Ramelius Resources Limited · ASX:RMS
Ramelius Resources — Noosa Mining Conference 2026
22 slides from Ramelius Resources's conference presentation, Jul 22, 2026
Slide 1: Noosa Mining Conference
JULY 2026 Noosa Mining Conference
Slide 2: Qualifications & Non-IFRS financial information
Qualifications & Non-IFRS financial information Forward Looking Statements This presentation contains certain forward-looking statements with respect to Ramelius Resources Ltd’s (ASX: RMS) (Ramelius or the Company) financial condition, results of operations, production targets and other matters that
Slide 3: Corporate overview
Corporate overview Corporate Profile Capital Structure Board of Directors Market Cap1 A$ 5.5B Bob Vassie Non-Executive Chair Cash & Gold2 OUR VISION A$ 650M Mark Zeptner Managing Director David Southam Non-Executive Director Listed investments2 A$ 93M To be a sustainable gold Fiona Murdoch Non-Execu
Slide 4: The arrival of Dalgaranga...
The arrival of Dalgaranga... Gold Production Profile by Quarter (Oz) 55,013 Oz 53,466 Oz 45,610 Oz e = Mt Magnet Mt Magnet Sep 25 Qtr Dec 25 Qtr Mar 26 Qtr Jun 26 Qtr LEINSTER LAVERTON LEONORA REBECCA KALGOORLIE OL) BULLFINCH LARUE! WESTONIA SOUTHERN CROSS NAREMBEEN PERTH BUNBURY ESPERANCE ALBANY [I
Slide 5: 5-Year Outlook (base case) | 525koz p.a. by FY30
5-Year Outlook (base case) | 525koz p.a. by FY30 1 5-Year and long-term Group production profile & AISC2,3 170% production growth FY26-30 driven by Dalgaranga and Rebecca-Roe ~ 525koz p.a. long term gold production rate with 7.5Mtpa total mill capacity; • Mt Magnet – 4.3Mtpa • Rebecca-Roe – 3.25Mtpa
Slide 6: Shareholder returns | “maintain, then grow”
Shareholder returns | “maintain, then grow” Interim Dividend (H1 FY26) Shareholder returns | (A$M) • Fully franked at 3 cents per share (A$57.7M) • Paid 15 April 2026 • Exceeds the minimum dividend of 2 cents per share annual commitment for FY26 Share buybacks • A$250M share buyback program was anno
Slide 7: Project Update
Project Update
Slide 8: Dalgaranga | outstanding site project progress
Dalgaranga | outstanding site project progress Paste plant construction Underground pump station Surface workshop 88
Slide 9: Mt Magnet | processing plant update to 4.3Mtpa
Mt Magnet | processing plant update to 4.3Mtpa Early works • Haul road works complete allowing accelerated haulage rates from Dalgaranga, road sealing planned for FY27 • Mt Magnet camp expansion - installation progressing (additional 236 rooms) Existing circuit (1) - 1.9Mtpa reduce to 1.3Mtpa • Ball
Slide 10: Mt Magnet | powered by hybrid energy
Mt Magnet | powered by hybrid energy Hybrid power plant capacity Total hybrid power plant up to 46MW, low-emission energy with baseload piped gas Solar and battery installed 6.7MW solar power and 8.3MW battery storage Wind farm construction Foundations completed for 2 x 7MW wind turbines Hybrid ener
Slide 11: Exceptional Exploration Upside
Exceptional Exploration Upside 11
Slide 12: Mt Magnet | exploration success leads to production upside
Mt Magnet | exploration success leads to production upside Mt Magnet 5-year production profile (koz) & low-grade Opportunities to displace low-grade 1 Penny: extensions to Penny West to the south o FY26 exploration spend of A$7.0M o Mine plan to extend into FY27 2 Break of Day & Lena (Cue): undergro
Slide 13: Cue | Break of Day extensions and Lena underground potential
