Eversource Energy (d/b/a) · NYSE:ES

Eversource Energy (d/b/a) — Eversource Energy — Corporate Update (July 2026)

71 slides from Eversource Energy (d/b/a)'s corporate update, Jul 21, 2026

  1. Slide 1: Non-Residential Renewable Energy Solutions Program Informational Webinar & Bidders Conference

    Aaron Dubauskas, Julie Castillo, Matt Hohenthal, Curtis Fahnestock, Patrick Fam, Scott Miller – Eversource John King, Maritza Estremera Jimenez, Joseph Marranca – The United Illuminating Company NON-RESIDENTIAL RENEWABLE ENERGY SOLUTIONS PROGRAM INFORMATIONAL WEBINAR & BIDDERS CONFERENCE JULY 21, 20

  2. Slide 2: Webinar recording and Tariff Agreement notice

    This webinar is being recorded by the EDCs. If you do not consent to being recorded as a participant in the webinar, please exit the call. In the event of any inconsistency between the provisions of the NRES RFP or any part of this presentation, the provisions of the Tariff Agreement are controlling

  3. Slide 3: Agenda

    Agenda Program Background & Overview Eligibility RFP Process Processes, Forms & Fees Interconnection Metering Questions

  4. Slide 4: Questions

    Questions  Refrain from using Meeting Chat until the Q&A session – We will try to answer questions at end of presentation if time allows  After presentation – Email questions to both companies:  CTCommRenewables@eversource.com  NRES@uinet.com  General Q&A’s may be added to our running Q&A docum

  5. Slide 5: Background & Overview

    BACKGROUND & OVERVIEW

  6. Slide 6: Connecticut Public Act 22-14

    Connecticut Public Act 22-14 An Act Concerning Clean Energy Tariff Programs modified the NRES program to expand the growth of the non-residential renewable energy market. Benefits Include: Supporting Furthering Lowering Local CT’s Clean Customer Clean Energy Energy Energy Goals Bills Jobs

  7. Slide 7: NRES Overview

    NRES Overview • 2026 is the fifth year of the NRES program • PURA Docket 26-06-04 was recently created for the implementation of Clean Energy Successor Programs • Six-year program that combines Net Metering and Renewable Energy Certificates (REC) payments into one program • 20-year Agreement term. 5

  8. Slide 8: Year 5 NRES Key Program Updates

    Year 5 NRES Key Program Updates • Fuel Cells and Anaerobic Digester projects are no longer eligible per P.A. 25-173. Only zero emission projects are eligible. • Updated Netting & Buy-All Price Caps • In Year 5, we will award projects in the Small Zero, Medium Zero, and Large Zero Emission categories

  9. Slide 9: Megawatt Allocation Above Cap

    Megawatt Allocation Above Cap  Public Act 24-31, An Act Concerning Solar Projects Throughout the State  Beginning in 2025 with NRES Year 4  Allows for the NRES Program to exceed available capacities under certain conditions  Aggregate annual compensation of all 2026 selected Projects compared wi

  10. Slide 10: School Solar Category - General

    School Solar Category - General  Public Act 24-151 – Encourages installation of PV and storage at public schools – Incorporated into the NRES program as a separate capacity carveout  25 Total MW Annually – Separate from other NRES capacities – 80/20 split between the EDCs – 20 MW for ES and 5 MW f

  11. Slide 11: School Solar Category – Bidding & Timing

    School Solar Category – Bidding & Timing  School Solar is non-competitive – First come, first served – Price takers  RFP opened on February 2, 2026 – Remains open until capacity is filled or the end of the August RFP submission window is reached  Bid submission and requirements are the same as al

  12. Slide 12: School Solar Category – Pre-Application Checklist

    School Solar Category – Pre-Application Checklist

  13. Slide 13: NRES Key Program Highlights

    NRES Key Program Highlights  Sustainable Energy Advantage, LLC (SEA) serves as the Ombudsperson for the NRES, SCEF, and RRES programs, effective since April 1, 2024.  The non-refundable NRES Bid fee is $450 per Bid to cover the cost of the ombudsperson.  As ordered in the NRES Year 3 Decision, al

