Group 6 Metals Limited · ASX:G6M

Group 6 Metals — Investor Presentation (November 2026)

25 slides from Group 6 Metals's investor presentation, Nov 25, 2026

  1. Slide 1: Investor presentation

    Slide 1: Investor presentation

    Investor presentation High-grade tungsten from a rebuilt Tasmanian operation, now moving to underground feed November 2026 Group 6 Metals Limited | ASX: G6M

  2. Slide 2: Important notice and disclaimer

    Slide 2: Important notice and disclaimer

    Important notice and disclaimer Summary information Financial information This presentation has been prepared by Group 6 Metals Limited (G6M or the Company) and contains summary All amounts are in Australian dollars unless stated otherwise. Figures are subject to rounding. Quarterly financial inform

  3. Slide 3: A profitable tungsten producer moving underground

    Slide 3: A profitable tungsten producer moving underground

    A profitable tungsten producer moving underground ASX-listed tungsten producer. Recapitalised in April 2025 9.43m MTU 4.07Mt @ 0.92% Company and reinstated to ASX quotation in July 2026. Contained WO₃ in Mineral Resource Ore Reserve WO₃ (3.73m MTU (10.55Mt at 0.89%) contained) 100%-owned Dolphin Tun

  4. Slide 4: Investment highlights

    Slide 4: Investment highlights

    Investment highlights Rare grade in a Western jurisdiction Rebuilt, not just re-priced High-grade underground under way Resource grade of 0.89% WO₃ ranks among the Debt converted to equity, 45 plant projects > 1.9km of development since the June 2026 highest outside China, with an operating plant, c

  5. Slide 5: Corporate snapshot and shareholder register

    Slide 5: Corporate snapshot and shareholder register

    Corporate snapshot and shareholder register Capital structure Top shareholders (% of issued capital) Strategically aligned register Item Value Christopher Ellis (Director) 25.5% • Recapitalisation in April 2025 Share price (18 Nov 2026) A$2.43 resulted in a highly concentrated register Elphinstone H

  6. Slide 6: A board with mining and turnaround depth

    Slide 6: A board with mining and turnaround depth

    A board with mining and turnaround depth Kevin Pallas Christopher Ellis Dale Elphinstone AO Executive Chair Non-Executive Director Non-Executive Director Former Managing Director and CEO of Engenco More than 35 years in mining. Founding Executive Founder and Executive Chairman of the (2015 to 2022),

  7. Slide 7: Dolphin: a long-lived orebody with a modern restart

    Slide 7: Dolphin: a long-lived orebody with a modern restart

    Dolphin: a long-lived orebody with a modern restart Location Infrastructure Tenure Grassy, south-east King Island. ~90km from north- Grassy port, haul roads, refurbished plant, tailings 100% owned. Mining Lease and Exploration Licence west Tasmania and ~240km SSW of Melbourne. storage facility and o

  8. Slide 8: What went wrong in 2023-24, and what has changed

    Slide 8: What went wrong in 2023-24, and what has changed

    What went wrong in 2023-24, and what has changed Area 2023 to 2024 Today Debt-funded restart; losses and leverage led to suspension of A$81m of debt and interest converted to equity. Net assets A$155.1m, cash Balance sheet operations A$54.1m, A$11.5m of debt repaid early 45 capital projects (~A$5m),

  9. Slide 9: Recapitalised in 2025 with cash growing every quarter

    Slide 9: Recapitalised in 2025 with cash growing every quarter

    Recapitalised in 2025 with cash growing every quarter April 2025 recapitalisation Cash at quarter end (A$m) 54.1 Debt and accrued interest converted to equity, lowering A$81m funding costs and restoring liquidity 49.3 New debt funding provided to the operating subsidiary to A$25m restart and remedia

  10. Slide 10: Throughput doubled and recovery up ~20 points

    Slide 10: Throughput doubled and recovery up ~20 points

    Throughput doubled and recovery up ~20 points Ore processed (kt) and recovery (%) WO₃ produced (k MTU) and feed grade (% WO₃) Ore processed (kt) Recovery (%) WO₃ produced (k MTU) Feed grade (% WO₃) 90 80 30 1.0% 80 0.9% 70 25 0.8% 70 60 0.7% 60 20 50 0.6% 50 40 15 0.5% 40 0.4% 30 30 10 0.3% 20 20 0.

  11. Slide 11: Plant overhauled, with debottlenecking projects defined

    Slide 11: Plant overhauled, with debottlenecking projects defined

    Plant overhauled, with debottlenecking projects defined Three-stage Coarse gravity: Cleaning and Scheelite concentrate ROM and stockpiles crushing and Grinding Fine gravity: MGS spirals and tables flotation >60% WO₃ screening Phases 1 and 2: plant reliability Crushing circuit extension Falcon concen

  12. Slide 12: > 1.9km developed underground since the June restart

    Slide 12: > 1.9km developed underground since the June restart

    > 1.9km developed underground since the June restart • Contractor: HMR Drilling Services, development and production (contract executed April 2026; ~A$110m to A$120m over an initial three years; rates fixed to June 2027) • Infrastructure: ventilation, compressed air, dewatering and temporary power e

  13. Slide 13: First C lens ore at 0.93% WO₃, nearly 2x prior grades

    Slide 13: First C lens ore at 0.93% WO₃, nearly 2x prior grades

    First C lens ore at 0.93% WO₃, nearly 2x prior grades Grade comparison (% WO₃) B lens Underground ore mined June to October, mostly from the B lens: 19,794t at Stockpile feed, Sep 2026 qtr 0.29% 0.48% WO₃, against a Mineral Resource grade of 0.89% WO₃. Underground ore, Jun to Oct 2026 0.48% Mineral

