  2. Slide 2: Cipher Mining Presenters

    Cipher Mining Presenters Samy Biyadi Patrick Kelly Chris Totin Bryan Keller Reuben Govender Head of Power Co-President / Chief Construction Officer Chief Technology Officer Head of Markets Chief Operating Officer 2

  3. Slide 3: Power Procurement & Portfolio Introduction

    Power Procurement & Portfolio Introduction

  4. Slide 4: A Solar Asset in the Desert

    A Solar Asset in the Desert Case Study – Not a Cipher Project Located in the “Project Salvador will Atacama demonstrate that solar is a Desert in Chile viable and sustainable power solution in Chile given the strong solar irradiation and 70 MW high electricity prices in the Peak Solar Capacity regio

  5. Slide 5: Could a bitcoin mining facility have been the solution?

    What Went Wrong 1 2 3 Structural imbalances Transmission infrastructure Strong correlation of the between the local power deployment delays leading to power production profiles production & consumption in high curtailment levels leading to low nodal prices the northern part of Chile Could a bitcoin

  6. Slide 6: A Collaborative Approach to Turn Under-Monetized Electrons into Digital Assets

    A Collaborative Approach to Turn Under- Monetized Electrons into Digital Assets BITCOIN MINING LOAD: A UNIQUE ENERGY ASSET THE PROBLEM Local monetization of Vast amounts of energy are under-monetized due to various factors, including: electricity produced Transmission and distribution infrastructure

  7. Slide 7: Snapshot of Assets Portfolio

    SNAPSHOT OF ASSETS PORTFOLIO Long-Term Power Offtake to Protect Mining Profitability Diversified Mix of Sites as a Risk Mitigation Approach Self-Mining Capacity 236 MW Sites Across Texas 2 FTM(1) + 2 BTM(1) = 4 Total Capacity Collocated with Total Capacity Fully Hedged 96% 96% a Power Asset Remainin

  8. Slide 8: What's Next? Expansion at Existing Sites, New Sites & PPAs

    WHAT’S NEXT? EXPANSION AT EXISTING SITES Opportunistic expansions at existing sites with available capacity: • Alborz − Secure a grid connection to import power from the market as a complement to wind energy − Increase the data center capacity to match the wind farm interconnection capacity Alborz D

  9. Slide 9: Operations

    Operations

  10. Slide 10: Operations Team Structure

    Operations Team Structure Construction Site Operations Corporate Operations Technology • Engineering • Infrastructure • Awards & trade • IT network • Permitting operations & settlement implementation maintenance • Logistics & customs • IT security & systems • Procurement • Miner deployment, • Portfo

  11. Slide 11: Team Leads

    TEAM LEADS CO-PRESIDENT / COO Patrick Kelly – Co-President / Chief Operating Officer Chris Totin – Chief Construction Officer CONSTRUCTION Lee Rivers – Director of Data Center Field Operations SITE OPERATIONS Courtney Frazier – Head of Corporate Operations CORPORATE OPERATIONS Bryan Keller – Chief T

  12. Slide 12: Operational Leverage

    Operational Leverage 26 Cipher Full Time Employees OUTSOURCING PRINCIPLES 25 • Identify and secure industry best vendors, contractors, and suppliers • Significant experience and internally sourced references • Relevant licenses and certifications (SOC1/2) Dedicated Contractors • Ability to quickly s

  13. Slide 13: Key Indicators as of February 28, 2023

    Key Indicators as of February 28, 2023 OPERATIONAL POWER (MW) HASH RATE (EH/S) MACHINES 236 5.2 48k+ 11,000+ Current Current Operating To Be Energized 15.59 BTC 465 BTC 398 BTC Daily Production High BTC Held Monthly Production February Note: Values represented are approximations 13

  14. Slide 14: Odessa Site Overview

    Odessa Site Overview CIPHER MINING’S FLAGSHIP DATA CENTER

  15. Slide 15: About Me – Chris Totin

    About Me 568MW $21.2B Data Center Value of Projects Capacity Delivered Developed Chris Totin Chief Construction Officer Hats Worn Dad General Contractor 3 Kids <6 Years Old Subcontractor 6 Yr Old Girl - Valyn Project Manager 3 Yr Old Girl – Vera Construction Manager 9 Mth Old Boy – Rohm Program Mana

  16. Slide 16: A View from Low Earth Orbit

    A View from Low Earth Orbit

  17. Slide 17: Odessa Data Center Quick Facts

    Odessa Data Center Quick Facts 51.5 Acres 60,000+ ASICs(1) ~40 football fields 207 MW of capacity Remotely Operable Hyperscale Inspired Fully automated operations from switching to Designed to traditional data center specifications ticketing (1) Represents ASICs capacity of the Odessa data center at

  18. Slide 18: Development Timeline

    Development Q4 2021 Timeline Design 18

  19. Slide 19: Design

    Design KEY FEATURES 1 Simple 4 Elevated 2 Redundant 5 Optimized for Uptime 3 Robust 6 Decentralized 19

  20. Slide 20: Development Timeline

    Development Q4 2021 Timeline Design DEC 2021 Completed Procurement of Long Lead Equipment 20

