Admiralty Resources NL · ASX:ADY
Admiralty Resources NL — Investor Presentation (February 2009)
15 slides from Admiralty Resources NL's investor presentation, February 2009
Slide 1: Admiralty Resources NL Presentation
Admiralty Resources NL PRESENTATION February 2009
Slide 2: Company Overview
Company Overview ASX:ADY OTCBB:ARYRY (see www.adrbny.com) 1,133,457,841 shares on issue (at 31 January 2009) 1,000,000 Directors’ options (at 31 January 2009) 222 million held by the top 20 shareholders 19.60% (at 31 January 2009) Admiralty Resources NL 11,467 shareholders, 494 overseas (at 31 Janua
Slide 3: Key Personnel
Key Personnel Board of Directors Prof. J Ross Harper CBE – LLB MA DUniv Chairman, legal background, London John Anderson – B Com MBA Executive Director - banking, mining management – Melbourne Michael Robert Clarke MSc – Managing Director Inversiones Admiralty Resources Chile Ltda., Chairman of Vall
Slide 4: Project Overview – Production, Shipping, Focus
Project Overview – Production, Shipping, Focus Vallenar Iron Company (formerly Cia Minera Santa Bárbara) April 2007 – first shipment in WISCO 08 Sales agreement shipped Nov 2007 – 30,000 tonnes per month final product, 500 hours per month, six shipments completed – 300,000 tonnes final product shipp
Slide 5: Key Statistics – Santa Bárbara
Key Statistics – Santa Bárbara Caleta Port • 7,421 hectares of tenements at Japonesa Group Mine Vallenar • 3,500 hectares at Pampa Tololo, near Los Colorados • 11:1 ratio production of product grading at 9.0% • Three 1960’s stockpiles with 3 million tonnes fines • 8 geologists, topographers, mining
Slide 6: 12,000 Hectares in Iron Ore Belt
12,000 Hectares in Iron Ore Belt JAPONESA Ha MARIPOSA Ha CHILLAN VIEJO Ha Group of Mines 1,951 Group of Mines 3,321 Group of Mines 975 1Japonesa 1-8 34 Leo Cinco 1-40 300 Leo Uno 1-2 20 1Japonesita 1-16 96 Leo Seis 1-60 300 Paco 1-2 14 Phil 3 Daniela 1-20 21 Tina 1-26 181 1Gibaiju 1-9 41 Daniela 2*
Slide 7: Product Specification
Product Specification Element Typical Level % Annual shipping Capacity Fe 63.5 2009 (from April 2009 onwards) Si02 5.00 Port T - Caldera – 1 x 200,000 x 9 months = 1.8 million tonnes Al203 1.2 P 0.07 2010 Port T – Caldera – 1 x 200,000 x 12 months = 2.4 S 0.01 million tonnes Ca0 1.0 Mg0 1.1 2011 Pun
Slide 8: Vallenar Iron Tenements
Vallenar Iron Tenements Groups of Mines Chillán Viejo Japonesa Mirador Mariposa La Negra Soberana 8
Slide 9: Resource Estimates – Vallenar Iron Company
Resource Estimates – Vallenar Iron Company 194.1 Million Tonnes Measured, Indicated and Inferred Mine Tonnage Weighted Average Grade COMPETENT PERSON STATEMENT Japonesa Measured: 26.2 million 13.78% (at 9% cut-off grade) Indicated: 13.4 million 13.78% (at 9% cut-off grade) The information in this pr
Slide 10: Vallenar Iron Company’s Iron Ore Production
Vallenar Iron Company’s Iron Ore Production Port T at Caldera (negotiations pending) 18 tonne trucks taking ore to crusher Waste stockpiles Iron ore greater than 100m ready for crushing Two 125 hour primary crushers Stevedore team at the port 10
Slide 11: Caleta, Caldera Port
Caleta, Caldera Port Caleta Pier - handymax Hopper ship loading Final product being loaded for truck transport to Caleta 230km away 11
Slide 12: Port of Punta Alcalde
Port of Punta Alcalde Estimated Cost – US$32-$40m Main road to pass site 14km road upgrade Conveyor transport system 300,000 tonne stockpile Container loading facility – Fruit Port Iron ore loading – Santa Bárbara Coal unloading – Power Project Estimated Completion date Dec 2011 subject to funding 1
Slide 13: Bulman – Northern Territory
Bulman – Northern Territory Zinc and Lead oxide, sulphide deposit located in southern Arnhem land in Australia's Northern Territory. ELA23814 – 250 sq kilometres In the 1950’s CRA estimated there was substantial zinc sulphides from 11 drill holes. Area extensively covered by geophysics surveys and s
Slide 14: Bulman Exploration Licences
Bulman Exploration Licences Proposed drill holes (red dots), K-Th-U (Red-Green-Blue) image, highlighting potassium anomalies (pink). 14
Slide 15: Pyke Hill – Nickel Cobalt JV – Cougar Metals NL
Pyke Hill – Nickel Cobalt JV – Cougar Metals NL The Pyke Hill Project is located approximately 40km southeast of the Murrin Murrin Nickel Operation, near Leonora, Western Australia. Prospective for a high-grade nickel-cobalt lateritic resource. Estimated in-ground value $3.1b. Aircore drilling under
Admiralty Resources NL — Investor Presentation (February 2009) on 6ix