NCC Limited · NSE:NCC
NCC — Investor Presentation (September 2017)
133 slides from NCC's investor presentation, September 2017

Slide 1: NCC Limited
NCC LIMITED “NCC HOUSE”| Madhapur | Hyderabad – 500 081 | India Sep - 2017 Copyright © 2017 NCC Limited

Slide 2: Presentation Outline
PRESENTATION OUTLINE • HISTORICAL BACKGROUND • INDUSTRY OUTLOOK • SEGMENTS • FOCUSED GROWTH STRATEGY Copyright © 2017 NCC Limited

Slide 3: Historical Background
HISTORICAL BACK GROUND Copyright © 2017 NCC Limited

Slide 4: Vision Mission Values
VISION To be a world class construction and infrastructure enterprise committed to quality, timely completion, customer satisfaction, continuous learning and enhancement of stakeholders value. MISSION To build a strong future ensuring increased returns to shareholders and enhanced support to associa

Slide 5: NCC – Growing Reputation
NCC – GROWING REPUTATION • Fastest growing Construction Company in 2006 • Twelve research reports during last two years with BUY recommendation • A return of 95% to GDR holders in the first year • Recognition by Forbes Asia as “ Best Under a Billion” • Invitation by “World Economic Forum” to partici

Slide 6: Strong financial position and excellent credit rating
Strong financial position and excellent credit rating • Relatively low levels of long‐term bank loans –Short h term lloans primarily l used d ffor working k capitall requirements • Able to borrow on good terms and at favourable rates due to strong standing in construction industry and good track rec

Slide 7: Experienced and Professional Management
Experienced and Professional Management Experienced • 4,733 employees including 3.072 engineers Management and Skilled • Focus on skills improvement through training workforce • Rakesh Jhunjunwala Major Investors • DSP Blackrock • Focus on timely execution has been rewarded by clients in the form of

Slide 8: Experience, Size and Know-how
Experience, Size and Know‐how NCC amongst most experienced firms in industry NCC achieved significant scale to bid for and win 2014 Rights Issue of Rs. 6 Bn large contracts 2011 Company rebranded as NCC Consolidated Revenues (Rs. Mn) QIP Issue of $ 70 Mn 2009 Equity - investment 2007 by Blackstone 2

Slide 9: Company Snapshot
Company Snapshot • One of the largest Indian construction companies in terms of ( Mn) revenues • Presence across buildings & housing, transportation, water & Total Order Book: Rs. 219,090 Mn environment, irrigation, electrical, metals, mining, power and railways l (As on Sep – 2017) • Well diversifi

Slide 10: Company Snapshot
Company Snapshot Total Turnover: Rs. 35,830 Mn (as on Sep 30, 2017) 1% 0% Buildings 8% 4% 7% Roads Water & Env. & 46% Railways Electrical 29% Irrigation Power & Metals 5% Mining Internationals Copyright © 2017 NCC Limited

Slide 11: Size & Scale
Size & Scale • Among the top 3 construction companies in India in terms of revenues • Our size and scale help us pre‐qualify for larger projects • N b off offices Number ffi across IIndia di enables bl activeti participation ti i ti iin project j t bid bids • Backed by strong execution teams, curren

Slide 12: Significant Increase in Government Spending on Infrastructure
SIGNIFICANT INCREASE IN GOVERNMENT SPENDING ON INFRASTRUCTURE $10 bn planned investment in Airport sector in next 5 Years Huge opportunities in MASS RAPID TRANSPORT SYSTEM in Urban cities Existing & New cities infrastructure upgradation & development NHAI revises highway project awarded target to 10

Slide 13: Industry Outlook
INDUSTRY OUTLOOK Copyright © 2017 NCC Limited

Slide 14: Executing Projects Across India & Overseas
Executing Projects Across India & Overseas New Delhi Dubai Lucknow Ranchi Muscat Ahmadabad Bhopal Kolkata Hyderabad Bhubaneswar Mumbai M b i Visakhapatnam Banguluru Chennai Kochi Copyright © 2017 NCC Limited

