  1. Slide 1: Runruno Gold Project Annual General Meeting

    RUNRUNO GOLD PROJECT Annual General Meeting 16 JJune ne 2011

  2. Slide 2: Important Notice

    IMPORTANT NOTICE This presentation has been prepared by the management of Metals Exploration Plc and FCF Minerals Corporation for the benefit of the investing community including, brokers, fund managers, investors and analysts and not for the benefit of any particular person. The information is base

  3. Slide 3: Runruno Project Summary

    RUNRUNO PROJECT SUMMARY Title: Financial or Technical Assistance Agreement Status: Development ready, feasibility study - 2010 Mine life: 10.3 years Payable Production: 1,006,000 ozs Annual Production (ave.): 96,700 ozs (101,800ozs Au years 1-5 92 700 ozs Au years 6 92,700 6-10.3) 10 3) Capital Cost

  4. Slide 4: Regional Location

    “Project is well served by existing g infrastructure.” REGIONAL LOCATION Airfield – Bagabag airfield 5 kms north of Solano Solano Road – upgrade allowed along parts of the road. Currently passable all year. Bayombong Power supply – switch yard in Bayombong will be the origin for the new 69Kv line to

  5. Slide 5: Resources & Reserves

    RESOURCES & RESERVES March 2011 Resource & Reserve Statement Ore Gold Molybdenum Resource Category Mt g/t M Oz ppm M lbs Measured 11.2 1.88 0.68 604 14.9 Indicated 7.0 1.64 0.37 425 6.5 Inferred 7.5 7 5 1.44 1 44 0.35 0 35 253 4.2 4 2 Total 25.7 1.69 1.39 453 25.6 Ore Gold Molybdenum Reserve Categor

  6. Slide 6: Project Description

    PROJECT DESCRIPTION Five key components: • Mine Open Pit and Run of Mine (ROM) Pad; • Process Plant facility consisting of conventional crushing, grinding, flotation, along with BIOX® and gravity recovery; • Tailings Storage Facility (TSF): to ensure materials are properly managed and to reclaim wat

  7. Slide 7: Mine Pit

    MINE PIT • Open pit area - 600m x 1,500m • 1.75 1 75 Mtpa ore - transported by conveyor to the Process Plant. Plant • 9.1 Mtpa overburden - used for the construction of the Tailings Storage Facility and in-pit backfill. • During D i g the th first fi t three th years, waste t material t i l will ill

  8. Slide 8: Process Plant

    PROCESS PLANT  Ore contains free and refractory Gold  Pressure Oxidation, & BIOX® processes considered, and Molybdenite BIOX® offers:  Reduced capital intensity  Gold circuit demonstrated by  Lower operating costs extensive testwork including 20t pilot  Proven process plant  Ease of operation

  9. Slide 9: Molybdenum

    MOLYBDENUM Molybdenite occurs at Runruno as very fine 10-20 µm grains with pyrite and silicate minerals  Hydrometurgical H d t gi l MoM recovery circuit i it in i development d l t – Electrometals El t t l Laboratory L b t Queensland Q l d  Modular add-on to gold circuit  Mo solubilised in the BI

  10. Slide 10: Process Flow Diagram

    PROCESS FLOW DIAGRAM ADD-ON Mo RECOVERY CIRCUIT

  11. Slide 11: Tailings Storage Facility

    TAILINGS STORAGE FACILITY Tailing Storage Facility (TSF) • Storage of treated tailings in valley adjacent to the Process Plant. • 2 year starter embankment established using pit i pre-strip. i • Dam lifted to final height during initial 3 years of production. • Designed to national and international

  12. Slide 12: Water Supply

    WATER SUPPLY • Water usage will be effectively managed to minimise the amount of water drawn from local rivers and to maximise the water returned from the TSF. • Potable water will be sourced from the Lintungan River and this will be supplied to the Runruno Village and Process Plant. • Process water

  13. Slide 13: Off-Site Infrastructure

    OFF-SITE OFF SITE INFRASTRUCTURE Access Road • Improvement of the Quezon to Runruno Access Road. Power Supply • Estimated average power usage of 13MW. • Access to the power national grid and hydroelectric power stations. • Switch yard located at Bayombong. Bayombong • 36 km dedicated 69 kV Powerline

  14. Slide 14: Current Site Activities

    CURRENT SITE ACTIVITIES  Exploration  Land Acquisition and Small Scale Miners  Environment Management g  Safety and Health  Information, Communication and Education (ICE)  Community Relations and Development

  15. Slide 15: Exploration Model

    EXPLORATION MODEL Pierre Perroud Photograph by P Runruno – 1.5 Mozs Inferred, Indicated & Measured Cripple Creek – 23 Mozs historic production “In short, the Runruno gold deposit is remarkable in terms of its shared characteristics with other alkaline epithermal deposits, including Cripple Creek, Co