  14. Slide 14: NRES Key Program Highlights

    NRES Key Program Highlights  Add-On Netting systems are now allowed for both EDCs.  REC buybacks – Customers can elect to enter into a form of Tariff Agreement that allows them to purchase and retire the RECs from their Project.  SAM Customer Hosts is not required to own Project Site but must hav

  15. Slide 15: Year 5 NRES Tips for Successful Bid Submission

    Year 5 NRES Tips for Successful Bid Submission  Bids must be submitted with the Bid Certification Form from the current Program year. Only use Program documents found on the NRES websites rather than previously saved versions.  If your project is being sized to load (i.e.: not a rooftop buy-all pr

  16. Slide 16: Year 5 NRES Tips for Successful Bid Submission

    Year 5 NRES Tips for Successful Bid Submission  If you submit a Bid with anticipated future load from beneficial electrification or EV chargers, a stamped calculation from a Connecticut licensed Professional Engineer, along with the Professional Engineer Certification Form on the NRES websites are

  17. Slide 17: Year 5 NRES Tips for Successful Bid Submission

    Year 5 NRES Tips for Successful Bid Submission  If the Project is sited at an Affordable Multifamily Housing property, it must participate in the RRES Program.  If the entity is anything other than an individual person, you must indicate that you are NOT an individual and include all necessary inf

  18. Slide 18: Year 5 NRES Available Budget & Capacity - Eversource

    Year 5 NRES Available Budget & Capacity - Eversource *MW allocations may change if projects terminate or install smaller in accordance with the applicable program rules.

  19. Slide 19: Year 5 August NRES Available Budget & Capacity - Eversource

    Year 5 August NRES Available Budget & Capacity - Eversource Eversource Year 5 August Available Budget/Capacity Small Zero Emission Medium Zero Emission Large Zero Emission School Solar Available MW 18.4 Available MW 9.82 Available MW 6.42 Available MW 38.625 Available Budget $ 4,334,547.09 Available

  20. Slide 20: Year 5 NRES Available Budget & Capacity - UI

    Year 5 NRES Available Budget & Capacity - UI Category Project Size (AC) UI Budget Cap / UI MW/Year Project Selection Year Process Small Zero ≤200 kW $1,900,899 6.0 First-Come, First Emission Served. Subject to two-week window Medium Zero >200 kW $2,250,672 8.0 Competitive Emission <1,000 kW Solicita

  21. Slide 21: Year 5 August NRES Available Budget & Capacity - UI

    Year 5 August NRES Available Budget & Capacity - UI Large Zero Emission Budget Remaining $1,150,125.00 Capacity Remaining (MW) 10.24 Medium Zero Emission Budget Remaining $ - Capacity Remaining (MW) 8.36 Small Zero Emission Budget Remaining $ 584,178.69 Capacity Remaining (MW) 4.21  UI has no Mediu

  22. Slide 22: Two Tariff Options

    Two Tariff Options Zero and Low Emission Project installations that qualify for this Program may sell the energy and Renewable Energy Certificates (RECs) at a fixed 20-year price by selecting one of two tariff options: Buy-All Tariff Netting Tariff • Customer exports all electricity produced by thei

  23. Slide 23: Buy-All

    Buy-All BUY-ALL Send all production to grid; Purchase all for building load. Utility Revenue/ Production Meter Customer receives quarterly payments for all energy and RECs. Customer can elect for a percentage of the total compensation to be assigned to a third party. Any remaining compensation will

  24. Slide 24: Netting

    Netting NETTING All power production and consumption are metered & billed together Revenue Meter (Bi-Directional) The value of the energy will be credited to the customer's monthly bill. The customer can choose to either receive quarterly direct payment for the RECs, or they can assign all or a port

  25. Slide 25: Eligibility

    ELIGIBILITY

  26. Slide 26: Site and System Eligibility Requirements

    Site and System Eligibility Requirements Eligibility Requirement  Eversource or UI Customer Site & Customer Eligibility  Project is going In-Service on or after the RFP issuance date  Small Zero Emission Category: ≤ 200 kW  Medium Zero Emission Category: > 200 kW and < 1000 kW  Large Zero Emiss

