Gunnison Copper Corp. · TSX:GCU

Gunnison Copper — Investor Presentation (April 2026)

28 slides from Gunnison Copper's investor presentation, Apr 1, 2026

  1. Slide 1: Advancing Gunnison, for America's Future

    Advancing Gunnison, for America’s Future Invest in America | April 2026 TSX:GCU / OTCQB: GCUMF GunnisonCopper.com 1

  2. Slide 2: Disclaimers

    Disclaimers Special Note Regarding Forward-Looking Information: This presentation contains "forward-looking information" concerning anticipated developments and events that may occur in the future. Forward looking information contained in this presentation includes, but is not limited to, statements

  3. Slide 3: Gunnison Copper Project Highlights

    Gunnison Copper Project Highlights Clear Path to Development PEA with 21-Year Project Mine Life in Arizona, USA (Scarcity of Projects) Pure Copper Cathode Conventional Open-Pit, Heap Leach, SX/EW. Will Produce Copper Cathode Tier 1 Location - Arizona Private and State Land. State-Led Permitting Proc

  4. Slide 4: U.S. Government Strategic Tailwinds for Domestic Copper

    U.S. Government Strategic Tailwinds for Domestic Copper DOE Tax Credits Office of Strategic Capital EXIM Project Vault Critical Mineral List Johnson Camp Mine Up to ~$100 billion in lending EXIM’s largest financing approval The US government added copper to its received authority to support critical

  5. Slide 5: Permitting Process and Track Record

    Permitting Process and Track Record • State-led permitting framework (no federal nexus) Gunnison Copper has successfully • All major permits already issued under prior ISR plan permitted and brought two mines into • Primary path forward = amendments, not new permits • Lower permitting risk and short

  6. Slide 6: Gunnison Project Preliminary Economic Assessment

    Gunnison Project Preliminary Economic Assessment Financial Metrics Johnson Camp Mine • NPV @ 8% (after-tax) $1,959M Gunnison Pit • Internal Rate of Return 22.5% Waste Rock • AISC (LOM Avg) $2.05/lb I-10 • Payback Period 3.9 years Gunnison Waste Rock WRF • Initial Capex w/ Acid Plant $1,556 Pit • Cop

  7. Slide 7: Gunnison Project - Total Copper Produced

    Gunnison Project - Total Copper Produced Total copper produced: 3.2 billion lbs Annual Production (M lbs) over a 21 year mine life 250 3,200 212 3,187 200 3,000 263 150 2,800 2,712 100 2,600 2,400 50 2,200 0 Cactus Gunnison Safford Bagdad Florence Johnson Camp 2,000 (Arizona Project (Freeport) (Free

  8. Slide 8: Midpoint Of The Cost Curve For Copper Mines Globally

    Midpoint Of The Cost Curve For Copper Mines Globally $/lb Cu Operating Expenditures – Copper Inputs Produced Mining - Before Deferred Stripping 1.32 Mining - Limestone Credits (0.07) Mining - Deferred Stripping (0.06) Gunnison Project | Global Cost Curve Positioning Mining - Subtotal 1.19 Processing

  9. Slide 9: Peer Ranking: NPV and Initial CAPEX Ratio

    Peer Ranking: NPV and Initial CAPEX Ratio After-Tax NPV (US$M) and NPV: Initial CAPEX Ratio 4.0x 2.4x 1.1x 1.3x 1.3x 1.1x 0.9x 1.2x 1.0x 0.6x 0.8x 0.9x $2,770 $2,301 $2,009 $1,959 Gunnison $1,952 $1,867 Recently Acquired Project $1,376 Arizona Developer $1,108 $1,100 $930 Americas Developer $713 $70

  10. Slide 10: Profitability Metrics – Free Cash Flow Profile (USD)

    Profitability Metrics – Free Cash Flow Profile (USD) $14.5B $13.8B $6.96B LoM Gross Revenue LoM Net Revenue LoM Free Cash Flow This chart contains Non-IFRS financial measures; see “Non-IFRS Financial Measures”. Years 4 and 5 free cash flows include the impact of $326M in expansion capital for the ce

  11. Slide 11: Significant Upside to Copper Prices

    Significant Upside to Copper Prices Base Case COMEX Price Copper Price I-10 $6.00/lb Units $4.25/lb $4.60/lb $5.00/lb $5.50/lb $6.50/lb $7.00/lb Sensitivities Gunnison WRF NPV8 M$ 1,566 1,959 2,403 2,953 3,500Pit 4,043 4,586 WRF IRR % 19.55% 22.51% 25.81% 29.84% 33.73% 37.47% 41.12% Crusher Project