Cue | Break of Day extensions and Lena underground potential Recent results1 include: Lena ➢ 19.7m at 5.73g/t ➢ 9.0m at 12.9g/t Break of Day ➢ 4.0m at 4.01g/t Lena conceptual design adds significant mine life to the Break of Day underground project NOTES 1 See RMS ASX “Exploration Update – High-Grad
Slide 14: Cue | Break of Day extensions and Lena underground potential
Cue | Break of Day extensions and Lena underground potential Current Mineral Resources: Break of Day Underground ➢ 250Kt at 8.9g/t for 72koz1 Lena Underground: ➢ 910Kt at 3.6g/t for 110koz1 FY27 drill plan Continue surface drilling for conversion of Lena underground Inferred Mineral Resources to pro
Slide 15: Galaxy | extending mine life by accelerated exploration
Galaxy | extending mine life by accelerated exploration Recent results include1: ➢ 20.2m at 40.7g/t ➢ 10.5m at 3.16g/t ➢ 8.0m at 4.42g/t ➢ 12.0m at 3.38g/t ➢ 11.3m at 2.43g/t Current Mineral Resources: ➢ 6.2Mt at 2.7g/t for 530koz2 Exploration Target: ➢ 6.0 - 7.0Mt at 2.1 - 2.6g/t for 400 - 600koz3
Slide 16: Franks Tower | high grade in the Eridanus corridor
Franks Tower | high grade in the Eridanus corridor Recent results1 include: ➢ 3.6m at 113g/t ➢ 14.8m at 54.6g/t ➢ 3.8m at 5.01g/t ➢ 8.7m at 2.43g/t Recent drill results demonstrate Eridanus style mineralisation and high-grades up to 250m below surface Franks Tower Current Mineral Resources: ➢ 2.9Mt
Slide 17: Gilbey’s Underground | new underground mine potential
Gilbey’s Underground | new underground mine potential Underground diamond drilling results1: Gilbey’s underground: ➢ 1.6m at 130g/t ➢ 3.7m at 38.2g/t ➢ 3.7m at 16.6g/t ➢ 12.9m at 8.70g/t ➢ 16.6m at 6.01g/t Current Gilbey’s Underground Mineral Resources: ➢ 6.9Mt at 1.9 g/t for 380koz2,4 Exploration T
Slide 18: Rebecca–Roe | underground potential at Duke
Rebecca–Roe | underground potential at Duke New results1 at Duke include: ➢ 23.9m at 3.23g/t ➢ 23.8m at 1.62g/t ➢ 17.5m at 1.49g/t Underground potential being tested at Rebecca, Duke and Duchess NOTES 1 See RMS ASX “Exploration Update – High-Grade Strategy & Discovery”, 22 July 2026 18
Slide 19: Ramelius’ investment case
Ramelius’ investment case Reliable operational Sector leading cash flows team High margin / free cash flow Stand-out in sector for focused business with long delivery of Guidance life assets (Mt Magnet & Rebecca-Roe) Dividend yield above 170% production mid-tier ASX gold growth producers Pathway to
Slide 20: Thank you
Thank you RAMELIUS RESOURCES LIMITED | ASX: RMS Level 13, 58 Mounts Bay Road, Perth WA 6000 Authorised for release to the ASX by the Managing Director INVESTOR ENQUIRIES Mark Zeptner Managing Director Ramelius Resources Limited Ph: +61 8 9202 1127 Brian Massey General Manager Investor Relations Rame
Slide 21: Mineral Resources
Mineral Resources Mineral Resources (Summary) MINERAL RESOURCES AS AT 30 JUNE 2025 - INCLUSIVE OF RESERVES Measured Indicated Inferred Total Resource Project Deposit t g/t oz t g/t oz t g/t oz t g/t oz Open Pit deposits 2,200,000 1.6 110,000 36,000,000 1.5 1,700,000 20,000,000 1.2 780,000 59,000,000
Slide 22: Ore Reserves
Ore Reserves Ore Reserves (Summary) UPDATED ORE RESERVE STATEMENT AS AT 30 JUNE 2025 Project Mine Prov en Probable Total Reserv e t g/t oz t g/t oz t g/t oz Total Open Pit 20,000,000 1.2 780,000 20,000,000 1.2 780,000 Total Underground 3,200,000 2.4 250,000 3,200,000 2.4 250,000 Mt Magnet ROM & LG s