  27. Slide 27: Tariff Eligibility Requirements

    Tariff Eligibility Requirements Requirement How to Meet:  Eversource or UI customer • Most recent Customer Bill for the Project Site  Site Control • Proof of Site Control is between the Developer of the Project and the Owner of the Project Site • Documentation proving site control such as deeds*,

  28. Slide 28: Sizing Requirements Based on Load

    Sizing Requirements Based on Load Projects in the NRES Program must be sized appropriately to the Project Site’s load Load Calculation Options How to Meet:  Historical Load Bidder must provide the historical annual load/usage in kWh for the project site. The estimated annual generation (kWh) cannot

  29. Slide 29: SAM Projects

    SAM Projects SAM Customers are State, Agricultural, or Municipal Customers which may have multiple Beneficial Accounts associated with their Projects. SAM Customers can provide load data for up to five Beneficial Accounts to support the Project size. Additionally, SAM Customers may allocate monthly

  30. Slide 30: RFP Process

    RFP Process

  31. Slide 31: 2026 Price Caps and Tariff Rates

    2026 Price Caps and Tariff Rates Category Buy-All Price 100% Solar Netting Rate Cap ($/MWh) Carport/Canopy Price Cap ($/MWh) Small Zero Emission Dependent upon $250.42 N/A EDC, Size Tariff Rate Category, Retail Medium Zero Emission Rate, Technology, $236.74 $338.20 Price Cap and Solar Carport/Canopy

  32. Slide 32: Application/Bidding Process for August RFP: Medium & Large Zero Emission

    Application/Bidding Process for August RFP Medium & Large Zero Emission Categories • 8/3/2026 at 1:00pm* - Bid Window opens • 9/14/2026 at 1:00pm - Bid forms due for all categories Bids are screened for eligibility; eligible Bids are ranked from Process lowest to highest evaluated Bid price after ap

  33. Slide 33: Application/Bidding Process for August RFP – Small Zero Emission

    Application/Bidding Process for August RFP – Small Zero Emission Small Zero Emission Category • Two-Week Window: All complete bids submitted during two- week window are considered submitted at the same date/time • If oversubscribed in Two-Week Window, random selection • First-come first-served appli

  34. Slide 34: Application/Bidding Process for School Solar Projects

    Application/Bidding Process for School Solar Projects School Solar Category • 2/2/2026 at 1:00pm* - Bid Window opened • 9/14/2026 at 1:00pm - School Solar bid forms due • School Solar projects can be submitted from the opening of the RFP through the close of the August RFP, as long as Process capaci

  35. Slide 35: August RFP Schedule

    August RFP Schedule* Action Item Date Bidders Conference – Webinar Only July 21, 2026 Deadline for Submission of Questions July 28, 2026 Release of RFP and Opening of Bid Window for All Project August 3, 2026 at 1:00:00 p.m. (Eastern Prevailing Time “EPT”) Size Categories, and Opening of Two-Week Wi

  36. Slide 36: August RFP Schedule (continued)

    August RFP Schedule (continued)* Action Item Date First round of Selection and Notification of Winning On or about November 2, 2026 Bidders for All Categories Tariff Agreement Execution After Selection and Notification of Winning Bidders. Bidders will have to return partially executed contracts by t

  37. Slide 37: Processes, Forms & Fees

    Processes, Forms & Fees

  38. Slide 38: Tariff Payment Beneficiaries

    Tariff Payment Beneficiaries Incentive payments may be provided to the Customer or to a Tariff Payment Beneficiary Buy-All Netting Initial Beneficiary Designation – Required at time of application Customers can designate a Tariff Customers can designate a Tariff Payment Beneficiary to receive all or

  39. Slide 39: Bid Preferences

    Bid Preferences Applicants may select the following Bid Preferences during the Bid process Site Location is a Landfill or Brownfield Site or SAM Project with 100% of Beneficial Accounts located in a Distressed 20% Bid Preference in Year 5 Municipality Available to projects located on landfills or 20

  40. Slide 40: Checklist of Required Bid Documents

    Checklist of Required Bid Documents Required Bid Documents Bid Certification Form (All 5 pages, including  documentation proving site control)*  Documentation demonstrating ownership or site control of the Project Site by a SAM Customer Host (if applicable)  12 months of consecutive historical lo

