGY To complete a 25,000-foot RC drill program to secure 67 ½% ownership of Sunnyside. Targets include: • Near surface hypogene Chalcocite targets and mid-level Porphyry mineralization • Near surface Fracture Study Cu-Au, Au and Ag- Pb-Zn • Near surface CSAMT and NSAMT geophysics

  13. Slide 13: Phase II Targets (proposed)

    World’s Fair Target NSAMT Target PHASE ll TARGETS (proposed) Chalcocite Targets Aerial view of the extensive surface and near surface presence (dashed outline) of Chalcocite (Cu2S) recognized by ASARCO, Kerr McGee and others in historical exploration programs. BRO plans a series of holes to confirm,

  14. Slide 14: Phase II Targets (proposed)

    PHASE ll TARGETS (proposed) Chalcocite Target Infill • Follow up 1990 ASARCO recommendations to infill. Upper Porphyry Target • Offset and twin TM-8 to begin definition of the upper porphyry system for Cu and Zn as hit in SUN25-002 and 003. TSX.V: BRO / 14

  15. Slide 15: Interpolated Copper Concentrations

    INTERPOLATED COPPER CONCENTRATIONS TSX.V: BRO / 15

  16. Slide 16: Interpolated Gold Concentrations

    INTERPOLATED GOLD CONCENTRATIONS TSX.V: BRO / 16

  17. Slide 17: Phase II Targets (Shallow)

    PHASE ll TARGETS (Shallow) • Shallow NSAMT geophysical target • Surface Gold and Lead anomaly over the projection of various vein- bearing structures • Potential for mineralized breccia pipes, porphyry and epithermal veins TSX.V: BRO / 17

  18. Slide 18: Barksdale Mexico Holdings

    BARKSDALE MEXICO HOLDINGS SAN JAVIER PROJECT • 140 km/87 mi southeast of Hermosillo in Mexico state of Sonora • 12 mining concessions with a mining claim area of ~1,184 hectares • Area features development ready infrastructure • NI 43-101 PEA on project TSX.V: BRO / 18

  19. Slide 19: San Javier Project

    SAN JAVIER PROJECT • Gold intercepts not in current PEA TSX.V: BRO / 19

  20. Slide 20: San Javier Project

    SAN JAVIER PROJECT • Copper intercepts from PEA TSX.V: BRO / 20

  21. Slide 21: San Javier PEA Resource

    MINERAL RESOURCE NOTES SAN JAVIER PEA RESOURCE • Project NPV estimated at $111.9 million (7%) with an IRR of 26.3 and a payback of 3.8 years, all pre-tax. Tonnes Tcu As+Cn Cu AsCu CnCu • Tcu = total copper grade; AsCu = acid soluble X1000 % % % % copper; CnCu = cyanide soluble copper Measured 12,485

  22. Slide 22: Why Invest in Barksdale Resources?

    WHY INVEST IN BARKSDALE RESOURCES? CRITICAL EXPLORATION JURISDICTION MANAGEMENT CREATE VALUE METALS Down dip extensions of Our present emphasis is Our leadership team is The Company is Barksdale is committed to South 32’s Taylor and on our Sunnyside project highly experienced and committed to creati

  23. Slide 23: Contact

    CONTACT IRA M. GOSTIN Head of Investor Relations 604-398-5385 ir@barksdaleresources.com www.BarksdaleResources.com TSX.V: BRO / FRA: 2NZ / OTCQB: BRKCFb TSX.V: BRO / 23

  24. Slide 24: Supplemental Information

    SUPPLEMENTAL INFORMATION TSX.V: BRO / 24

  25. Slide 25: Arizona Option Agreement

    ARIZONA OPTION AGREEMENT • Barksdale maintains an initial 51% of Sunnyside over a two-year period. • It may then elect to increase to 67.5% over an additional two-year period. Exploration Period C$ Cash Drilling Footage Number of Shares Requirement (C$) On execution of ✓ $750,000 ✓ 1,250,000 (issued

  26. Slide 26: Barksdale Drill Program Results

    BARKSDALE DRILL PROGRAM RESULTS View to the East ONE SUN-003 • 10.21m Cu, Zn+Pb, Ag SYSTEM, and 98.55 ppm Sb • 15.24m Cu, Zn+Pb, Ag MULTIPLE and 71.64 ppm Sb • 9.14 m 0,16% Cu, 1.30% DISCOVERIES Zn+Pb, 246 g/t Ag and 85.59 Sb. SUNNYSIDE TARGETS SUN-003 • 20.58m 0.85% Zn+Pb, CHALCOCITE MANTO 1.19% Mn

  27. Slide 27: Porphyry Deposit Model

    PORPHYRY DEPOSIT MODEL SUNNYSIDE ASSOCIATED MINERAL DEPOSITS ▪ Porphyry Cu +/- Au, Mo ▪ Proximal Skarn Cu-Au ▪ Distal Skarn Au/Zn-Pb ▪ CRD Zn-Pb-Ag +/- Au/Cu Sed-Hosted Distal ▪ Disseminated Au-Ag +/- Sb +/- Hg ▪ Chalcocite Cu NOTES: Sillitoe, R.H. (2010), Econ. Geol., V 105, p 10. TSX.V: BRO / 27

  28. Slide 28: Phase II Targets

    PHASE ll TARGETS (proposed) Chalcocite Zone • Cu and Ag Upper SS Porphyry • Cu, Zn and Pb SPRING 2026 TBD Lower SS Porphyry • Cu, Zn and Pb CRD and Skarn Deposits • Zn, Pb and Mn • Extensions of Taylor • and Peake TSX.V: BRO / 28

  29. Slide 29: Interpolated Ag+Pb+Zn Concentrations

    Interpolated Ag+Pb+Zn ‘Sum (ppm) [ls:-285 —_<somporcentio [Exe 490—sotpercente [Jst-64 cat percentie [Jee-76 10m percentio [706-820 75h percentio (eet 1,120 son percentie g | [J] 121-1500. esin percentie Ti 2201-10104 97.0 percentile Hore Mines — Fouts [ Dartadale Procerties BARKSDALE Interpolated A

  30. Slide 30: Hermosa Exploration Potential – Peake Prospect

    HERMOSA EXPLORATION POTENTIAL – PEAKE PROSPECT Exploration results support the potential for large copper system • Exploration drilling has identified near-mine exploration targets, including the Peake prospect • High-grade copper-lead-zinc-silver mineralisation has been intersected at the skarn hos

  31. Slide 31: PFS Mine Design

    PFS MINE DESIGN Our PFS mine design employs conventional methods, delivering high productivity from multiple faces Taylor Deposit underground mine design Dual shaft access prioritises 0 higher grade ore in early years Ventilation shaft Ma in shaft 800m Proposed mining method is low technical risk, e

  32. Slide 32: South32 Hermosa Project (2025)

    SOUTH32 HERMOSA PROJECT (2025) Hermosa to bring significant base metals production growth Taylor deposit • Future top 10 global zinc mine4 in the industry’s first cost quartile5 Zinc-lead-silver • Initial 28-year(a) operating life, with significant extension potential • Construction underway with fi

  33. Slide 33: South32 Hermosa Project (2025)

    SOUTH32 HERMOSA PROJECT (2025) TSX.V: BRO / 33

  34. Slide 34: Patagonia District Geology

    PATAGONIA DISTRICT GEOLOGY Vikre, P.G., ( 2014) Econ. Geo., 109, pg. 1667-1704 TSX.V: BRO / 34

Barksdale Resources — Investor Presentation (February 2026) on 6ix