Arrow Exploration Corp. · TSXV:AXL

Arrow Exploration — Investor Presentation (September 2026)

37 slides from Arrow Exploration's investor presentation, September 2026

  1. Slide 1: Arrow Exploration Corporate Presentation

    AIM | TSXV : AXL ARROW EXPLORATION Growing & Socially-Responsible Energy Company Corporate Presentation | September 2026 All amounts in USD unless otherwise noted Unless stated otherwise, all dollar figures refer to US dollars

  2. Slide 2: Disclaimer

    Disclaimer Important Information The content of information contained in this presentation (the “Presentation”) has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 (“FSMA”). Reliance upon this Presentation for the purpose of engaging in any

  3. Slide 3: Arrow Exploration

    arrow EXPLORATION JP”

  4. Slide 4: Who is Arrow Exploration?

    Who is Arrow Exploration? Explorers Developers • 5 Arrow discoveries including Icaco, RCE, CN, MA, and • Over 50 wells drilled, 26.6 kms of roads built, 5 well pads Alberta Llanos • Drilled 10% of all wells in Colombia in 2024 (ex-Ecopetrol) • Over 215 km² of 3D seismic acquired across 2 contracts M

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot $145MM 6,000 + 21.4mmbbl Market Cap – Sept 14, 2026 BOE/D 2026 MY 2P Reserves $200 Million CAD Production $52.44/bbl $21.7MM $57.7M Oil Netbacks Cash/No debt Revenue, net of royalties H1 2026 (Brent - $87) September 1, 2026 H1 2026 Valuation Metrics Share Ownership 2P NAV/Share: $

  6. Slide 6: 2026 Share Performance

    2026 Share Performance aN aS S as S S —Arrow Exploration << Brent - USD/bbl 160% 140% 120% 100% 80% 60% 40% 20% 0% -20% anow >

  7. Slide 7: 2026 Mid-Year Reserves

    2026 Mid-Year Reserves Independent reserve evaluation by Boury GEC | Effective date August 15, 2026 HISTORICAL 1P, 2P AND 3P VOLUMES 40,000 1P 2P 3P $ 731 MM 35,000 RESERVES VOLUMES, MBbls 30,000 34,474 25,000 $524 MM $ 409 MM The 1P reserves have been prepared 20,000 $473 MM assuming the Tapir bloc

  8. Slide 8: Total Production

    Total Production • Improved resource recovery rates and reduced downtime, contributing to higher overall production • Clear pathway for future growth established, with ongoing projects and exploration set to further boost production • Broad production spread across wells – reduces concentration risk

  9. Slide 9: Brent vs. Netback

    arrow Brent vs. Netback Soa Brent vs. Netback $120.00 $100.00 $80.00 $60.00 $40.00 $20.00 $- $60.00 $70.00 $80.00 $90.00 $100.00 Brent mNetback mOpex mRoyalties m Differentials

  10. Slide 10: HZ Well Program Returns

    HZ Well Program Returns Carrizales Norte The horizontal well program at Carrizales Norte delivers exceptional returns, validating Arrow's development strategy and capital allocation discipline. Proven Economics Repeatable Model Industry-leading returns driven by low-cost operations and high-quality

  11. Slide 11: Colombian Oil Portfolio

    Colombian Oil Portfolio Llanos Basin

  12. Slide 12: Llanos Basin- Home to Arrow's core Tapir Block

    Llanos Basin- Home to Arrow’s core Tapir Block The ‘Park Avenue’ of Colombia’s Oil Industry – Safe, Secure and Highly-Desirable • Largely flat-lying areas with little vertical relief • Strong community support Parex acquired Frontera assets

  13. Slide 13: The Tapir Block

    The Tapir Block • The Tapir contract expires in February 2028 • The contract contains two, 5-year extensions provisions that can be granted at the discretion of Ecopetrol • All obligations for the extensions listed in the contract, financial, production, communities, have been fulfilled • The partne

  14. Slide 14: Development on the Tapir Block

    Development on the Tapir Block

  15. Slide 15: Icaco Discovery

    Icaco Discovery B Icaco-2 A Icaco-1 • Icaco-1 well drilled in 5 days Pay in the C7, Gacheta and Ubaque formations • Icaco-2, 3, 4, 5 delineation also drilled and on production • Icaco-6 disposal well • Development plan includes horizontal and deviated wells

  16. Slide 16: Icaco Main Ubaque Development

    Icaco Main Ubaque Development Besides the two existing horizontal wells, up to 4 more horizontals could be drilled

  17. Slide 17: Icaco C7 Development

    Icaco C7 Development Besides the 5 C7 penetrations we have already (soon 3 producers), at least 9 more locations to properly drain the reserves

  18. Slide 18: Mateguafa Attic Discovery

    Mateguafa Attic Discovery Scope and Repeatability- C7 Development Plan Top C7 depth structure • Mateguafa field discovered in 1998. Four wells drilled, two C7 producers A B (M1-M3, Cumed 630k bbls) MAT-1 M-19 M-20 • Stratigraphic and Structural trapping A M-18 MAT-3 C7, Guadalupe, Gacheta and Ubaque

  19. Slide 19: Mateguafa C9 Development Plan

    Mateguafa C9 Development Plan 4000 to 5000 feet of Horizontal Section Homogenous oil charged sandstone Mat-HZ-7 was drilled in December 2025  Cumed 110 K Bbls so far Mat-HZ-9 was drilled in January 2026  On production Mat-HZ-12 was drilled in April 2026  On production C9 Producers  Mateguafa-5 (

