GasLog Partners LP · NYSE:GLOP/PA
GasLog Partners LP — GasLog Ltd. and GasLog Partners — Investor Day (June 2016)
77 slides from GasLog Partners LP's investor day presentation, Jun 20, 2016

Slide 1: GasLog Ltd. and GasLog Partners LP Investor Event
GasLog Ltd. And GasLog Partners LP Investor Event 20 June 2016 Not For Redistribution

Slide 2: Forward Looking Statements
2 Forward Looking Statements All statements in this presentation that are not statements of historical fact are “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Forward-looking statements include statements that address activities, events

Slide 3: GasLog: Strategy Update
GASLOG: STRATEGY UPDATE Paul Wogan, CEO GasLog Ltd.

Slide 4: A Differentiated LNG Shipping Offering
4 A Differentiated LNG Shipping Offering 1 Executing On Our Strategy 2 Balance Sheet Strength To Manage Sector Cyclicality 3 Access To Diverse Sources Of Cost-Effective Capital 4 Majority Of Fleet Contracted With World Leading Counterparty Shell(1) 5 GLOG Dividend / GLOP Distribution Maintained – At

Slide 5: GasLog Has Adapted To Challenging Markets
5 GasLog Has Adapted To Challenging Markets Opted Not To Pursue Global Energy Market Downturn “GasLog 40:17” At Any Cost Limited Financing For Unfunded Capex $1.3 Billion Newbuild Financing Sale & Leaseback With Mitsui: Traditional Capital Markets Unpredictable Further Japanese Opportunities Five Ve

Slide 6: GasLog's Action Plan
6 GasLog’s Action Plan 1 Deliver Significant Inbuilt EBITDA Growth 2 Grow Our Market Share In LNG Carriers Through 2020 3 Two Active FSRU Projects By End 2016 4 Increase GasLog’s Contracted Revenue 5 Support GasLog Partners As Our Preferred Funding Vehicle 6 Create Liquidity For Future Growth

Slide 7: Gas: An Attractive Fuel For The Future
GASLOG SALEM HAMILTON ae icles as GAS: AN ATTRACTIVE FUEL FOR THE FUTURE Paul Wogan

Slide 8: Gas: A Growing Fuel In The Global Energy Mix
8 Gas: A Growing Fuel In The Global Energy Mix Gas And LNG Are Growing Market Share In The Global Primary Energy Mix 50% 35% Today Today Gas expected to 30% 40% overtake coal as a % of the overall Share of Primary Energy Trade as Share of Global Consumption 25% global energy mix 30% 20% 15% 20% 10%

Slide 9: Rising Oil And Low Gas Prices Positive For LNG Demand
9 Rising Oil And Low Gas Prices Positive For LNG Demand Commodity Spot Price Forecasts 20 120.0 100.0 16 Oil price recovery already taking place and expected to continue 80.0 12 $/barrel $/mmbtu 60.0 8 40.0 4 20.0 Henry Hub expected to stay flat 0 - 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Slide 10: We Maintain A Conservative Supply Outlook To 2020
10 We Maintain A Conservative Supply Outlook To 2020 Expected(1) RoW Nameplate Status Expected(1) Australia Nameplate Status Yamal 16.5 mtpa 2018-20 Gladstone 7.7 mtpa Started Malaysia 4.0 mtpa 2016-20 Australia Pacific 9.0 mtpa Started Cameroon 2.2 mtpa 2018 Gorgon 15.6 mtpa Started Total 22.7 mtpa

Slide 11: One New Liquefaction Train Every Two Months
11 One New Liquefaction Train Every Two Months New LNG Supply By Project Start Date 6 140 = Operational 120 100 Million tonnes per annum 4 Million tonnes per annum 80 60 2 40 20 0 0 Australia Pacific T1 Australia Pacific T2 Gladstone Sabine Pass T1 Gorgon Malaysia LNG T9 Petronas FLNG 1

