Galileo Resources Plc · LSE:GLR

Galileo Resources — Investor Presentation (May 2012)

21 slides from Galileo Resources's investor presentation, May 2012

  1. Slide 1: Glenover Rare Earth Project

    GLENOVER RARE EARTH PROJECT 1

  2. Slide 2: Disclaimer

    Disclaimer THIS DOCUMENT (“DOCUMENT”) IS STRICTLY CONFIDENTIAL AND IS BEING PROVIDED TO YOU SOLELY FOR YOUR INFORMATION. THE DISTRIBUTION OF THIS DOCUMENT MAY BE RESTRICTED BY LAW. ACCORDINGLY, THIS DOCUMENT MAY NOT BE DISTRIBUTED IN ANY JURISDICTION EXCEPT IN ACCORDANCE WITH THE LEGAL REQUIREMENTS

  3. Slide 3: Location Of Project

    Project located next to tarred road – Good infrastructure Location Of Project Botswana 3

  4. Slide 4: Aerial photograph of old pit

    Big former pit – easy access to new ore Aerial photograph of old pit Mine Area and Apatite-Haematite Breccia Ore Stockpiles Ore Stockpiles 0 50 100 200 Metres Ore Stockpiles 1.34 million m3 2.0-2.5 million tonnes 4

  5. Slide 5: Glenover history

    Change of owner – Change of mission Glenover history Location • Glenover 371 LQ, Ouhoek 345 LQ, Houndslow 372 LQ, Elfrida 378 LQ, Eldorado 370 LQ and Rosevalley 369 LQ • 80 km NNW of Thabazimbi and 60 km WSW of Lephalale in Limpopo Province History • 1953 – Dr H N Visser (Geological Survey) • 1955 –

  6. Slide 6: Mission Statement

    Galileo is focused Mission Statement  To in-fill drill around old phosphate pit to establish SAMREC tonnage for primary extraction  To independently establish tonnes and grade for old phosphate stock piles  To carry out mineralogical and metallurgical test work to optimise rare earth oxide proces

  7. Slide 7: Glenover Rare Earth Project

    Established site Glenover Rare Earth Project Available process equipment Phosphate open pit Recent drilling Open pit stockpiles 7

  8. Slide 8: Glenover Carbonatite Geology

    Southern Africa’s second biggest carbonatite Glenover Carbonatite Geology Pit Area Pit AreaGeology Carbonatite Geology Carbonatised Pyroxenite Coarse-grained Pyroxenite CarbonatiteFine-grained Pyroxenite Fenitised Quartzite Carbonatised Pyroxenite Coarse-grained Pyroxenite Fine-grained Pyroxenite Fe

  9. Slide 9: Glenover Completed Drill Programme

    Fast track drilling programme Glenover Completed Drill Programme GHV016 GHV008 GHV010 GHV011 GHV009 GHV015 GHV014 GHV012 GHV019 GHV021 GHV005 GHV006 GHV007 Status GHV003 GHV004 Assays Reported GHV017 GHV020 Awaiting Assays GHV018 Borehole Trace Pit Geology GHV001 Apatite Breccia GHV002 Carbonatised

  10. Slide 10: 3D model of ore body

    We have a good understanding of our subject 3D model of ore body ~ 250 m peripheral zone of N drilling ~ 160 m ~ 215 m Apatite Breccia Borehole trace Carbonatite10

  11. Slide 11: Independent resource statement

    Significant tonnage accessible from current open pit Independent resource statement %TREO Rock Type Resource Tonnage + Y2O3 P2 O 5 Nb2O5 Sc2O3 x 1,000 Class Tonnes (%) (%) (%) ppm Measured 0 0 0 0 0 Indicated 7.407 2.2 17.57 0.47 179.5 Apatite-Haematite Breccia Total Measured & Indicated 7.407 2.2 1