  20. Slide 20: Mateguafa C9 Structural Cross Section

    Mateguafa C9 Structural Cross Section A B OIL 20

  21. Slide 21: Alberta Llanos Field

    arrow Alberta Llanos Field ay a

  22. Slide 22: Alberta Llanos Field

    Alberta Llanos Field • Typical Llanos Basin prospect: three-way structural closure against a fault • Multiple zone discovery: C7, Guadalupe, Gacheta, & Ubaque  121 feet (Hydrocarbon bearing reservoir) • Located approximately 3.5 km northeast of Carrizales Norte discovery on same fault trend

  23. Slide 23: Carrizales Norte Field

    arrow Carrizales Norte Field EXPLORATION JP

  24. Slide 24: Carrizales Norte: Horizontal Well Program

    Carrizales Norte: Horizontal Well Program • The first horizontal well was spud on May 14, 2024. A 622 m horizontal section was drilled within the Main Ubaque reservoir. The well was brought on production on June 15, 2024 and initial production Main Ubaque depth structure was over 3,000 bbl/d gross (

  25. Slide 25: Carrizales Norte: C7 Potential

    Carrizales Norte: C7 Potential • Reservoirs consist of channelized sand bodies with excellent Carrizales Norte Conceptual C7 Existing Wells characteristics – porosity of 28 – 34% and multi-Darcy permeabilities Development Plan Current C7 • Light oil (>30o API) and strong water drive allow for very h

  26. Slide 26: Rio Cravo Este Field

    arrow Rio Cravo Este Field say a

  27. Slide 27: RCE Development

    RCE Development RCE-HZ-10 drilled in 2025 targeting Ubaque RCE- 9 drilled in 2025 targeting C7 Future Ubaque HZs Future C7 drills Future Gacheta drills C7 Structure Map Ubaque Structure Map

  28. Slide 28: Tapir Block: Fields, Prospects & Leads

    Tapir Block: Fields, Prospects & Leads – Scope and Repeatability Inventory and Running Room • The Tapir Block contains the Icaco, Carrizales Norte (CN), RCE, Alberta and Mateguafa Fields, all of which are producing and have demonstrated significant oil potential, providing a strong foundation for fu

  29. Slide 29: Macoya Prospect – Scope and Repeatability

    Macoya Prospect – Scope and Repeatability Top Ubaque depth Structure Top C7 depth Structure a MACOYA-1 MACOYA-1 b 500 M 500 M MACOYA-1 MACOYA-1 logs – C7 MACOYA-1 logs – Ubaque • The Macoya-1 was drilled in April-1993, by Heritage Colombia, based on available 2D seismic • The well encountered reserv

  30. Slide 30: Caporal Sur Prospect

    Caporal Sur Prospect A B C7 Guadalupe Gacheta Ubaque Paleozoic Guadalupe depth structure 1 KM A Caporal Sur B • Caporal sur is a 4-way dip closure mapped over the Tapir Sur 3D survey • The structure is observed on the depth migrated volume • The structure extends from the Ubaque to the C7 reservoirs

  31. Slide 31: Oxbow Prospect

    Oxbow Prospect Downdip extent Channel edge (stratigraphic) and structural dip acting as trap Alberta pad surface location • Oxbow is a stratigraphically trapped prospect • C7 is the primary target. • The channel geometry can be mapped from 3D seismic amplitudes • Oxbow can be reached from existing A

  32. Slide 32: Water Disposal Capacity

    Water Disposal Capacity • Licensed to dispose of >130,000 BPD • Arrow received ANLA (Colombian environmental agency) approval for increased water disposal, enhancing their ability to support production growth

  33. Slide 33: Financial Resources

    Financial Resources Prepayment Facility - Prepayment On May 30, 2025, Facility Arrow announced it had entered into a two-year crude prepayment agreement with an integrated energy major • On May 30, 2025, Arrow announced it had - The agreement provides access for up to 20 million USD in entered prepa

  34. Slide 34: Thorsby Canada Producers and Potential Locations

    Thorsby Canada Producers and Potential Locations Shale plug Proved and Producing Wells • 14 producing wells • Total Proved development plan includes 18-22 locations on 5 pads • Additional possible locations not included in economic runs Well Year Pad Count 2027 02-06 3 2028 09-31 3 2029 05-27 3 13-2

  35. Slide 35: Development Plan

    Development Plan Total Proved Development Plan – Management Estimates • Drilling one pad per year grows production significantly and can easily be accelerated • Asset grows within cashflow

  36. Slide 36: Near Term Catalysts – Scope and Repeatability

    Near Term Catalysts – Scope and Repeatability 5 Major Discoveries to Date 2026 Focus 5 Major Discoveries to Date – 47 Successful  RCE Wells Drilled  Alberta Llanos  Mateguafa Attic Exploration  RCE Mateguafa Attic and Development  Carrizales Norte  Alberta Llanos  Icaco  Mateguafa Attic  I

  37. Slide 37: 203, 2303 – 4th Street SW Calgary Alberta T2S 2S7

    Marshall Abbott CEO T: 1 (403) 651 5995 E: mabbott@arrowexploration.ca Joe McFarlane CFO T: 1 (403) 818 1033 203, 2303 – 4th Street SW E: jmcfarlane@arrowexploration.ca Calgary Alberta T2S 2S7 Auditors: Ernst & Young LLP Legal Counsel: Gowling WLG (Canada) LLP NOMAD: Canaccord Genuity Limited Broker

Arrow Exploration — Investor Presentation (September 2026) on 6ix