  14. Slide 14: FY27 is the transition year to underground feed

    Slide 14: FY27 is the transition year to underground feed

    FY27 is the transition year to underground feed FY27 mill feed by source (kt) and WO₃ production (MTU) Annual summary Stockpile (kt) Underground (kt) WO₃ produced (MTU) FY25 FY26 FY27F 100 25,000 Plant feed (kt) 175 272 322 90 Feed grade (% WO₃) 0.72% 0.57% 0.39% 80 20,000 70 WO₃ produced (MTU) 60,1

  15. Slide 15: September quarter delivered A$14.7m operating cash flow

    Slide 15: September quarter delivered A$14.7m operating cash flow

    September quarter delivered A$14.7m operating cash flow September 2026 quarter Cost base (A$) Cost item Period Basis Amount A$38.1m A$14.7m Customer receipts Operating cash flow Operating costs FY26 Actual A$54.1m Administration FY26 Actual A$5.2m Underground mining 14 months Forecast A$30.0m 81,098

  16. Slide 16: Plant and grade upgrades target >2x monthly output

    Slide 16: Plant and grade upgrades target >2x monthly output

    Plant and grade upgrades target >2x monthly output WO₃ production (MTU per month) Driver Current (1) Target 1 Target 2 Potential 0 to 18 12 to 24 Timing Actual 2+ years months months 23,652 Throughput (tph) 42.7 50 55 60 20,236 Utilisation 80% 85% 90% 90% Feed grade (% WO₃) (2) 0.50% 0.80% 0.80% 0.8

  17. Slide 17: 9.4m MTU resource, with reserves set at a fraction of today's prices

    Slide 17: 9.4m MTU resource, with reserves set at a fraction of today's prices

    9.4m MTU resource, with reserves set at a fraction of today's prices Mineral Resource, 30 June 2026 Stockpiles at 30 September 2026 Contained (m Deposit Tonnes (Mt) Grade (% WO₃) MTU) 207kt at 0.24% WO₃ Dolphin, Indicated 8.79 0.89 7.82 ~50k MTU contained. Low-grade feed blended with Bold Head, Indi

  18. Slide 18: Growth options: near-mine, Bold Head and processing

    Slide 18: Growth options: near-mine, Bold Head and processing

    Growth options: near-mine, Bold Head and processing # Target Rationale 2027 programme Budget Outcropping Grassy Group sediments 500m east 3 Bold Head East 1,500m to 2,000m ~A$0.5m of Bold Head; gravity low and magnetic ridge Gravity low and magnetic ridge similar to Dolphin; 4 Bold Head South ~1,000

  19. Slide 19: Tungsten is critical, and China mines ~80% of it

    Slide 19: Tungsten is critical, and China mines ~80% of it

    Tungsten is critical, and China mines ~80% of it Global tungsten consumption by first use Why it matters Carbide products 65% ~80% • Irreplaceable properties: highest melting point of any metal, extreme hardness and density of primary tungsten supply comes from • Broad industrial base: cemented carb

  20. Slide 20: Realised prices have followed Western APT higher

    Slide 20: Realised prices have followed Western APT higher

    Realised prices have followed Western APT higher APT price, Rotterdam versus China (US$/MTU) G6M realised concentrate prices APT Rotterdam (ex-China) APT China (EXW) US$950 US$1,936 3,500 FY26 average FY27 YTD average 3,108 (A$1,387/MTU) (A$2,781/MTU) 3,000 Offtake: Traxys Europe 2,679 • Extended Ma

  21. Slide 21: Key risks and how they are managed

    Slide 21: Key risks and how they are managed

    Key risks and how they are managed Risk What it means How it is managed Early underground grades (0.47% to 0.49% WO₃) compare with a Transition from B lens to C lens stopes; grade control drilling from late Underground grade Mineral Resource grade of 0.89% WO₃. The FY27 forecast assumes CY2026 highe

  22. Slide 22: Catalysts to track over the next 12 to 18 months

    Slide 22: Catalysts to track over the next 12 to 18 months

    Catalysts to track over the next 12 to 18 months Dec quarter 2026 1H CY2027 CY2027 Next 18 months FY28 and beyond Underground grade Policy and debt Exploration Plant upgrades Mine life and growth • Grade control drilling • Stricter US defence • Drilling at Bold Head • Additional tables • Bold Head a

  23. Slide 23: Investment summary

    Slide 23: Investment summary

    Investment summary ✓ Balance sheet reset: A$81m of debt converted with A$54.1m cash Rebuilt and funded ✓ Plant refurbished: record throughput, recovery ~60%, targeting >60% ✓ Four quarters of positive operating cash flow1 A rebuilt, funded Western tungsten producer at the start of ✓ Underground feed

  24. Slide 24: Appendix: quarterly operating history since restart

    Slide 24: Appendix: quarterly operating history since restart

    Appendix: quarterly operating history since restart Q1 FY24 Q2 FY24 Q3 FY24 Q4 FY24 Q1 FY25 Q2 FY25 Q3 FY25 Q4 FY25 Q1 FY26 Q2 FY26 Q3 FY26 Q4 FY26 Q1 FY27 Plant feed (t) 39,433 44,275 55,000 61,000 46,000 31,717 45,124 52,159 52,113 70,004 72,351 77,953 81,098 Feed grade (% WO₃) 0.29% 0.52% 0.56% 0

  25. Slide 25: For more information

    Slide 25: For more information

    For more information Kevin Pallas Executive Chair KPallas@g6m.com.au Group 6 Metals Limited | ASX: G6M | November 2026

Source: ASX announcement via 6ix News

More decks from Group 6 Metals Limited

All 17 Group 6 Metals decks