Slide 15: Segments
SEGMENTS Copyright © 2017 NCC Limited

Slide 16: New Divisions
Buildings & Water & Roads Electrical Irrigation International Housing Environment • Housing projects • Highways • Water supply • Transmission • Dams • Buildings • Industrial projects p j and distribution • Bridges Bridges, flyovers lines and sub‐ • Lift irrigation • Roads R d buildings and elevated

Slide 17: Key Business Divisions: Buildings & Housing, Roads, Oil & Gas
Buildings & Housing, Roads, Oil & Gas Construction spending for Urban infrastructure expected to amount to Rs. 267 bn(US$ $ 5.8 bn) in Eleventh Five year plan Key drivers include growing Indian industry & economy, increasing urbanization and household growth Buildings , Housing & Roads ( Mn) I

Slide 18: Buildings & Housing
Buildings & Housing Some of the Major Projects Executed are: Copyright © 2017 NCC Limited

Slide 19: Buildings & Housing
Buildings & Housing Project: Tuberculosis Research Center, Chennai PROJECT: GOVT. HOSPITAL, CHENNAI Scope : New patient care & clinical facility at TB Hospital, Chennai Project: Army Medical College, New Delhi Project: Apollo Hospital, Bhubaneswar Copyright © 2017 NCC Limited

Slide 20: Buildings & Housing
Buildings & Housing Project: ESIC Medical College ‐Gulbargha, Karnataka

Slide 21: Buildings & Housing
Buildings & Housing MEDICAL COLLEGE - MANDI a! == ADMIN BLOCK

Slide 22: Buildings & Housing
Buildings & Housing 26 11 2014 P EXAMINATION HALL MEDICAL COLLEGE LECTURE THEATRE

Slide 23: Buildings & Housing
Buildings & Housing Project: Wipro Technologies, Cochin Project: IDCO, Bhubaneswar Scope : Superstructure & Civil Work for Software Dvlpt., Centre Scope p : Software Complex p ((Fortune Towers)) Project: Patni Computer, Mumbai Project: Satyam School, Hyderabad. Scope : I.T.Centre at MIDC Knowledge P

Slide 24: Buildings & Housing
Buildings & Housing Project: Delhi Devp. Authority, Navsaad Vihar Housing socity, Delhi. Project: Army Welfare Housing org., Panchakula, New Delhi. Scope : Multi Storied apartments & Site development work. Scope : Accommodation for AWHO on part ‘A’ of Plot in sector‐20 Project: SBI, Mumbai. Project:

Slide 25: Buildings & Housing
Buildings & Housing Copyright © 2017 NCC Limited

Slide 26: Buildings & Housing
Buildings & Housing IDA Green Wood ‐ Lucknow Sahara Homes DG MAP‐VIZAG MAP VIZAG – MODEL BLOCK J N T U – HYDERABAD ‐ Auditorium d Copyright © 2017 NCC Limited

Slide 27: Buildings & Housing
Buildings & Housing Copyright © 2017 NCC Limited

Slide 28: Buildings & Housing
Buildings & Housing Copyright © 2017 NCC Limited

Slide 29: Buildings & Housing
Buildings & Housing Copyright © 2017 NCC Limited

Slide 30: Buildings & Housing
Buildings & Housing Project: JMD, Delhi Project: j KBH‐DOC,, Chamrajnagar, j g , Karnataka Scope: Commercial Complex at Gurgaoni. Scope: Construction of District Office Complex Project: Cabinet Secretariat Building, New Delhi Project: NAC, NAC Hyderabad (Rewared received for early completion Scope:

Slide 31: Buildings & Housing
Buildings & Housing Project: SAAP Gachibowli, Gachibowli Hyderabad Scope: Accommodation fo9r Athletics. Project: District Office Complex ‐ Haveri Project: NBCC – NETAJI NAGAR, NEW DELHI Copyright © 2017 NCC Limited

Slide 32: Buildings & Housing
Buildings & Housing Delhi Metro Bhavan, New Delhi NIT, Warangal, AP Project: Satyam, Satyam Hydrabad Scope: Development Centre at Bachupalli. Times of India ‐ Mumbai Copyright © 2017 NCC Limited