Slide 12: Significant New And Existing LNG Demand
12 Significant New And Existing LNG Demand Global LNG Demand 400 140 120 Million tonnes per annum Million tonnes per annum 300 100 80 200 60 40 100 20 0 0 2015 2016 2017 2018 2019 2020 Asia Pacific Europe Americas Middle East North Africa Cumulative Demand (right hand axis) A number of factors dri

Slide 13: FSRUs To Open Up New Markets
13 FSRUs To Open Up New Markets UK KALININGRAD LITHUANIA P Meridian-buoy Gazprom Klaipeda (Hoegh) UKRAINE Odessa USA ITALY CROATIA TURKEY NE Gateway-buoys (Excelerate) Livorno (OLT) Triton CHINA GREECE KUWAIT Tianjin (Hoegh) Falconara Alexandroupolis Ahmadi (Golar) PAKISTAN Crete LEBANON Port Kasim

Slide 14: New Re-Gasification Infrastructure Expanding To Meet Demand
New Re-Gasification Infrastructure Expanding To Meet 14 Major Growth In LNG Demand Global Re-Gasification Capacity 1,000 Million tonnes per annum 800 600 400 200 0 2015 2016 2017 2018 2019 2020 Asia Pacific Europe North America South America Middle East & Africa Significant spare re-gasification c

Slide 15: LNG Shipping: A Long-Term Strategy
_-* LNG SHIPPING: -* , _ ALONG-TERM STRATEGY Paul Wogan

Slide 16: GasLog's Strategy Is Long-Term Contracts
16 GasLog’s Strategy Is Long-Term Contracts 23 of GasLog’s fleet of 27 vessels (on-the-water and on order) are on time charter ‒ Average charter length of ~6 years ‒ $3.6bn of fixed-rate, long-term contracted revenue ‒ Additional ~$4bn of fixed rate option revenue (at the charterer’s option) ‒ 3 v

Slide 17: New Vessel Orders At Multi-Year Low
17 New Vessel Orders At Multi-Year Low LNG Carrier New Orders Placed 80 66 60 54 Only Six New LNG Number of orders Carrier Orders 40 Sept 15 – Present 40 28 20 21 6 0 2011 2012 2013 2014 2015 2016 YTD Only six new orders placed in the last 9 months – all done by established LNG shipping players

Slide 18: Market Expected To Gradually Tighten Through 2016-18
18 Market Expected To Gradually Tighten Through 2016-18 Cumulative Incremental Shipping Balance Per Quarter 2016 – 2018(1) 120 12% Number of Vessels (Normalized to 160k cbm) 100 50% reduction between 10% Q216 and Q317 80 8% % Global Fleet 60 6% 40 4% 20 2% 0 0% Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2016

Slide 19: Spot Vessel Availability Down 59% Since Sept 2015
19 Spot Vessel Availability Down 59% Since Sept 2015 Number Of Vessels Available In The Spot Market(1) 45 Available vessels fallen from 44 in Sep 2015 to 18 at present (-59%) 35 Spot Vessel Availability 25 15 Sep-2015 Oct-2015 Nov-2015 Dec-2015 Jan-2016 Feb-2016 Mar-2016 Apr-2016 May-2016 Jun-2016 T

Slide 20: Creating Innovative Solutions For Our Customers
20 Creating Innovative Solutions For Our Customers 16 Vessels Under Commercial Control Charterer Growing spot LNG volumes provide sufficient liquidity for the formation of an LNG pool Jan-Jun 2016: total of ~112 spot fixtures (compared to 72 fixtures for Jan-Jun 2015)(1) The Cool Pool has done

Slide 21: The Strategic Landscape: GasLog's View
21 The Strategic Landscape: GasLog’s View LNG Shipping Market Structurally Short Ships For New FID Volumes Reaching An Inflexion Point In The Spot Market Multi-Year Low For New Vessel Orders No New Entrants Low Gas Prices Creating New Demand For FSRUs GLOG And GLOP Ideally Positioned For G

