  1. Slide 1: QEC Presentation - Project Grandis

    For personal use only QEC Presentation Project Grandis 15 May 2024 ASX:EXR

  2. Slide 2: Gas - Macro Overview

    For personal use only Gas - Macro Overview 1. 2. 3. The desired energy LNG demand forecast East Coast Australia transition is very hard to rise gas supply crisis • A wide variety of challenges – • Multiple industry and • The long recognised supply physical, economic and Government parties crunch is

  3. Slide 3: Elixir Team

    For personal use only Elixir Team Board of Directors Quality Partners and Suppliers Richard Cottee Non-Executive Chairman – Information Sharing Agreement Former Managing Director of CSG focused Queensland Gas Corporation (QGC), taking it from market cap of $20M to $5.7B Other former CEO positions in

  4. Slide 4: Capital Structure and Shareholder Information

    For personal use only Capital Structure Shareholder Information Capital Structure 5.85% | MD & Directors Capital Structure Current Number of Shares 1,132 million 19.3% | Top 20 Elixir Energy Shareholders Options & Perf Rights 115 million Shareholders Market Capitalisation (at A$0.11) A$125 million C

  5. Slide 5: The Taroom Trough – An Advantaged Location

    The Taroom Trough – An Advantaged Location The prolific Bowen Basin is now set to deliver another energy source • The Grandis Gas Project is very well For personal use only located in the Taroom Trough in the Southern Bowen Basin • Australia’s premier physical and commercial gas hub – Wallumbilla –

  6. Slide 6: Material and Growing Energy Infrastructure

    Material and Growing Energy Infrastructure The Taroom Trough is adjacent to substantial and growing energy infrastructure For personal use only • New energy sources always benefit from adjacency to existing energy infrastructure – brownfields economics apply • The region has a substantial existing g

  7. Slide 7: Attractive to Large Sources of Capital

    Attractive to Large Sources of Capital Securing material capital for gas development needs to pass through multiple gates For personal use only • The Taroom Trough is a favourable location for such large companies: 01 Brownfields – many majors, large LNG buyers, etc, are 02 Low emissions profile – t

  8. Slide 8: Multiple Operator Activity

    Multiple Operator Activity Home to several majors, the Taroom Trough hosts material discovered and potential gas resources For personal use only • Shell: Currently drilling. “The estimate of recoverable hydrocarbons in this reservoir across ATP 645 in the area covered by PCA 1 (305), on an unrisked

  9. Slide 9: Daydream-2 – Multiple Objectives

    Daydream-2 – Multiple Objectives Daydream-2’s multiple objectives are centred around de-risking and value creation For personal use only Target of >500 metres of gross vertical interval of prospective reservoirs 1. Permeable Sandstones Stimulation program to cover primary targets: 2. Tight Sandstone

  10. Slide 10: Daydream-2 Delivers a Welcome Surprise

    Daydream-2 Delivers a Welcome Surprise Daydream-2 discovered a first in the Taroom Trough – a free flowing deep permeable formation * For personal use only • Drilled to total depth of 4,300 metres (14,108 feet) • Well drilled safely and under budget ATP 2044 Straightened • Gross interval of 607 metr

  11. Slide 11: Lab Results Deliver More Upside

    Lab Results Deliver More Upside Lab results reported in recent results suggest Perth & Cooper Basin analogues * For personal use only • Significant over-pressure confirmed – 9,400 psia in deep permeable zone • Analysis of cuttings samples from the deep permeable sand interval has identified clay ATP

  12. Slide 12: Impressive Initial Flow Test Results

    Impressive Initial Flow Test Results Successful Lorelle Sandstone flow testing * For personal use only • Conducted after a successful suite of DFITs • 2 stage flow test over permeable zone from 4,200 - 4,217 metres • Maximum Rate 2.3 MMSCFPD • Stabilized Rate 1.3 MMSCFPD • Gas was dry without indica

  13. Slide 13: Daydream-2 Lorelle Sandstone Flow Testing

    Daydream-2 Lorelle Sandstone Flow Testing* Gas Rate Water Rate For personal use only 2nd Flow Period 1st Flow Period Max. Rate: Unloading 2.3 MMCFPD completion Max. Rate: 1.8 MMCFPD Stab. Rate: fluid 1.3 MMCFPD Stab. Rate: 1.3 MMCFPD Increasing flow rate Unloading completion fluid 1st Flow Period 1s

  14. Slide 14: A New Play is Being Proven

    A New Play is Being Proven Economic flow-rate of 2.5mmscfd for vertical wells – the Lorelle Sandstone alone is modelled to meet this* For personal use only At 4,200 metres this is the deepest sustained natural flow of gas in Queensland and may herald the start of a whole new- and material - gas play

  15. Slide 15: Project Timeline – Delivering Upon Objectives

    Project Timeline – Delivering Upon Objectives 2024 For personal use only Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Post Drill Analysis 1 2 3 3 Injectivity & Pre-Stimulation 4 5 Testing Stimulation Planning 6 Lorelle Sst Flow Test 7 Stimulation, Completion & 8 9 Production Testing 1 Compilation

  16. Slide 16: Summary

    For personal use only Summary The World needs more gas for The East Coast has strong The Taroom Trough is longer – now explicitly pricing, a growing supply exceptionally well located on recognised by Govt policy gap & LNG plant ullage multiple fronts Growing need for energy The Taroom Trough is Earl

  17. Slide 17: Important Notice & Disclaimer

    For personal use only Important Notice & Disclaimer This document has been prepared by Elixir Energy Limited (ABN 51 108 230 995) (“Elixir”) in connection with providing an overview of its business to interested analysts/investors. This presentation is being provided for the sole purpose of providin

  18. Slide 18: Investors & Media

    INVESTORS & MEDIA For personal use only Neil Young Managing Director info@elixirenergy.com.au Phone +61 8 7079 5610 www.elixirenergy.com.au www.elixirenergy.com.au ASX:EXR