Slide 33: Buildings & Housing
Buildings & Housing EIL‐DATA CENTRE‐MANESAR NIT‐Silchar – Block A MRF ‐ SADASIVPET Mahindra ‐ Satyam Copyright © 2017 NCC Limited

Slide 34: Buildings & Housing
Buildings & Housing KSRTC‐MYSORE – Sathgalli Bus Stand KSRTC‐MYSORE – Illwalai Bus Stand KSRTC‐MYSORE – Kuvempu Bus Stand PWD‐ Bowring Hospital Copyright © 2017 NCC Limited

Slide 35: Buildings & Housing
Buildings & Housing NIT A t l – Boys NIT‐Agartala B Hostel H t l NIT-SILCHAR ICFAI-Agartala-Hostel –A,B,C & D Blocks Copyright © 2017 NCC Limited

Slide 36: Buildings & Housing
Buildings & Housing SYMBOSIS INTERNATIONAL SCHOOL Copyright © 2017 NCC Limited

Slide 37: Buildings & Housing
Buildings & Housing NIT - AGARTALA IISER, CPWD Copyright © 2017 NCC Limited

Slide 38: Buildings & Housing
Buildings & Housing Copyright © 2017 NCC Limited

Slide 39: Buildings & Stadiums
Buildings & Stadiums Khelgovn‐Ranchi Copyright © 2017 NCC Limited

Slide 40: Buildings & Stadiums
Buildings & Stadiums Project: GMC Balayogi Stadium, Gachibowli, Hyderabad Project: National Games Stadium, Saroornager, Hyderabad Scope Construction of Athletic Stadium for National Games 2002 Scope: Scope Indoor Stadium for Gymnastics & Wrestling and for basketball Scope: Project: National Games St

Slide 41: Buildings & Stadiums
Buildings & Stadiums Project: Rajeev Gandhi International Cricket Stadium, Uppal, Hyderabad Scope: Stadium with 45,000 Seating capacity & other facilities Copyright © 2017 NCC Limited

Slide 42: Buildings & Stadiums
Buildings & Stadiums Project: Raipur Cricket Stadium Scope: Stadium with 60,000 Seating capacity & other facilities Copyright © 2017 NCC Limited

Slide 43: Buildings & Stadiums
Buildings & Stadiums DELHI UNIVERSITY STADIUMS –COMMONWEALTH GAMES - DELHI 2010 Copyright © 2017 NCC Limited

Slide 44: Buildings & Stadiums
Buildings & Stadiums Copyright © 2017 NCC Limited

Slide 45: Buildings & Housing
Buildings & Housing Project: Shilpakalavedika, Hyderabad Project: Indira Gandhi International Airport – New Delhi Scope: Multistoried Build‐Award Build Award received as outstanding Scope: Design and Reconstruction of Terminal IA structure ‐ 2002 P j t ISTA H Project: Hotel, t l HHyderabad d b d Pro

Slide 46: Buildings & Housing
Buildings & Housing The Oberoi and Trident, Trident Hyderabad ADANI SHANTIGRAM, AHMEDABAD Copyright © 2017 NCC Limited

Slide 47: Industrial Buildings Structures
Industrial Buildings Structures HDPE Unit For Petro Chemicals Expansion Project, Pata, Auraiya Zuari Cements Limited, Yerraguntla, Cuddapah, A.P Cement Plant at Kurnool , Andhra Pradesh Gautami Power Plant at Peddhapuram, East Godavari Dist, AP Copyright © 2017 NCC Limited

Slide 48: Industrial Buildings Structures
Industrial Buildings Structures Posco-Pune Copyright © 2017 NCC Limited

Slide 49: Industrial Buildings Structures
Industrial Buildings Structures Copyright © 2017 NCC Limited

Slide 50: Industrial Buildings Structures
Industrial Buildings Structures Copyright © 2017 NCC Limited

Slide 51: Buildings Structures - Runways
Buildings Structures ‐ Runways Copyright © 2017 NCC Limited

Slide 52: Buildings & Housing
Buildings & Housing EMBASSY of India Complex ‐ Constn.of the Embassy of Indian complex at Kathmandu 1,391.22 NBCC‐ ESIC medical college comprising of hospitals Medical and Nursing college hostels, Residential complex 6,944.50 AIIMS ‐ Patna ‐ Pkg. I ‐Constn.of Medical college and hostel complex at AI