  21. Slide 21: Globally Sourced

    Globally Sourced Equipment / Material Location MV Switchgear Germany VESSEL TRACKING PLATFORM LV Switchgear Canada HV Cable Turkey Miner Thailand Miner Malaysia Modular Data Center Texas, USA O&M Building Georgia, USA MV Transformers China Network Switches Korea Engineering Services Louisiana, USA M

  22. Slide 22: Development Timeline

    Development Q4 2021 Timeline Design DEC 2021 Completed Procurement JAN 2022 of Long Lead Equipment Broke Ground 22

  23. Slide 23: Beginning Conditions at the Odessa Data Center

    Beginning Conditions at the Odessa Data Center

  24. Slide 24: Development Timeline

    Development Q4 2021 Timeline Design DEC 2021 Completed Procurement JAN 2022 of Long Lead Equipment Broke Ground Started Construction SEP 2022 Ready to Mine First Circuits Completed & Ready to Start Mining NOV 2022 ERCOT Approval Started Mining 24

  25. Slide 25: Odessa Current Footprint

    ODESSA Current Footprint Odessa ~4.2 EH/s 143 MW Hashing 53 Miles Electrical Capacity Cables Installed 85 41 Miles Transformers Fiber Optic Installed & Cables Energized Installed

  26. Slide 26: Site Operations

    Site Operations Data Center Technicians Remote Operations Ticketing Data Science Data Center Operations Success Equation Ticketing platform Close partnership + + + = Highly experienced Infrastructure to that automates, with data science and qualified Data enable remote prioritizes, and team to build

  27. Slide 27: Technology

    Technology

  28. Slide 28: Making Cipher a Data Driven Company

    CIPHER TECH Making Cipher a Data Driven Company Data Engineering Data Science Info Security App Development Infra Support Creating the best Developing insights Monitoring threats Building custom Making sure data sourcing and through models and implementing software for miner everything works reporti

  29. Slide 29: Using Data to Drive Site Ops and Site Ops to Enhance Data

    Using Data to Drive Site Ops and Site Ops to Enhance Data Data Sourcing Business Logic Miner Control Miner Firmware Transmission & Production decisions control LMPs KPI, Monitoring, and Alerting miner statistics Data Science & Business Analysis 29

  30. Slide 30: Alborz

    Alborz Pioneering Data Driven Operations in Bitcoin Mining KEY CHALLENGES • Fully behind-the-meter • No grid connection, need to react to 100% of production volatility in real-time while maximizing available power availability • Wind is challenging; storms come suddenly • Significant consequences to

  31. Slide 31: Bear and Chief

    Bear and Chief Optimizing Dollar Profitability for Grid Connected Sites KEY CHALLENGES • Only operate when profitable • Enhance revenue through participation in day-ahead markets • Monetize ancillary services through rapid curtailment • Need to avoid 4CP events • Sites are remote 31

  32. Slide 32: Odessa

    Odessa Deploying Data Driven Analysis for Operations at Scale KEY CHALLENGES • Reacting to Luminant curtailment actions • Enhance revenue through power sales • Optionality on take-or-pay - combined challenge of FTM/BTM site • Very large scale 32

  33. Slide 33: Some Other Cipher Use Cases for Model Driven Decisions

    Some Other Cipher Use Cases for Model Driven Decisions EXAMPLES OF OTHER DATA SCIENCE INITIATIVES Neural Net modeling of projected network hash rate Bitcoin price predictions Power market volatility and spike probability Quantifying ‘cost to curtail’ Strategic decision modeling Data anomaly and outl

  34. Slide 34: Treasury Platform

    Treasury Platform

  35. Slide 35: Treasury Platform Overview

    Treasury Platform Overview Leverage 15+ years of Minimize power price Prudent Ensure a safe and commodities exposure through management of BTC robust control and experience providing optimization inventories and cash operational solutions to corporate strategies balances environment under a producer

  36. Slide 36: BTC Management – Overview

    BTC Management – Overview CORE STRATEGIES SELL HOLD • Daily liquidation • Target inventory build over time • Target OPEX+ coverage • Serviceable as collateral • Balance liquidity and market view • Increase allocation with strong bullish view • Increase allocation with strong bearish view OPPORTUNIST

  37. Slide 37: BTC Management – Principles

    BTC Management – Principles LIQUIDATION PRINCIPLES HEDGING PRINCIPLES • Minimize market impact with TWAP execution • Outperform hurdle rate on liquidation strategy • Cold wallet storage for inventory • Select high quality counterparties • Continuous monitoring of trading hot wallet • CME futures / F

  38. Slide 38: Power Management

    POWER MANAGEMENT BEHIND-THE-METER Odessa • Fixed price PPA with embedded optionality • Fully automated mine / curtailment management of data center • Optimize power price exposure through real-time sale of power when revenue is greater than mining economics • Take advantage of forward sales of power

  39. Slide 39: Safe Harbor

    Safe Harbor • This presentation has been prepared by Cipher Mining Inc. and is made for informational purposes only. The information set forth herein does not purport to be complete or to contain all of the information you may desire. You must evaluate, and bear all risks associated with, the use of