Slide 1: Q3 FY 2016-17 Analyst Meet
Q3 FY 2016-17 Analyst Meet Mumbai February 10, 2017
Slide 2: Disclaimer
Disclaimer By attending the meeting where this presentation is made, or by reading the presentation slides, you agree to be bound by the following limitations: This document has been prepared for information purposes only and is not an offer or invitation or recommendation to buy or sell any secur
Slide 3: Agenda
Recent Highlights Power Transmission Opportunities in India POWERGRID Today Performance (Q3FY17) Transmission Performance (Q3FY17) Consultancy Telecom XII Plan Performance Investment Outlook 3
Slide 4: Recent Highlights
recent Highlights
Slide 5: ±800kV HVDC Champa-Kurukshetra Pole-I
±800kV HVDC Champa-Kurukshetra Pole-I Power Flow Test Charged – Commissioning targeted in Feb’17 Power Transfer: 3000MW Between Champa in WR and Kurukshetra in NR Being implemented in Phases Phase-I, Pole-I: 1500 MW (~₹ 6,000 crore) Phase-I, Pole-II: 1500 MW (~₹ 3,200 crore) Line Length:
Slide 6: -400/+600MVAr SVC - Commissioned at Ludhiana
-400/+600MVAr SVC - Commissioned at Ludhiana One of the Largest Range Swing SVCs in the World Envisaged to improves Power Quality & Grid Stability Project included a high degree of local engineering & local production (Make-in-India) Thyristor Valves, Protection & Control Systems manufactured
Slide 7: Project Execution
Project Execution Major Elements Completed since Oct’16 • ER-SR Interconnection • Angul-Srikakulam-Vemagiri • Strengthening in SR • Nagapattinam PS – Salem – Dharmapuri; Tuticorin-Dharmapuri • Strengthening in Western UP • Dehradun-Baghpat-Saharanpur; Dehradun-Roorkee 7
Slide 8: Commissioning/ Capitalization
Commissioning/ Capitalization Completed/ Commissioned in FY17 (Apr’16-Jan’17) ~ ₹ 26,700 crore: Completed (including Champa- Kurukshetra HVDC & TBCB) ~ ₹ 20,700 crore: Commissioned/ Capitalized (incl. TBCB) 8
Slide 9: Special Highlight: Market Capitalization crosses ₹1 lakh crore
Special Highlight POWERGRID Market Capitalization crosses ₹ 1 lakh crore POWERGRID Stock crosses ₹ 200 mark ₹ 200 Snapshot: BSE 01.02.17 9
Slide 10: Power Transmission Opportunities in India
power lransmission Opportunities in India ONEe | 10
Slide 11: Glimpse of Indian Power System
Glimpse of Indian Power System Broad Capacity (GW): Parameters Source-wise Segmentation (%) Total Installed Diesel, 1, Capacity 0% Nuclear, 6, ~ 310 GW 2% CAGR (Mar12-Dec16): 9.7% Hydro, 43, 14% Gas, 25, Annual Consumption 8% 1200 BU Wind, 28, Growth: 5.64% (y-o-y) 9% RES, 46, 15% Peak Demand Met: S
Slide 12: Indian Power System - Changing Paradigm
Indian Power System- Changing Paradigm Renewable: 46 GW CAGR (Mar12-Dec16): 14.1% Wind Solar Total RE Wind Solar Total RE 32.7% 175.0 RE Installed Capacity (GW) RE/Total Installed Capacity (%) 18.7% 100.0 14.1% 12.5% 12.6% 12.9% 12.6% 60.0 11.2% 8.7% 8.5% 8.6% 8.3% 8.9% 42.6 31.7 34.2 25.0 28.1 26.9
Slide 13: Indian Power Sector - Outlook
Indian Power Sector - Outlook • 24x7 Affordable Power for All by 2019 • Renewable Integration : 175 GW by 2022 • Per Capita Consumption : about 4000 units by 2030; CAGR:10% • Seamless SAARC Power Grid 13
Slide 14: Towards 24x7 Power For All by 2019