Slide 53: Buildings & Housing
Buildings & Housing TNHB‐Construction of 1026 LIG Flats in Ambattur village(Stilt+19floors) g ( ) 1,606.30 , TNHB‐Development of works such as roads, drains, culverts, bridge, sumps, pumproom and water supply and sewarage arrangements in 1,141.90 Tiruvallur district. LDA‐Construction of "SHAN‐E‐AWAD

Slide 54: Buildings & Housing
Buildings & Housing TG&D Corpn p Ltd‐Execution of distribution strengthening g g works in 7 towns of Erode region. g 2,522.17 , NBCC‐Redevelopment of kidwainagar(East) New Delhi, Construction of social structures, Type VI & Type VII quarters 4,900.00 Engineers India Ltd ,New Delhi ‐Composite works f

Slide 55: Transportation
Transportation Some of the Major Projects Executed are: Copyright © 2017 NCC Limited

Slide 56: Metro Rail
Metro Rail Copyright © 2017 NCC Limited

Slide 57: Railways
Railways Project: Delhi Metro Rail Corporation Limited ‐ Delhi Metro Rail ‐ Bangalore Scope: Plinth casting with installation of rails in position for RC3 Copyright © 2017 NCC Limited

Slide 58: Metro-Rail
Metro‐Rail NMRCL‐Construction of NHAI Flyover ‐ orignating from Ujjawal Nagar on the North ‐South corridor of Nagapur Metro Rail Project to 642.80 Manish Nagar( NCC and C&C JV‐70%+30% of Rs 918.32 Million) CMRL‐Construction of piles and pile caps for Elevated Viaduct & associated works for a stretch

Slide 59: Roads
Roads Project: Kalina‐Vakila Flyover rcd Bonus for early completion Project: Britania Flyover at Ring Road, Lawrence Road, Delhi Scope: Flyover on Maharastra – Mumbai Highway (1427 mtrs in length) Scope: Flyover and subway intersection at Britania Chowk Project: Bangalore Elevated Flyover Project: L

Slide 60: Roads
Roads Project: Kovilpatti Flyover, Chennai Bangalore Elevated Tollway Limited S Scope: C Const. t off ROB b between t K il tti & Nalli Kovilapatti N lli att KM 94/2 & 91/4 Project: Bridge on River Sone (Longest bridge of GQ) Scope: 4 Laning & strengthening between 110 & 140 KM (Sona Bridge) Bangalor

Slide 61: Roads
Roads Project: National Express Way No.1(Phase‐II of Ahmedabad‐Vadodra) Project: Nagpur Flyover Scope: SI: Lane access controlled expressway (50km) Scope: Const. of ROB along with approaches at Km 1040/5 to 7 P j t 4 Laning Project: L i off B Bangalore l – Mysore M R d (SH Road (SH‐17) 17) P j t ORR

Slide 62: Roads
Roads Project: Necklace Road under Buddha Purnima Project for Hyderabad Urban Project: NHAI‐Six Laning of NH‐1 for 15 Kms. of Delhi Border to Samalkha Development Authority, Hyderabad section in Haryana state. Project: AP‐Package between Vishakapatnam and Champavati river of NH‐5 Project: Constructi

Slide 63: Roads
Roads HGCL ‐ Kesara to Ghatkesar ‐ ORR ‐ II‐Constn.of access controlled expressway as outer ring road 3,937.46 Muncipal Corpn.‐Bhopal‐Habibganj ‐Constn.of four lane flyover at GAD square, two lane flyover at moti maszid and six lane ROB at 1,029.31 Habibganj RVNL ‐ Bhubaneswar (Package II)‐Road BED,

Slide 64: Oil & Gas
Oil & Gas Copyright © 2017 NCC Limited

Slide 65: Key Business Divisions: Water & Environment and Railways
Water & Environment and Railways Water supply and sanitation projects expected to account for over Rs500bn(US$12.5 bn), in Eleventh Five Year plan Increasing private sector participation and use of BOOT contracts to lead growth for private players Water & Environment , Railways ( Mn) • Water sup