  41. Slide 41: Netting Incentive Example

    Netting Incentive Example On-bill Credits REC Payment Assume customer’s retail rate = $0.1487 / kWh Netted production paid Direct cash payment to to Customer on bill at Customer or Tariff retail rate Payment Beneficiary 60,000 kWh – 40,000 60,000 kWh * $0.019 = kWh = 20,000 kWh * $1,140.00 $0.1487 =

  42. Slide 42: Buy-All Incentive Example

    Buy-All Incentive Example On-bill Credits Cash Payment Customer wants 20% as Customer wants 80% as cash payment to Tariff on-bill credits Payment Beneficiary 60,000 kWh * $.145/kWh = $ 8,700 Buy-All Rate = $.145/kWh 80% * $8,700 = 20% * $ 8,700 = $6,960.00 $1,740.00 Production Credits Cash Payment R

  43. Slide 43: Online Resources

    Online Resources United Illuminating Eversource UI Non-Residential Renewable Energy Solutions Main Eversource Non-Residential Renewable Energy Page Solutions Program Main Page - Eversource.com/NRES UI Bid Portal

  44. Slide 44: Interconnection

    Interconnection

  45. Slide 45: Interconnection Application Process Tips: Pre-Application

    Interconnection Application Process Tips: Pre-Application • Before submitting an application • Know your planned or actual compensation/incentive • Application must be consistent with planned compensation/metering • NRES Buy-All, NRES Netting, SCEF, LREC/ZREC, Virtual Net Metering, Rate 980, Battery

  46. Slide 46: Interconnection Application Process Tips: Pre-Application continued

    Interconnection Application Process Tips: Pre-Application- continued • Visit the site to collect accurate information • Do your homework • If questions, please ask, don’t assume • Projects over 1 MW may require ISO-mandated transmission cluster studies- FERC order 2023 • Have the correct pscad model

  47. Slide 47: PowerClerk Log In/Sign Up

    PowerClerk Log In/Sign Up • When you apply using the PowerClerk Log In/Sign Up page, please have someone filling out the application that is familiar with how to answer the questions, technical and otherwise. • The Information and Requirements (I&R) book can be found via the following link (Eversour

  48. Slide 48: Interconnection Application Process Tips- Front-End of Process

    Interconnection Application Process Tips- Front-End of Process • Submit a COMPLETE, CONSISTENT and CORRECT application • Accurate Site Plan- show existing and proposed equipment – show meters outside, grouped, disconnect • Accurate One line- show existing and proposed additions, clearly- (PE stamped

  49. Slide 49: NRES Netting One Line Example

    NRES Netting One Line Example

  50. Slide 50: NRES Buy-All One Line Example

    NRES Buy-All One Line Example

  51. Slide 51: Interconnection Application Process Tips- Mid-Process

    Interconnection Application Process Tips- Mid-Process 1. Limit changes mid-process if possible 2. A Customer Care Account Executive or Analyst is assigned to each project a. Single point of contact….but not single point of all answers at their fingertips 3. Use the ask-a-question (inquiries) functio

  52. Slide 52: Interconnection Application Tips: Back-End/Final Approval

    Interconnection Application Tips: Back-End/Final Approval 1. After the DER system is installed and tested a. New ISO-settings for newer applications 2. Metering install starts with Municipal Inspection approval in our Work order system 3. All requirements for close-out should be in indicated in the

  53. Slide 53: Interconnection Application Process – Future Improvements

    Interconnection Application Process – Future Improvements • More PowerClerk functionality, Information and Requirements book and website updates • More automation and streamlined processing of workflow • Keep all communications, documents, status, inside PowerClerk for visibility and tracking • More

  54. Slide 54: Interconnection Application Process

    Interconnection Application Process Eversource Connecticut Application to Connect: • https://www.eversource.com/content/residential/about/doing-business-with- us/interconnections/connecticut/connecticut-application-to-connect • Distributed Generation - UI - https://www.uinet.com/smartenergy/innovati

  55. Slide 55: Interconnection Application Process

    Interconnection Application Process UI Connecticut Application to Connect: PowerClerk Renewable Energy Solutions Portal UI Connecticut Distributed Generation team : All inquiries should be submitted through the “Ask a Question” feature in PowerClerk. Once an application is submitted, an analyst will

