Slide 1: Dartbrook Mine Community Consultative Committee
CONFIDENTIAL DARTBROOK MINE Community Consultative Committee 21 March 2018

Slide 2: Agenda
CONFIDENTIAL Agenda • Introductions • The Proponent • Environmental Context • Significance of the Resource to NSW • Approved Underground Operations • Proposed Underground Modification • Scope of Environmental Assessment • Stakeholder Engagement • Timeline • Progression of Low Impact Surface Mining S

Slide 3: Introductions
CONFIDENTIAL Introductions Andrew Roach – CFO & Company Secretary, (AQC) James Bailey – Director, Hansen Bailey Dorian Walsh – Site Environmental Representative

Slide 4: The Proponent
CONFIDENTIAL The Proponent • Australian Pacific Coal (AQC) is an Australian owned company listed on the ASX • AQC owns several coal assets in Queensland and NSW • In May 2017, AQC acquired Dartbrook Mine from Anglo American and Marubeni • Dartbrook Mine is managed in accordance with DA 231-7-2000 wh

Slide 5: Environmental Context
CONFIDENTIAL Environmental Context • Located approximately 4.5km north of Muswellbrook and 1.1km south of Aberdeen • Located within Muswellbrook and Upper Hunter LGAs • Located adjacent Mt Pleasant Mine and West Muswellbrook Project Area

Slide 6: Significance of the Resource
CONFIDENTIAL Significance of the Resource • Dartbrook is a Tier 1 coal asset • JORC Resource estimate completed in June 2017 for AQC’s mining authorisations: Measured Indicated Inferred Total Mining Leases 533 637 665 1,834 Exploration Licences 55 213 432 700 Total 588 850 1,097 2,534

Slide 7: Coal Quality
CONFIDENTIAL Coal Quality • Coal quality is typical of Hunter Valley coal producers • Two high energy coal products: ‒ “Premium” thermal coal (~12% ash) ‒ “Standard” thermal Coal (~19% ash) • Both “Premium” and “Standard” thermal coal are suitable for HELE power stations • Opportunistic supply of th

Slide 8: Approved Underground Operations
CONFIDENTIAL Approved Underground Operations • Development Consent DA 231-7-2000 permits: – Extraction of up to 6 Mtpa of ROM coal until 5 December 2022 – Longwall mining activities in the Wynn, Kayuga, Mt Arthur and Piercefield coal seams – Transfer of ROM coal to the CHPP via the Hunter Tunnel (un

Slide 9: Proposed Underground Modification
CONFIDENTIAL Proposed Underground Modification • Modification 7 (MOD7) will facilitate the re-commencement of mining operations at Dartbrook Mine • Proposed mining activities: – Extraction of approximately 10 Mt of ROM coal (at av. 1 Mtpa) via bord and pillar mining within the Approved Mining Area o

Slide 10: Proposed Underground Modification
CONFIDENTIAL Proposed Underground Modification • Proposed Bord and Pillar Mining Area (Kayuga Seam)

Slide 11: Proposed Underground Modification
CONFIDENTIAL Proposed Underground Modification • Change to coal clearance system: – Haulage of ROM coal from Kayuga Entry to new shaft via private roads – Shaft will transfer coal via Hunter Tunnel to CHPP ROM pad

Slide 12: Proposed Underground Modification
CONFIDENTIAL Proposed Underground Modification • New shaft and coal bin will be enclosed to reduce dust and noise • The truck turning bay will be sealed to minimise dust

Slide 13: Scope of Environmental Assessment
CONFIDENTIAL Scope of Environmental Assessment 1. Background; 2. Existing Environment; 3. Approved Operations; 4. Modification Description (including a discussion of the alternatives considered); 5. Regulatory Framework; 6. Stakeholder Consultation: • Consultations with relevant State government age

Slide 14: Scope of Environmental Assessment
CONFIDENTIAL Scope of Environmental Assessment 7. Risk Assessment; 8. Environmental Impact Studies: • Air Quality • Noise • Ecology • Aboriginal Heritage • Subsidence • Water • Other minor environmental aspects (e.g. traffic, visual, agriculture) 9. Summary of measures to manage and mitigate environ

Slide 15: Proposed Stakeholder Engagement Strategy
CONFIDENTIAL Proposed Stakeholder Engagement Strategy • AQC proposes to undertake best practice stakeholder consultation consistent with new SIA and other guidelines • Consultation with NSW, Commonwealth and local government agencies • Community consultation: ‒ Community newsletters (five since July

Slide 16: Proposed Timing
CONFIDENTIAL Proposed Timing Milestone Date Lodged application for Section 75W Modification 27 February 2018 DP&E Acknowledged Acceptance of 75W Application 6 March 2018 Submit Environmental Assessment May 2018 Public Exhibition June 2018 Response to Submissions June 2018 Determination Anticipated J

Slide 17: Questions?
CONFIDENTIAL Coal Questions?

Slide 18: Progression of Low Impact Surface Mining Studies
CONFIDENTIAL Progression of Low Impact Surface Mining Studies • PFS Completed & under assessment • Extensive background environmental assessments underway • Application for exploration drilling submitted to DRG • Gateway Application under preparation

Slide 19: Questions?
CONFIDENTIAL Coal Questions?
Source: Internet Archive copy of aqcltd.com
More decks from Australian Pacific Coal Limited
Shareholder Meeting (November 2024)12 slides · Nov 29, 2024
Noosa Mining Conference 202413 slides · Nov 15, 2024
Investor Presentation (October 2024)35 slides · Oct 2, 2024
2024 Gold Coast Investment Showcase17 slides · Aug 29, 2024
2024 Gold Coast Investment Showcase16 slides · Jun 19, 2024
Austmine CEO Leadership Luncheon Series (June 2024)16 slides · Jun 13, 2024