Slide 66: Water & Environment
Water & Environment Some of the Major Projects Executed are: Copyright © 2017 NCC Limited

Slide 67: Water & Environment
Water & Environment Project: CMWSSB, Chennai India Biggest water treatment plant, plant Amberpet, Amberpet Hyderabad Scope: M M.S.Pipe S Pipe line of 2000mm dia & 1500mm dia Raw Water & Clear water transmission pipe for 530 MLD Water treatment plant Project: Krishna Drinking Water Supply Project‐Pha

Slide 68: Water & Environment
Water & Environment Project: Kokarada, Amaravathi Dist ‐ Maharastra Project: UGD Scheme, Bellary ‐ Karnataka Scope: Rural water supply for 156 villages in Daryapur, Anjangaon Scope: p 15 MLD & 30 MLD sewage g treatment p plant, SWG/RCC p pipelines. p Project: V V‐Valley Valley Water Supply Scheme, D

Slide 69: Water & Environment
Water & Environment FACCULATATIVE AERATED LAGOONS–339MLD LAGOONS 339MLD STP AMBERPET, AMBERPET HYDERABAD CLARIFLOCCULATOR ‐ AJMER‐KEKRI AJMER KEKRI STP BIO GAS GENERATORS –339MLD STP AMBERPET FLOATING BARGE – NADIA, WEST BENGAL Copyright © 2017 NCC Limited

Slide 70: Water & Environment
Water & Environment RCC PIPE MANUFACTURING UNIT‐ INDORE JACK WELL CUM PUMP HOUSE ‐ MIHAN JACK WELL CUM PUMP HOUSE ‐ MIHAN MS PIPE LINE ‐ COIMBATORE Copyright © 2017 NCC Limited

Slide 71: Water & Environment
Water & Environment P j t IFFCO Project: P j t Nadiya Project: N di Project: Maharastra Jeevan Pradhikaran Surji ‐ Maharastra Project: Kosaram Pumping Copyright © 2017 NCC Limited

Slide 72: Water & Environment
Water & Environment Copyright © 2017 NCC Limited

Slide 73: Water & Environment
Water & Environment Copyright © 2017 NCC Limited

Slide 74: Water & Environment
Water & Environment PHED,Bikaner‐Design, construction,operation & maintenance of Water supply project Bungi Rajgarh 1,514.70 PHE, Narampur, Khatra water supply scheme, W.B‐Surveying,Planning, Designing, Delivery,Erection, construction,Commissioning and 1,699.07 completion of piped water supply schem

Slide 75: Water & Environment
Water & Environment HC WSS‐Surface water based piped water supply scheme at Nadia Dist. 2,383.00 The Supdt Engineer,PRLIS Cirlce no 1,Nagarkarnool‐Formation of Venkatadri Reservoir bund from KM 0.00 to KM 6.900 at Vattem 13,783.40 village,Mahaboobnagar district.. Sardar Sarovar Narmada Nigam Ltd‐Des

Slide 76: Railways
Railways Copyright © 2017 NCC Limited

Slide 77: Railways
Railways RVNL‐S'BAD‐Railway electrification & Line doubling with all related works of Gudivada‐Bhimavaram section 2,090.00 Copyright © 2017 NCC Limited

Slide 78: Key Business Divisions: Electrical
Electrical Indian power supply needs to grow at approximately 12% annually to keep pace with GDP growth rate of 8% per annum Central Government has introduced schemes which include “Accelerated Power Development and Reform Programme” (APDRP) for improving transmission and distribution network ac

Slide 79: Electrical: Some of the Major Projects Executed
Electrical Some of the Major Projects Executed are: Copyright © 2017 NCC Limited

Slide 80: Electrical Division
Electrical ELECTRICAL DIVISION DESIGN, ENGINEERING, ERECTION, TESTING & COMMISSIONING OF • 400 KV TRANSMISSION LINE • 220 KV TRANSMISSION LINE • 33/11 KV SUB STATION • 33 KV OVER HEAD LINE • 11 KV OVER HEAD LINE • PROJECT ELECTRIFICATION • SYSTEM IMPROVEMENT PROJECTS Copyright © 2017 NCC Limited