  56. Slide 56: Metering

    Metering

  57. Slide 57: Meter Engineering Guidance

    Meter Engineering Guidance  As mentioned earlier, it is critical to know which program or incentive before submitting an application – Each incentive has a specific metering design and process.  Metering equipment and meter installation must be complaint with the Eversource I&R book. The same guid

  58. Slide 58: Meter Engineering Guidance

    Meter Engineering Guidance  Any indoor metering must be relocated outside and brought to standards of the latest Connecticut Eversource I&R book – RELOCATION PURPOSES ONLY – IT rated service can have meter conduit up to 100’ for services 1800A or less. Services greater than 1800A can have conduit u

  59. Slide 59: Instrument Transformer Rated Metering

    Instrument Transformer Rated Metering What does the Installation Contractor Provide? Provide all diagrams and  All Requirements for a new Service equipment spec sheets to Eversource for review.  Diagrams – 1-line and 3-line diagrams Email scott.d.miller@eversource.com for  Approved IT cabinet any

  60. Slide 60: Instrument Transformer Rated Metering

    Instrument Transformer Rated Metering  Current Transformers and Voltage Transformers are installed by the customer’s electrician. Polarity of the Current Transformers MUST face the utility for all metering at Eversource. – Do not confuse this with the requirements for United Illuminating.  Eversou

  61. Slide 61: Self-Contained Metering

    Self-Contained Metering  Voltage MUST be present on the line side of self-contained meter sockets prior to an Eversource meter install – Sockets that DO NOT have voltage will not have a meter installed. Second visit will be required.  Buy-all services that are self-contained should use the AC disc

  62. Slide 62: Meter Equipment Guidance

    Meter Equipment Guidance All metering equipment used for should be compliant with the Connecticut Eversource I&R book. This applies to both the production meter and revenue meter.  When purchasing meter sockets, please ensure that the equipment used matches voltage, amperage, and service being mete

  63. Slide 63: Meter Equipment Guidance (Cont.)

    Meter Equipment Guidance (Cont.)  For DER installations where service entrance equipment is being upgraded or replaced, equipment should be submitted as part of that process  The Eversource I&R book and link to Approved Meter equipment can be found under the Electric Contactor Resources page: http

  64. Slide 64: Self-Contained Metering

    Self-Contained Metering - LINE and LOAD conductors for production meter are in separate conduits - Neutral isolation is used when required by NEC - Meter socket is bonded to ground - Eversource I&R approved meter socket is used with a lever bypass -Disconnect is adjacent to production meter socket -

  65. Slide 65: Transformer Rated Metering

    Transformer Rated Metering - LINE (Utility) and LOAD (Generation) should be clearly labelled inside current transformer cabinet - Current transformers must be mounted with polarity facing utility - Conduits for conductors MUST NOT enter the bottom. Space at bottom of current transformer cabinet requ

  66. Slide 66: NRES Metering Diagrams Location

    NRES Metering Diagrams Location Eversource.com/NRES UI.com NRES drawings Toward the bottom of the page, expand the Program Information section and click on Metering Diagrams

  67. Slide 67: Buy-all Incentive Guidance

    Buy-all Incentive Guidance  Please refer to the latest meter diagrams for guidance on system design.  Projects applying to the Buy-all Program will require a new service request and a site meeting with a representative from the Field Engineering and Design group. Point of interconnection will be r

  68. Slide 68: Technical Questions or Concerns on Metering

    Technical Questions or Concerns on Metering Please reach out to scott.d.miller@eversource.com for questions regarding: - Meter equipment or switchgear for NRES Buy-all or netting projects - Pre-construction meetings - Relocation of meters - Technical questions on installation UI Guidebook of Require

  69. Slide 69: United Illuminating (UI) DG Interconnection Services

    United Illuminating (UI) DG Interconnection Services

  70. Slide 70: Questions

    Questions

  71. Slide 71: Contacts

    Contacts Eversource NRES Team: UI NRES Team: ctcommrenewables@eversource.com nres@uinet.com

Eversource Energy — Corporate Update (July 2026) on 6ix