Towards 24x7 Power For All by 2019 One Nation – One Grid – One Price Power Market Bringing Efficiency Into the Sector 20 Dec’16 at 9:45 pm Snapshot 14
Slide 15: National Grid Augmentation
National Grid Augmentation Creation of Energy Highways based on envisaged load growth - 11 high capacity corridors - each capacity of about 4000 MW - 3 high capacity HVDC system (6000 MW each) Wide Area Measurement System (WAMS) - Making Smart Grid 11 nos. High Capacity Transmission Corridors 15
Slide 16: Remedial Measures: Renewable Integration
Renewable Integration Remedial Challenges Measures • Intermittency • Green Energy Corridors • Variability • Green Energy Corridors-II (Solar Park Integration) • Matching Transmission • Dynamic Compensation Development • Renewable Energy • Load- Generation Management Centres balance • Storage Renewab
Slide 17: Development of Green Energy Corridors
Development of Green Energy Corridors Green Energy Corridors for Renewables (Inter-State Transmission Systems) 17
Slide 18: Green Energy Corridors-II: Solar Parks Integration
Green Energy Corridors-II: Solar Parks Integration 34 Solar Parks 20 GW Locations of Ultra Mega Inter-State transmission Solar parks 13 solar parks ~ 9,220 MW capacity Intra-State transmission 21 solar parks ~ 10,780 MW capacity 18
Slide 19: Dynamic Compensation
Dynamic Compensation • Maintaining Grid Parameters • Hybrid STATCOMs 14 Nos. 400 – 600 MVAR • SVCs 4 Nos. 500 - 1000 MVAR 19
Slide 20: Renewable Energy Management Center
Renewable Energy Management Center REMC – Co-located with RLDC/SLDC – RE Forecasting & Scheduling – Real Time tracking of RE Generation 11 no. of REMC : 7 States + 3 Regions + 1 National level 20
Slide 21: SAARC Interconnections
SAARC Interconnections Geographically widely spread Indian Grid can facilitate interconnections with Neighboring countries India can provide a good demand market to harness energy resources of other countries Optimal utilization of energy resources 21
Slide 22: Sectoral Investment Envisaged (2017-2022)
Sectoral Investment Envisaged (2017-2022) Investment Envisaged: ~ ₹ 2,60,000 cr. (includes ₹ 30,000 crore for investments in Trans. Systems below 220kV levels) Physical Additions Planned: 106,000 ckm of Transmission lines 292,000 MVA Transformation Capacity 14,000 MW HVDC Bipole line Sou
Slide 23: 23
23
Slide 24: POWERGRID Today
POWERGRID Today >90% ISTS Transmission Network owned by POWERGRID POWERGRID’s Transmission Assets: Trans. Lines: 134,750 ckm 400kV & above: >90% Sub-stations: 217 Nos. - 280,362 MVA Availability: 99.76% (Apr16-Dec16) >45% power generated in India transmitted through POWERGRID POSOCO, P
Slide 25: Performance in FY17 (Q3 & 9 months): Transmission
formance in Fy7> °° (03 & 9 months) Transmission ONEe | 25
Slide 26: Performance- Financial (Q3 & 9mths FY17)
Performance- Financial (Q3 & 9mths FY17) (₹ in crore) Quarter ended Nine Months ended Description 31.12.2015 31.12.2016 % 31.12.2015 31.12.2016 % As per Ind AS As per Ind AS change As per Ind AS As per Ind AS change Revenue - Transmission Charges 5,153 6,336 23% 14,335 18,196 27% - Consultancy Incom
Slide 27: Performance – Financial (Q3 & 9mthsFY17)