Slide 81: Electrical
Electrical Project: AP TRANSCO, Mahaboobnagar, AP Project: APDRP – Nagpur ‐ Maharastra Scope: Aug of 33/11 KV power trans. trans VCBs. VCBs Bay Extns‐DFID‐85/98 Extns DFID 85/98 Scope: 33 KV OH/UG Lines, Lines Substations, Substations allied work on turnkey basis Project: APGRP, Mangaldoi, Assam. Pr

Slide 82: Electrical
Electrical Project: Southern Power District Co of AP, Tirupati, AP. S Scope: TTurnkey k b i P basis j ‐ 28 Project UPPALWADI, NAGPUR APTRANCO‐Khammam Copyright © 2017 NCC Limited

Slide 83: Electrical
Electrical Copyright © 2017 NCC Limited

Slide 84: Electrical
Electrical Copyright © 2017 NCC Limited

Slide 85: Electrical
Electrical Copyright © 2017 NCC Limited

Slide 86: Electrical
Electrical P V N L, L Varanasi (RGGY PHASE ‐II II Basti)‐Rural Basti) Rural Electrification work on turnkey basis in Basti of UP 1 714 80 1,714.80 P V N L , Varanasi (RGGY PHASE‐II Maharajganj)‐Rural Electrification work on turnkey basis in Maharajganj ‐ UP 1,893.80 Rural Electrification work on tur

Slide 87: Key Business Divisions: Irrigation
Irrigation Construction investment in irrigation sector expected to be Rs. 1033bn (US$25.9 bn) during 11th Five Year plan Construction investment in Hydropower sector expected to be around US$18.5 billion during 11th Five Year plan being 57% of total investment in power sector Increasing impor

Slide 88: Some of the Major Projects Executed are:
Some of the Major Projects Executed are: Copyright © 2017 NCC Limited

Slide 89: Irrigation
Irrigation Project: Gundalkamma Reservoir Project, Ongole Project: Devadula, AP Scope: Water supply of 80,000 acres, Dam, bund, Right & Left canals Scope: Devadula Lift Irrigation Project ‐ AP Project: Tadipudi , AP Project G dik t R Gandikota Reservoir i – Gandikota‐AP G dik t AP Scope: Tadipudi Et

Slide 90: Irrigation
Irrigation Copyright © 2017 NCC Limited

Slide 91: Irrigation
Irrigation Govt.of AP ‐ CAD Irrigation (Thotapally)‐Construction of Thotapally Barrage 1,954.15 Govt.of AP ‐ CAD (Gundalakamma)‐Construction of Gundalakamma Reservoir 1,372.40 J.Chokkarao Devadula Phase III, Pkg. IV‐Devadula Phase II 4,815.30 GANDAK CANAL Project ‐ Bihar‐Execution of restoration of

Slide 92: Key Business Divisions: Power & Metals
Power& Metals The performance of the power sector directly impacts the overall economy of the country, as it is the most i important t t constituent tit t off infrastructure. i f t t The Indian Govt.’s current economic plan, with its emphasis on greater industrialization and infrastructure devel

Slide 93: Power
Power Hydro Power - Manali Project: Gowtami Powr Project, Peddapuram Project: Duhagan Hydro Electric Project Project: Gowtami Powr Project, Peddapuram S Scope: Scope: 460460 mw combined mw combined bi power cycle d cyclel atpower plant plant Kakinada l t att K Kakinada ki d S Scope: U Upstream t H H

Slide 94: Power
Power Coal Bunker #10(14 MTR LVL) & COAL BUNKER #10 (35 MTR LVL) Name of client: BHEL; Work: Site at Angul Angul, Orissa Copyright © 2017 NCC Limited

Slide 95: Power
Power Name of Client: Adhunik Power Work: Power House – Size 38M X 167M Copyright © 2017 NCC Limited

Slide 96: Power
Power Copyright © 2017 NCC Limited

Slide 97: Power
Power Copyright © 2017 NCC Limited

Slide 98: Metals
Metals SAIL‐IISCO STEEL PLANT, Blast Furnace Project, Burnpur – West Bangal Copyright © 2017 NCC Limited