  16. Slide 16: FTAA Exploration

    “Systematic assessment FTAA EXPLORATION underway underway”  Gold-in-soil anomalies scattered tt d over th the sampled l d area – similar to Cripple Creek’s historic mines g  Aeromagnetics flown – interpretation in progress  Soil sampling ongoing, clear anomalies defined  Gold and copper targets

  17. Slide 17: FTAA Exploration

    FTAA EXPLORATION Bocboc Southern Extension Tullingan Pl Planned d IP S Survey Magnetite Creek

  18. Slide 18: Environmental Management

    ENVIRONMENTAL MANAGEMENT Rehabilitation • Slope Stabilization  soil filled bags  coco-matting Before  silt fencing • Revegetation  napier grass (endemic) After 6 months  vetiver grass (propagated) • Drainage Canal Maintenance After 2 months

  19. Slide 19: Environmental Monitoring: Water Quality Monitoring

    ENVIRONMENTAL MONITORING Water Quality Monitoring

  20. Slide 20: Environmental Monitoring: Stream Flow and Groundwater Discharge

    ENVIRONMENTAL MONITORING S Stream Flow Fl and dGGroundwater d Discharge Di h Monitoring M i i

  21. Slide 21: Environmental Monitoring: Air Quality and Ambient Noise

    ENVIRONMENTAL MONITORING Air Quality and Ambient Noise Monitoring

  22. Slide 22: Mining Forest Program

    MINING FOREST PROGRAM Reforestation program • Memorandum of Agreement with surface owner owner, FCF, FCF DENR, DENR NVSU • Reforested area: 43.03 hectares as of March 2011 • 2008, 2009 2008 2009, 2010: 1st Runner Up Best Mining Forest Program , PMEIA (Exploration Category) Tree Planting Activities

  23. Slide 23: Safety and Health

    SAFETY AND HEALTH Safety Statistics The Project maintained a Zero Non Lost Time Accident (NLTA). Safety induction is conducted to all new employees and visitors. Regular safety meetings discussions on safety concerns

  24. Slide 24: Information, Communication and Education (ICE)

    INFORMATION, INFORMATION COMMUNICATION AND EDUCATION (ICE) FCF performs Information, Communication and Education (ICE) campaigns  To shape desirable social opinion about the company and its current activities. activities  To provide social understanding of the mines and geosciences, encourage on t

  25. Slide 25: Information, Communication and Education (ICE)

    INFORMATION, INFORMATION COMMUNICATION AND EDUCATION (ICE)  C Community it Engagements E t  Trainings and Seminars  FCF Chronicle Bi-Monthly Publication

  26. Slide 26: Community Responsibility: Livelihood Projects

    COMMUNITY RESPONSIBILITY Livelihood Projects Runo Craft Banana Chip Making Junk Shop Hammock Making Soft Broom Making Basic Sewing Course

  27. Slide 27: Community Responsibility: Education

    COMMUNITY RESPONSIBILITY Education

  28. Slide 28: Community Responsibility: Basic Infrastructure Development

    COMMUNITY RESPONSIBILITY Basic Infrastructure Development p Hanging Bridge Daycare Center Community Clinic Waiting Shed Tire Path Irrigation Canal

  29. Slide 29: The Future - Construction

    fcf minerals THE FUTURE - CONSTRUCTION

  30. Slide 30: Simplified Corporate Structure

    SIMPLIFIED CORPORATE STRUCTURE METALS EXPLORATION PLC ((MEP)) 100% Foreign Owned- London Based FCF C Minerals C Corp.- 85% 8 MEP 15% CMI – optioned to MEP 100% Runruno Financial or Technical Assistance Agreement Capital Structure: Significant Shareholders:**  Ticker Symbol: LSE : MTL  Solomon Capi

  31. Slide 31: Construction Philosophy

    CONSTRUCTION PHILOSOPHY • Strong experienced owners team • GMP – EPC executioni philosophy hil h ffor hi highest h risk i k most technical h i l area – Process P Plant. Pl  Appoint an Engineer / Constructor with demonstrated performance.  Incentivise by sharing upside i.e. Cost savings. • Develop

  32. Slide 32: Timetable

    TIMETABLE Milestones Achievements Forthcoming Scoping Study  Completed in November 2008 - FTAA awarded for Runruno Project  November 2010 - Independent Resource verification  Completed in November 2009 - Environmental Compliance Certificate (ECC)  Granted in February 2010 - Feasibility Study  D

  33. Slide 33: fcf

    fcf minerals

  34. Slide 34: Thank You

    fcf minerals Thank You.

  35. Slide 35: Southern Extension - Line 100N

    SOUTHERN EXTENSION – LINE 100N

  36. Slide 36: Tullingan X-Section

    TULINGAN X-SECTION X SECTION

  37. Slide 37: Magnetite Creek X-Section

    MAGNETITE CREEK X-SECTION X SECTION