Performance – Financial (Q3 & 9mthsFY17) (₹ in crore) As on 30.09.2016 As on 31.12.2016 As on 31.12.2015 As per Ind AS As per Ind AS As per Ind AS Gross Fixed Assets 1,58,937 1,65,757 1,44,795 Capital Work-in-Progress 46,335 45,991 46,000 Debt 1,12,284 1,15,924 1,05,387 Net Worth 46,391 48,290 42,59
Slide 28: Performance - Financial (Billing & Realization)
Performance - Financial (Billing & Realization) As on 31.12.2016 ~ ₹ 3,749 crore Total Outstanding (53 days billing#) Transmission Outstanding ~ ₹ 792 crore (beyond 60 days) (11 days billing#) Billed but not outstanding ~ ₹ 2,958 crore (<60 days allowed as per CERC) (42 days billing#) # Avg. Monthly
Slide 29: Performance: Projects- Q3 & 9mths FY17
Performance: Projects- Q3 & 9mths FY17 Chart Title Till Jan’17 Capitalization ~ ₹ 20,700 cr. (*) 2,462 6,688 6,820 15,970 (Commissioning) Capex 5,585 5,291 5,170 16,046 ~ ₹ 17,908 cr. (*) excluding Champa- Kurukshetra ±800kV HVDC Q1FY17 Q2FY17 Q3FY17 FY16 FY17 (Apr-Dec) (Apr-Dec) Investment Approval
Slide 30: Performance - Physical
Performance - Physical Apr-Dec16 Targeted for (9mths) Q4FY17 Tr. Line: Tr. Line: ~ 4,650 ckm ~ 4,750 ckm S/S: S/S: 7 Nos.; ~24,000 MVA 7 Nos.; 14,000 MVA Inter-Regional Capacity: Inter-Regional Capacity: 3,600MW 11,400MW 30
Slide 31: Performance- Operations: FY17 (till Dec-16)
Performance- Operations: FY17 (till Dec-16) 1062 Nos. Trans. Lines: ~ 134,000 ckm Assets (Dec’16) 214 Nos. Sub-stations: ~ 278,860 MVA Performance Availability: Reliability: (Apr-Dec’16) 99.76% 0.57* * Trippings per line 31
Slide 32: Performance (Q3FY17): Consultancy & Telecom
Performance (Q3FY17) consultancy & Telecon, ONEe | 32
Slide 33: Consultancy – Q3FY17
Consultancy – Q3FY17 Overall Consultancy Income ↑ 44% (over Q3FY16) Domestic: 8 Nos. (Project Cost: ~ ₹ 1300 crore) New Orders in Q3FY17 International: 3 Nos. (Project Cost: ~USD 3.3 mn) Domestic: 105 Nos. (~₹ 16,700 crore) Assignments in Hand (Dec’16) International: 17 Nos. 33 33
Slide 34: Telecom – Q3FY17
Telecom – Q3FY17 Increase in Income 26% w.r.t Q3FY16 Infrastructure: Fiber Optic Network : ~ 36,500km Points of Presence : 595 Backbone Availability : 100% Major Projects: National Knowledge Network (NKN): Project completed & Under Operation National Optic Fiber Backbone (NOFN): Work i
Slide 35: XII Plan Performance
Say Plan Performance
Slide 36: XII Plan Performance
XII Plan Performance Annual Capex Plan Planned Capital Outlay FY12-13: FY13-14: FY14-15: FY15-16: FY16-17: ₹ 110,000 ₹20,037 ₹23,158 ₹ 22,456 ₹ 22,584 ₹22,550 crore cr. cr. cr. cr. cr. (Achieved) (Achieved) (Achieved) (Achieved) [Achieved ₹ 17,908 cr.] ~ ₹ 106,143 crore achieved in XII Plan (Apr12 t
Slide 37: 37
37 37
Slide 38: POWERGRID Outlook (as on Dec’16)
POWERGRID Outlook (as on Dec’16) Ongoing Projects approx. ₹ 1,10,000 crore New Projects approx. ₹ 13,000 crore TBCB Projects approx. ₹ 16,000 crore (as per Empowered Committee Estimate) Total Works in Hand approx. ₹ 1,39,000 crore 38
Slide 39: Investment Potential
Investment Potential Inter-State: ₹ 8,697 crore - 7 projects Transmission (TBCB)- ₹ 14,000 crore under various stages of bidding Intra-State: ₹ 5,265 crore - 10 projects in 4 States Railways’ Target to achieve electrification of 90% tracks in next 5 years from current levels (<50%) Thrust of Railway
Slide 40: Thank You
Lpank Vfou