Slide 22: Graham Westgarth, COO
Graham Westgarth, COO

Slide 23: GasLog's Flawless Delivery On A Global Scale
23 GasLog’s Flawless Delivery On A Global Scale France (88) Spain (34) U.K. (21) Turkey (8) Other (28) Trinidad (229) Peru (8) Japan (274) S.Korea (115) China (79) India (36) Taiwan (60) U.S.A. (104) Thailand (5) Mexico (8) Singapore (32) Other (8) Kuwait (17) Eq. Guinea (271) Malaysia (11) Egypt (1

Slide 24: Why Customers Choose GasLog?
24 Why Customers Choose GasLog? Proven Track Record Of Delivery Exceptional Terminal Feedback (Sep 15 – Mar 16) 23 vessels delivered (owned & managed) 223 Terminal Visits 214 Survey Responses - On time and on budget Excellent Rating: 7 newbuildings delivering 2016-19 92% of occasions - All expec

Slide 25: Committed Employees Aligned With Shareholders
25 Committed Employees Aligned With Shareholders Highly skilled and competent people on shore and ship-board Employer of choice attracts quality LNG seafarers Strategically located workforce 95%+ Retention rates since our inception Aligned with shareholder interests 50% London Cadet and inte

Slide 26: One Of The Most Modern Fleets On The Water
26 One Of The Most Modern Fleets On The Water Global LNG Fleet Including Firm Newbuild Order Pipeline 300 Global Fleet (excl. GasLog) GasLog Fleet 250 200 “First Generation” Steam Vessels Capacity (cbm) Built pre-2000 150 100 50 0 Dec-70 Dec-75 Dec-80 Dec-85 Dec-90 Dec-95 Dec-00 Dec-05 Dec-10 Dec-15

Slide 27: Driving New Technology Through The Industry
27 Driving New Technology Through The Industry LNGreen Saver Fins Boss Cap Fins Sloshield Re-liquefaction HALS

Slide 28: First Class Operational Platform
28 First Class Operational Platform Significant Experience In LNG Transportation Excellent Reputation With Our Customers And Terminals Highly Qualified Workforce – Aligned With Shareholders Leading Innovator In The LNG Shipping Industry Outstanding Safety Record

Slide 29: Graham Westgarth
Graham Westgarth

Slide 30: Why FSRU Is Of Interest To GasLog
30 Why FSRU Is Of Interest To GasLog 1 Cheap Gas/LNG Is Driving Increasing Demand 2 New Markets Favouring FSRUs Over Land-Based Solutions 3 Higher Returns Than Conventional LNG Carrier Business 4 Long-Term Contracts (Suitable For MLP Dropdown)

Slide 31: FSRU: A Key Enabler For Emerging Market Demand
31 FSRU: A Key Enabler For Emerging Market Demand New LNG Importers By 2025 – Demand By Key Driver New LNG Importers By 2025 – Demand By Region 20.0 7 30.0 markets 8 markets 25.0 16.0 Million tonnes per annum 20.0 27 Million tonnes per annum 12.0 markets 47 markets 7 18 markets 15.0 markets 7 market

Slide 32: New Smaller Markets Favour Floating Solutions
32 New Smaller Markets Favour Floating Solutions Potential New LNG Importers By Market Size Includes: Jamaica El Salvador 45 Senegal 40 35 30 Number of Markets 25 20 Includes: Includes: Cote D’Ivoire Ghana 15 Panama South Africa Uruguay Bahrain Includes: Includes: 10 Columbia Bangladesh 5 Philippine

Slide 33: GasLog Ideally Placed To Enter The FSRU Market
33 GasLog Ideally Placed To Enter The FSRU Market 1 Significant Expertise In Handling LNG 2 Extensive Experience With Process Plants And Ship To Ship Transfers 3 Assets Ideally Suited For Quick To Market, Cost-Effective Conversion 4 Leading Industry Position And Strong Customer Relationships 5 Excel

Slide 34: Possible FSRU Opportunities For GasLog
34 Possible FSRU Opportunities For GasLog Barge and FSU Conversion Newbuilding Delivery Time 18 months 20 - 22 months 28 - 32 months 100 – 750 mmscfd 250 – 750 mmscfd 500 – 1000 mmscfd Capacity 20,000 – 170,000 m3 145,000 – 170,000 m3 170,000 – 266,000 m3 Designed + Harsh weather +