  12. Slide 12: High Grade Shoots

    A bulk target with significant high grade shoots High Grade Shoots Significant high grade shoots Borehole Borehole TREO TREO ID ID GVH m % GVH m % 1 17.3 4.4 11 2.2 3.58 4 7.8 8.03 15 3.4 5.08 5 15.7 3.37 16 6 3.95 6 5.7 6.63 17 2.5 4.7 7 7.3 3.49 20 6.8 2.38 10 26.7 4.01 21 15.7 2.69 12

  13. Slide 13: Borehole Core Lithology Log

    Apatite is very significant Borehole Core Lithology Log GRADE CUT FROM (m) TO (m) WIDTH (m) P2O5 % TREO % > 1% LREO 25.22 181.26 156.04 23.61 2.77 Including 38.5 41.5 3 27.33 3.38 Including 93.38 99.16 5.78 22.15 4.31 Including 102.65 114.06 11.41 25.41 6.03 Including 125.92 139.35 13.43 23.87 3.97

  14. Slide 14: Borehole Core Lithology Log

    But so is carbonatite Borehole Core Lithology Log GRADE CUT FROM (m) TO (m) Width (m) TREO % P2O5 % > 1% LREO 22.92 26.36 3.44 1.71 2.58 > 1% LREO 27.42 29.19 1.77 3.30 0.99 > 1% LREO 34.68 37.15 2.47 1.32 1.97 > 1% LREO 40.44 62.44 22 3.12 11.79 > 1% LREO 60.1 65.8 5.7 6.33 16.61 > 1% LREO 125.77 1

  15. Slide 15: Niobium (Nb2O5)

    Niobium significant by-product. Stand alone grades? Niobium (Nb2O5) Hole Entire core Nb2O5 High Grade Nb2O5 GHV metres %* metres %* 1 243 0.5 17 1.02 2 194 0.11 2 0.47 3 133 0.43 52 0.85 4 100 0.18 8 0.74 5 163 0.62 91 0.93 16 1.24 6 142 0.26 20 0.66 9 0.99 * Weighted averages over total sampled wid

  16. Slide 16: Platinum and Gold equivalents

    Valuable rock when you make comparisons Platinum and Gold equivalents Based on recent prices Resource In situ In situ gross Platinum Gold grade metal value equivalent equivalent g/t % REO * $/t ** g/t *** *** Indicated 2.2 1100 21 21 Indicated + inferred 1.64 820 15 15 * Basis Galileo resiurce estim

  17. Slide 17: REO Distribution

    Good split of desired rare earth Oxides REO Distribution LREOs 97% Light rare earth oxides La, 17% Pr, 6% HREOs >0.5% dist’n Nd, 22% Sm, 3% heavy rare earth oxides Y, 2% Dy, 0.6% Eu, 1% HREOs;3% Gd, 1.8% Ce, 46% 17

  18. Slide 18: Glenover New Exploration Drilling

    Bold step outs being drilled against geophysics Glenover New Exploration Drilling Open pit area Exploration Drilling Current Pit Area Magnetic Dykes Later Dykes Thorium Anomaly Demagnetised Zones Magnetic Pyroxenite Outline of Carbonatite 0 1 000 2 000 Quartzite Meters * Weighted averages over total

  19. Slide 19: Programme

    Results good, economic assessment in progress Programme  Mineralogical & metallurgical test work  Pit expansion mine design  Design flow sheet for rare earth oxide concentrate processing  Preliminary economic assessment  Explore entire deposit to increase rare earth ore resource 19

  20. Slide 20: Compelling Investment Case

    Well balanced with above average rare earth project Compelling Investment Case  Quality, near cash flow, strategic position  Glenover rare earth project well positioned against peers since close to production  Good local partners  Strong international trade interest  Mining cost lower since at

  21. Slide 21: Thank you very much

    Thank you very much www.galileoresources.com 21

Galileo Resources — Investor Presentation (May 2012) on 6ix