Botala Energy Ltd. · ASX:BTE
Botala Energy — 2023 Good Oil Conference Perth
13 slides from Botala Energy's conference presentation, Sep 7, 2023
Slide 1: Empowering Progress - 2023 Good Oil Conference Perth
Botala Energy ltd EMPOWERING For personal use only PROGRESS BOTALA ENERGY LTD 2023 Good Oil Conference Perth 7 September, 2023 Kris Martinick - CEO
Slide 2: Disclaimer
Disclaimer For personal use only This document contains a summary of information about Botala Energy Ltd (ACN 626 751 620) may be acquired in the future, will result in the discovery of an economic resource. Even if an Not a recommendation or financial product advice (Botala Energy or Company) and i
Slide 3: Corporate Overview
CORPORATE OVERVIEW Botala Energy Highlights Top 5 Shareholders3 Shareholder Shareholding Ownership For personal use only Botala listed on ASX in July 2022. • Exploration Wells Serowe-6&7 drilled. Wolf Gerhard Martinick (Chair) 31.5m 23.1% • Spudded first commercial pilot well at Serowe CBM Pure Hydr
Slide 4: Project Location
Project Location For personal use only Serowe CBM Field ~420,000 Hectares EMPOWERING PROGRESS 4
Slide 5: Serowe CBM
Serowe CBM Project Serowe-7 Project Pitse Commercial Pilot Flow-testing For personal use only Volumes in bcf Contingent Prospective ~26km (Billions of Cubic Feet) Resource Resource Serowe #1 Serowe #5 Serowe #7 Gross (100% Ownership) Serowe #3 Low Estimate 238 6,006 Net of Royalties Serowe #4 Best E
Slide 6: Serowe-3 Flaring Milestone
Serowe-3 Flaring Milestone For personal use only ▪ 1Gas flared at Serowe-3.1 well ▪ Flow-testing reaches appraisal milestone ▪ Gas pressure continuing to increase ▪ Flowing of Serowe-3.1 is a critical element in the process of declaration of commerciality. 1ASX release 5 September, Gas Appraisal Mil
Slide 7: Results of Botala wells S1-S7-S3
For personal use only Results of Botala wells S1-S7-S3 ▪ Serowe-1 Proof-of-Concept Well - certified prospective resource of ~23.8 Bcf. ▪ Intersected 3 coals seams; top “Serowe” seam is primary target. ▪ Similar thickness in all 3 wells. ▪ Exploration wells - 26 and 48km step outs from Serowe-1, with
Slide 8: Project Pitse – Commercial Pilot
Project Pitse – Commercial Pilot S-1 For personal use only ▪ Build on Serowe-3.1 results to determine the commercial S-5 S-2 flow-rate potential. S-4 ▪ 4 well pilot programme 350m S-3 spacing: ▪ 3 Wells testing all three seams Timeline1 ▪ 1 Well testing only Serowe seam Q3 2023 / Q4 2024 / Q1 Q2 Dri
Slide 9: Current Exploration & Appraisal Programme
Current Exploration & Appraisal Programme1 For personal use only 2023 2024 Serowe-3 2Mining Licence Submission 3Development Flow-testing Gas Flowing Project Pitse Serowe-7 Flow-testing Gas Flowing Serowe-7 Pilot Slim Hole Drilling Programme Core Lab Testing Exploration Wells 1The above timelines are
Slide 10: Binding MoU with Solar Finland
Binding MoU with Solar Finland Progressing with business case development of For personal use only first significant full-automated Solar PV Panel manufacturing plant in Southern Africa. Companies working together to establish a Joint Venture with Solar Finland.1 1Botala Energy reiterates that its r
Slide 11: Thank You
Botala Energy Ltd For personal use only Ke A Leboga Thank You botalaenergy.com info@botalaenergy.com.au
Slide 12: Commercialisation Concept
Commercialisation Concept For personal use only Initial Development Plan • Serowe CBM Project is the primary undertaking Pilot Project • Developing how to monetise to avoid a stranded asset 1Serowe Energy Hub Serowe CBM Project Phase 0 – Proof of Concept 20MW 2Hybrid power plant delivering 10MW disp
Slide 13: Leupane Preliminary Site Layout
Leupane Preliminary Site Layout For personal use only EMPOWERING PROGRESS