Slide 35: Current FSRU Progress
35 Current FSRU Progress FSRU team build out continues ‒ Bruno Larsen hire announcement in March 2016 ‒ Additional commercial and technical resources employed Pre-engineering study with Keppel in Singapore for existing vessel conversion ‒ Both steam and TFDE vessels ‒ Preliminary results receive

Slide 36: Strong Financial Platform
STRONG FINANCIAL PLATFORM Simon Crowe, CFO

Slide 37: Proven Financial Track-Record With Inbuilt Growth
37 Proven Financial Track-Record With Inbuilt Growth Significant Firm Backlog Development To $3.6bn Delivered EBITDA(1) Growth Of Around 7.5x +133% 120 50 Adj. EBITDA¹ Total contracted days (000s) 100 40 Revenue 80 30 ($m) 60 20 40 10 20 - 0 Q4 Q4 Q4 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q

Slide 38: Solid Track Record And Broad Access To Capital Markets
38 Solid Track Record And Broad Access To Capital Markets Purchase Of 3 BG Vessels Purchase Of 2 BG $1.3bn 8x Newbuild ECA $1.05bn Legacy Facility Refinancing (1) $325.5m debt facility Vessels Backed Facility 8x 153-155cbm TFDE $199m net equity $460m debt facility $1.3bn raised $950m Ter

Slide 39: Proactive Approach To Debt Maturities
39 Proactive Approach To Debt Maturities Scheduled Debt Payments As At January 1, 2016 500 Amortization Other Balloon Repayment NOK Bond Maturity 400 Initial focus on 2016 and 2017 debt maturities 300 ($m) 200 100 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2016 2017 2018 2019 2020 S

Slide 40: No Near-Term Maturities... Focus Now On 2018-20
40 No Near-Term Maturities… Focus Now On 2018-20 Scheduled Debt Payments Following Five Vessel Refinancing And Sale & Leaseback 500 Amortization Focus now turns to 2018 onwards Legacy Facility Balloon Repayment 400 NOK Bond Maturity Other Balloon Repayment 300 ($m) 200 100 Pushed out all 2016 and 20

Slide 41: Limited Refinancing Risk Once Actions Completed
41 Limited Refinancing Risk Once Actions Completed Scheduled Debt Payments Proforma For $1.05bn Legacy Facility Refinancing And Planned NOK Bond Exchange(1) 500 Amortization Other Balloon Repayment NOK Bond Maturity 400 $450m GLOP Level Facility c. 50% LTV on inception 300 $338m bullet due Q4-20

Slide 42: Legacy Facility & NOK Bond Refinancings
42 Legacy Facility & NOK Bond Refinancings $1.05bn Legacy Facility Refinancing NOK Bond Refinancing Key Refinancing Terms Key Financing Terms $1.05bn refinancing comprised of NOK 750m (c. $90m) bond, maturing May 2021 – $950m Term Loan Facility Issued at a spread of 6.9% over NIBOR – $100m Rev

Slide 43: Simplified Facilities Backed By Supportive Lenders
43 Simplified Facilities Backed By Supportive Lenders $1.30bn Facility For Eight Newbuilds 4x 174cbm TFDEs + 4x 174cbm X-DFs Tenor of up to 12 years with an average amortisation profile of 15 years from vessel delivery Backed by KEXIM and K-Sure, either directly lending or providing cover for

Slide 44: Attractive Dividend And Distribution Yield
44 Attractive Dividend And Distribution Yield GasLog Ltd. GasLog Partners Currently $0.14 / Currently $0.478 / Share Per Quarter Unit Per Quarter Maximising Capital Target A 10-15% Growth While Maintaining CAGR Of LP Distribution A Meaningful Dividend Per Unit From IPO Yield: 4.5%(1) Yield: 9.4%(2)

Slide 45: Building Blocks Of GasLog Value
45 Building Blocks Of GasLog Value Improving MLP Releases GP and LP Value New LNGC Entry Into FSRU Contract Awards $3.6bn Firm Backlog Improving Spot Market Charter Free Net Asset Value In-Line With Book Value