Slide 99: Metals
Metals Copyright © 2017 NCC Limited

Slide 100: Metals
Metals NTPC‐BARH‐BIHAR Copyright © 2017 NCC Limited

Slide 101: Metals
Metals NTPC LTD., NOIDA‐Civil works Package for BARH Super Thermal Power project 1,095.90 NCC Power Projects Limited‐Power project at Nellore 60,753.62 SCCL ‐ Opencast Project ,Kothagudem‐Blast hole drilling, controlled blasting with shock tubeintiation, excavation, loading, Transportation 3,037.87

Slide 102: Key Business Divisions: Mining
Mining A number of opportunities exist in this space in view of the government planning to open private sector participation in mining. Untapped potential for Indian players in global market Established in 2008, this division caters to the coal needs of the ( Mn) Groupp company’s p y p power 1

Slide 103: Mining
Mining HEMM at Medapalli Open Cast Project, Ramagundam‐ AP Copyright © 2017 NCC Limited

Slide 104: Mining
Mining Copyright © 2017 NCC Limited

Slide 105: Key Business Divisions: International
International India has miniscule Rs22bn (US$0 (US$0.5bn) 5bn) share of Rs176tn(US$4trillion) global construction business business. Construction business internationally offers excellent opportunity for project exports Untapped potential for Indian construction players in global market • NCC

Slide 106: International Presence
International I t International ti lPPresence ( Mn) • NCC has presence in Oman and UAE through subsidiaries Highlights of Our International Business – NCCL International LLC in Muscat – Nagarjuna Contracting Co. LLC in Dubai Contracts won so far Rs. 9,620 Mn • Key focus areas internationally are als

Slide 107: International
International Dualization of Al Amerat Quriyat Road at Muscat Copyright © 2017 NCC Limited

Slide 108: International
International S l Salamath th H Housing i P Project: j t Sohar Water Network Phase – I at Sohar, Muscat DEWA Pipe Line Project, Dubai, Package‐ 512A Copyright © 2017 NCC Limited

Slide 109: International
International Quriyat Housing Project: Copyright © 2017 NCC Limited

Slide 110: International
International Copyright © 2017 NCC Limited

Slide 111: Subsidiaries - Business Plans
Subsidiaries ‐ Business Plans Focus on Focus On Long Term Infra Projects Real Estate Projects Residential Commercial Transportation Power Vilas IT Parks Apartments Hotels Townships SEZS Commercial Complexes Shopping Malls Copyright © 2017 NCC Limited

Slide 112: Current BOT Portfolio
Current BOT Portfolio NCC Ltd. 55% NCC Infra Roads OB Infra Limited (~63 km) 64% 48% Pondicherry – Tindivanam Tollway Limited (~36 km) Copyright © 2017 NCC Limited

Slide 113: Execution on Track
Execution on Track NCC INFRA HOLDINGS Project Exposure of Revenue NCC((1)) P j Projects P Partners C Cost (R (Rs. COD C Current SStatus (2) Model Mn) (Rs. Mn) Roads June COD achieved w.e.f 30.06.2009 Securitisation of future cash OB Infra Annuity KMC 5,896 1245.50 2009 Annuities being received regul

Slide 114: Real Estate Projects
Real Estate Projects • Real estate development spearheaded by NCC Urban Infrastructure Ltd NCC Ltd. Promoters • 17 projects planned in the Group – 8 projects are ongoing currently 80% 20% • Presence across 6 cities in India and Dubai NCC Urban • Acreage ~ 245 acres • No fresh investments from parent

Slide 115: Real Estate Portfolio
Real Estate Portfolio Percentage Type of Built up Area Projects City Acreage Current Status holding Development (Mn Sqft.) NCC Urban R id Residency, G hib li Gachibowli H d b d Hyderabad 100% R id ti l Residential 95 9.5 1 16 1.16 C Completed l t d Phase 1 Completed and NGHC Ranchi 88% Residential 5

Slide 116: Real Estate Portfolio
Real Estate Portfolio Percentage Built up Area Projects City Type of Development Acreage Current Status holding (Mn Sqft.) NCC Ltd. Development Agreement JHLP Hyderabad 25% Residential 6.00 0.80 with Mantri Developers of Bangalore Tellapur Technocity Hyderabad 26% Residential & Commercial 100.00 7.5