Slide 46: Robust Platform For Future Value Creation
46 Robust Platform For Future Value Creation 1 Balance Sheet Strength Maintained Through The Cycle 2 Billion Dollar Financing Extends Maturities Further 3 Access To Multiple Sources Of Cost-Effective Capital 4 Dividend and Distribution Maintained Throughout Downturn 5 Attractive Yield And Growth Lea

Slide 47: Andy Orekar, CEO
Andy Orekar, CEO

Slide 48: GasLog Partners: A Different Marine MLP Strategy
48 GasLog Partners: A Different Marine MLP Strategy 1 Differentiated: Total Return And Financial Performance 2 Differentiated: Business Model And Cash Flow Stability 3 Differentiated: Counterparty Risk 4 Differentiated: MLP-Dedicated CEO And Independent Board 5 Differentiated: GP/LP Alignment And Dr

Slide 49: GasLog Partners' Business Model Provides Cash Flow Stability And Growth
GasLog Partners’ Business Model Provides Cash Flow 49 Stability And Growth… 100% fixed-fee revenue contracts — No commodity price or LNG project-specific exposure — No volume or production risk Strategy to acquire additional LNG carriers and FSRUs under multi-year contract — No capital expenditu

Slide 50: Meeting Or Exceeding IPO Performance Targets
…Enabling GasLog Partners To Meet Or Exceed IPO 50 Performance Targets Despite Challenging MLP Markets 1 Delivered 15% CAGR In Distribution Per Unit vs. 10-15% CAGR Target 2 Cumulative Coverage Ratio Of 1.23x vs. 1.125x Target 3 Completed $800 Million In Dropdown Transactions 4 Increased Fleet From

Slide 51: 15% CAGR In Cash Distribution, Strong Coverage
GasLog Partners Has Delivered A 15% CAGR In Cash 51 Distribution, While Maintaining Strong Coverage Annualized Cash Distribution Per Unit Distribution Growth Target: 10 – 15% CAGR from IPO $2.00 Cumulative Coverage Ratio: $1.912 $1.912 $1.912 1.23x since IPO $1.738 $1.738 $1.738 $1.75 $1.500 $1.500

Slide 52: Significant Book Value Per Unit Growth
Significant Book Value Per Unit Growth While Maintaining 52 High Distribution Payout Book Equity Value Per Unit Cumulative Quarterly Cash Distributions: $3.32 Per LP Unit Since IPO $19 $18 $17 $17 $16 $14 $14 $13 IPO Q115 Q116

Slide 53: MLP-Dedicated CEO And Independent Board
MLP-Dedicated CEO And Independent Board Committed 53 To GasLog Partners’ Long-Term Value Creation… Chief Executive Officer Incentive compensation based on GasLog Partners’ total return and financial performance No concurrent GasLog Ltd. responsibilities GasLog Partners Board Of Directors Chair

Slide 54: Strong Alignment Between GasLog Ltd. And GasLog Partners Equityholders
…With Strong Alignment Of Interests Between 54 GasLog Ltd.’s And GasLog Partners’ Equityholders GasLog Ltd. NYSE:GLOG Market Cap: ~$1.0 billion(1) 100% of IDRs 33%(2) and GP Public 67% GasLog Partners NYSE:GLOP Unitholders Market Cap: ~$660 million(1) 100% 100% 100% 100% 100% 100% 100% 100% “GasLog

Slide 55: GP Sponsor Committed To GasLog Partners' Future Growth
GP Sponsor, GasLog Ltd., Is Committed To GasLog 55 Partners’ Future Growth Our supportive GP sponsor, GasLog Ltd., provides GasLog Partners a differentiated dropdown pipeline to maintain and grow stable cash flows − 12 modern LNG carriers with firm charter periods ranging from 2020 to 2029 − Each