Slide 117: Some of the Major Projects Executed are:
Some of the Major Projects Executed are: Copyright © 2017 NCC Limited

Slide 118: Nagarjuna Green Ridge, Enclave, Green Woods
NAGARJUNA GREEN RIDGE NAGARJUNA GREEN WOODS NAGARJUNA ENCLAVE Nagarjuna Green Valley Copyright © 2017 NCC Limited

Slide 119: Nagarjuna Premier and Aster Park - Bangalore
Nagarjuna Premier ‐ Bangalore Nagarjuna Aster Park ‐ Bangalore Copyright © 2017 NCC Limited

Slide 120: Nagarjuna Suites, Bangalore
Nagarjuna Suites, Bangalore Copyright © 2017 NCC Limited

Slide 121: National Housing Complex Project at Ranchi
Construction of National Housing Complex (NGHC) Project at Ranchi. No. of flats : 2000 Copyright © 2017 NCC Limited

Slide 122: Nagarjuna Residency, Gachibowli - Hyderabad
Nagarjuna Residency, Gachibowli ‐ Hyderabad Copyright © 2017 NCC Limited

Slide 123: Nagarjuna Maple Heights I & II Bangalore
Nagarjuna Maple Heights I & II Bangalore Copyright © 2017 NCC Limited

Slide 124: NCC Urban Gardenia Gachibowli - Hyderabad
NCC Urban Gardenia Gachibowli ‐ Hyderabad No of Units: 184 Build up Area: 8.6 Lacs sft. Copyright © 2017 NCC Limited

Slide 125: Urban One - Narsingi - Hyderabad
Urban One – Narsingi - Hyderabad No of Units: 1529 Build up Area: 36.56 Lacs sft. Copyright © 2017 NCC Limited

Slide 126: Park Square Guntur, Nagarjuna Meadows II
Park Square ‐ Guntur Nagarjuna Meadows‐ II‐Banguluru Copyright © 2017 NCC Limited

Slide 127: Facade
FACADE NCC URBAN –FACADE NCC Urban Facade windows and doors combine high g q qualityy materials with perfect operation and provide a highlight of trendsetting designs and advantages. The beauty of this allows you to find ideal solutions for your windows, doors and sun protection which will match you

Slide 128: Focused Growth Strategy
FOCUSED GROWTH STRATEGY Copyright © 2017 NCC Limited

Slide 129: Focused growth strategy
Focused growth strategy Increased focus on BOT and BOOT projects in Transportation and Power O off ffew companies One i to make k early l entry iinto BOT and d BOOT projects j Expand in international markets that fit within broad strategic vision Currently focusing on Transportation Transportat

Slide 130: Numerous accolades testify to NCC's excellent reputation
Numerous accolades testify to NCC’s excellent reputation Select Awards & Accolades Award from Forbes Asia: Only construction company in India to be One On‐time performance of the 200 "Best Under a Billion" listed companies in Asia Pacific in • Possesses one the best records for quality 2005 and ti

Slide 131: Client List
Client List Copyright © 2017 NCC Limited

Slide 132: Construction Machinery & Equipment
CONSTRUCTION MACHINERY & EQUIPMENT NCC has acquired modern, sophisticated and state‐of‐the‐art construction plant, equipment and machinery imported as well as indigenous viz., Hot Mix Plant (Mobile and Stationery), Electronic Pavers,, Pneumatic Tyred y Rollers,, Vibratoryy Tandem Rollers,, Vibratory

Slide 133: Thank You
Thank You Copyright © 2017 NCC Limited
Source: Internet Archive copy of ncclimited.com
More decks from NCC Limited
Q2 FY2027 Earnings Presentation34 slides · Nov 5, 2026
Q1 FY2027 Earnings Presentation35 slides · Aug 6, 2026
Q4 FY2026 Earnings Presentation37 slides · May 15, 2026
Q3 FY26 Earnings Presentation32 slides · Feb 5, 2026
Q2 & H1 FY26 Earnings Presentation34 slides · Nov 6, 2025
Q1 FY26 Earnings Presentation20 slides · Aug 5, 2025