Slide 56: GasLog Partners Broadens Access To Capital And IDRs
GasLog Partners Broadens GasLog Ltd.’s Access To 56 Capital And IDRs Provide Unique Growth Opportunity Allows GasLog Ltd. access to large pool of equity capital − U.S. MLP and GP investors: $400 billion total equity investment(1)(2) − 20% of GasLog Ltd.’s float is owned by dedicated MLP funds Ac

Slide 57: 12 Vessel Dropdown Pipeline
12 Vessel Dropdown Pipeline Provides Asset Optionality 57 And Visibility For Continued Growth Dropdown Pipeline Capacity Vessel Built (cbm) Charterer 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Methane Lydon Volney 2006 145,000 GasLog Seattle 2013 155,000 Solaris 2014 155,000 Hull No. 210

Slide 58: Observations On Next Potential Dropdown Acquisition
58 Observations On Next Potential Dropdown Acquisition Subject to market conditions, GasLog Partners expects to target GasLog Ltd. vessel with firm charter through 2020 and may consider minority interest (49% or less) Strong balance sheet and supportive GP sponsor enables multiple financing alte

Slide 59: Illustrative Impact Of Vessel Minority Interest Acquisition
59 Illustrative Impact Of Vessel Minority Interest Acquisition GasLog Partners’ debt reduction of approximately $60 million since July 2015 dropdown has increased capacity to fund future growth GasLog Partners can fund a minority interest acquisition in one of 12 dropdown pipeline vessels withou

Slide 60: Visible Distribution Growth Supports Total Return Opportunity
GasLog Partners’ Visible Distribution Growth Supports 60 Compelling Total Return Opportunity GasLog Ltd. is strongly supportive of GasLog Partners’ future growth 12 vessel dropdown pipeline and financing alternatives provide visibility for continued distribution increases − Established track rec

Slide 61: Differentiated Total Return Performance Since IPO
61 Differentiated Total Return Performance Since IPO Performance Since IPO(1) 1. 15% CAGR in cash distribution per unit 14% GasLog Partners 2. 1.23x cumulative coverage ratio 3. $800 million in dropdown transactions -28% LNG MLP Peers(2) -29% Alerian MLP Index -54% Brent Crude (60.0%) (50.0%) (40.0%

Slide 62: GasLog Partners' Strategic Recap
62 GasLog Partners’ Strategic Recap Committed To Distribution, With Multi-Year Track Record Of Meeting 1 Or Exceeding 10 - 15% Target CAGR From IPO GasLog Ltd. Committed To GasLog Partners’ Future Growth, And 12 2 Vessel Pipeline Provides Significant Asset Optionality Strong Balance Sheet And Suppor

Slide 63: GASLOG SALEM
GASLOG SALEM HAMILTON

Slide 64: Why Buy GasLog And GasLog Partners?
64 Why Buy GasLog And GasLog Partners? 1 Fleet Fully Financed – Now Creating Liquidity For Growth 2 Majority Of Fleet Contracted – $3.6bn Of Fixed Revenue 3 Market Structurally Short Ships For New FID Volumes 4 Reaching An Inflexion Point In The LNG Shipping Spot Market 5 FSRU Opportunities For Addi

Slide 65: Q&A
Q&A

Slide 66: Appendix

Slide 67: GasLog's Fleet
67 GasLog’s Fleet Capacity Ship Built (cbm) 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 GasLog Partners LP GasLog Shanghai 2013 155,000 GasLog Santiago 2013 155,000 GasLog Sydney 2013 155,000 Methane Jane Elizabeth(1) 2006 145,000 Methane Alison Victoria(1) 2007 145,000 Methane Rita Andre

Slide 68: Climate Change Targets Positive For Gas Demand
68 Climate Change Targets Positive For Gas Demand World Primary Energy Demand By Fuel (Carbon-Constrained Scenario), 2015-2035 5,000 Primary energy demand (Mtoe) 4,000 3,000 2,000 1,000 0 Gas Coal Oil Nuclear Hydro Other Renewables Other Solid Fuels 2015 2020 2025 2030 2035 200 nations at the Dece

Slide 69: New Markets Add To Growing LNG Demand
69 New Markets Add To Growing LNG Demand New LNG Importer Demand 50 WoodMac’s LNG demand forecasts Previous WoodMac Estimate (H1 15) becoming increasingly more bullish Previous WoodMac Estimate (H2 15) 40 Current WoodMac Estimate (H1 16) Million tonnes per annum 30 20 10 0 2015 2016 2017 2018 2019 2

Slide 70: Existing Fleet Required To Move Existing Volumes
70 Existing Fleet Required To Move Existing Volumes Global Fleet By Propulsion Type 600 500 Number of Ships 400 300 200 100 0 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Steam Turbine (pre-2000 built) Steam Turbine (post-2000 built) Q-Flex / Q-Max DFDE / TFDE MEGI / XDF By 2020, Poten f

Slide 71: The Cool Pool Is Geared To A Spot Rate Rebound
71 The Cool Pool Is Geared To A Spot Rate Rebound LNG Shipping Spot Rate Evolution Trough to Peak 160,000 +581% 140,000 120,000 Trough to Peak 100,000 +328% Hire ($/day) 80,000 60,000 40,000 20,000 - Feb-2003 Feb-2004 Feb-2005 Feb-2006 Feb-2007 Feb-2008 Feb-2009 Feb-2010 Feb-2011 Feb-2012 Feb-2013 F

Slide 72: Vessel Efficiency Creating Market Inefficiency
72 Vessel Efficiency Creating Market Inefficiency Evolution Of Vessel Technology Order Date Vessel Capacity (cbm) Propulsion Consumption (HFO) Boil-Off Pre-2000 Newbuild < 138,000 Steam 200 tonnes/day 0.15%+ 2000 - 2007 Newbuild ~145,000 Modern Steam 185 tonnes/day 0.15% 2007 - 2016 Newbuild ~155,00

Slide 73: $2.5/mmbtu Henry Hub Vs. $50/barrel Brent
73 $2.5/mmbtu Henry Hub Vs. $50/barrel Brent Landed Gas Costs (Fixed & Variable) $10 $8 $7.5/mmbtu: oil-linked LNG contract (15% of $50 Brent) $6 Gas price is the only true $4 variable cost for offtakers with shipping and re-gas contracted $2 $0 Variable + Fixed Cost Variable + Shipping + Re-gas Var

Slide 74: What Are The FSRU Opportunities For GasLog?
74 What Are The FSRU Opportunities For GasLog? New LNG Importing Countries By First Terminal Type 5 8 out of 10 new LNG importing nations have Conventional chosen FSRUs as their first terminal Number of Terminals 4 FSU FSRU 3 2 1 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Many of the new

Slide 75: Non-GAAP Reconciliations
NON-GAAP RECONCILIATIONS

Slide 76: Non-GAAP Reconciliations
76 Non-GAAP Reconciliations Non-GAAP Financial Measures: Adjusted EBITDA EBITDA is defined as earnings before interest income and expense, gain/loss on interest rate swaps, taxes, depreciation and amortization. Adjusted EBITDA is defined as EBITDA before foreign exchange losses/gains. EBITDA and Adj

Slide 77: Non-GAAP Reconciliations
77 Non-GAAP Reconciliations Reconciliation of Distributable Cash Flow to Profit: (1) For the Quarter Ended (Amounts expressed in U.S. Dollars) 12-May-14 30-Sep-14 31-Dec-14 31-Mar-15 30-Jun-15 30-Sep-15 31-Dec-15 31-Mar-16 to 30-Jun-14 Partnership’s profit for the period $3,822,964 $9,575,060 $1,146
Source: Internet Archive copy of gaslogmlp.com
More decks from GasLog Partners LP
Q4 2022 Earnings Presentation23 slides · Jan 26, 2023
Q3 2022 Earnings Presentation25 slides · Oct 27, 2022
Q2 2022 Earnings Presentation27 slides · Jul 28, 2022
Q1 2022 Earnings Presentation26 slides · Apr 28, 2022
Q4 2021 Earnings Presentation23 slides · Jan 27, 2022
Q3 2021 Earnings Presentation25 slides · Oct 27, 2021