  12. Slide 12: Gunnison Project Benchmarking

    Gunnison Project Benchmarking Relative Positioning vs. Project Peers (Mine Life, Cash Cost, Production) Bubble Size represents Avg. $2.40 LOM Cu Production in Mlbs 300 $2.20 100 $2.00 50 Marimaca $1.80 Upside Potential with Exploration Co-Product Cash Cost Gunnison Copper $1.60 at Strong & Harris Sa

  13. Slide 13: Strong & Harris Satellite Deposit High-Grade Cu Upside

    Strong & Harris Satellite Deposit High-Grade Cu Upside .30 %Cu .30-.50 %Cu .50-.85 %Cu .85 > %Cu Several High-grade zones throughout the deposit TSX: GCU / OTCQB: GCUMF / Frankfurt: 3XS0 13

  14. Slide 14: Strong & Harris Mineralization – Significant Value to Unlock

    Strong & Harris Mineralization – Significant Value to Unlock Drilled and known inferred resource of the mineralization PEA Pit Design Open Mineralization Open Possible Extension Mineralization Under Known Mineralization TSX: GCU / OTCQB: GCUMF / Frankfurt: 3XS0 14

  15. Slide 15: Strong & Harris Geophysical and Magnetic Data

    Strong & Harris Geophysical and Magnetic Data Magnetic Anomalies Associated with Known Mineralization PEA Pit Design Magnetic Anomalies Known Mineralization TSX: GCU / OTCQB: GCUMF / Frankfurt: 3XS0 15

  16. Slide 16: Additional Future Satellite Pit Potential

    Gunnison Project Exploration Upside Potential Additional Future Cu-Zn-Ag Strong and Harris Satellite Pit Potential Zone Peabody Sill Peabody Mine Moore North Pb-Zn-Ag • Potential for additional satellites to be added Copper Chief Zone ~5 miles into PFS mine plan Johnson Camp Texas Arizona • Most adv

  17. Slide 17: Valuation Comparison vs Peers

    Valuation Comparison vs Peers Gunnison P/NAV Ranking vs Select Peers 1.15x 1.21x Transaction Average 1.18x 492% Higer Potential Re-Rate 0.68x 0.70x 0.89x Peer Group 0.69x Average 0.69x 287% Higher Gunnison P / NAV 0.24x Gunnison Faraday Ivanhoe Electric Mid Cap Copper Hudbay & Arizona Sonoran Eldora

  18. Slide 18: Key Insights: Gunnison vs Arizona Sonoran

    Key Insights: Gunnison vs Arizona Sonoran Arizona’s Copper Future | Gunnison & Arizona Sonoran Implied Gunnison Value +379% P / NAV P / NAV 0.24x P / NAV 1.15x Equity Value (1) / Transaction Value $M $120 $1,480 Primary Asset Gunnison Cactus Study 2026 PEA 2025 PFS Copper Price $/lb $4.60 $4.25 LOM

  19. Slide 19: Capital Structure and Strong Institutional Shareholder Base

    Capital Structure and Strong Institutional Shareholder Base Capital Structure Ownership3 Market Capitalization C$164.9M US$117.8M 3% Cash1 December 31, 2025 C$28.7M US$20.6M 13% Convertible Debt1, 2 C$7.5M US$5.4M 34% Shares Outstanding 422.8M Options 25.6M Warrants 54.6M Convertibles 36.8M Fully Di

  20. Slide 20: Appendix

    Appendix TSX: GCU / OTCQB: GCUMF / Frankfurt: 3XS0 20

  21. Slide 21: Johnson Camp Mine – One of America's Newest Copper Producers

    Johnson Camp Mine – One of America’s Newest Copper Producers Producing in Arizona - from Material to Grade A Copper Cathode Health & Safety • Over 12 years LTI-free, demonstrating a strong safety culture Construction Key Figures • $170M construction capex • Created 250+ jobs • 25 MPPA SX/EW Plant Ca

  22. Slide 22: Proven Permitting & Operating Team

    Key Team Members Management Board of Directors Stephen Twyerould, Ph.D – CEO, President and Director Over 35 years’ experience in the mining industry across numerous early-to-late Fred DuVal – Chairman of the Board stage companies worldwide, with extensive track record performing in both Mr. DuVal w

  23. Slide 23: Catalyst-Driven Strategy with a Proven Ability to Deliver

    Catalyst-Driven Strategy with a Proven Ability to Deliver Next 6 7-24 Months Months • Gunnison Updated PEA full report • JCM to full nameplate production capacity • Commence work on Gunnison PFS and Permit • Gunnison metallurgical test work results Amendments • Gunnison in-fill drill program results

  24. Slide 24: Mineralized Material Sorting Limestone / Cement

    Mineralized Material Sorting Limestone / Cement Optical sorting removes non-mineralized High-purity limestone overburden supports optional material before leaching cement & limestone sales into regional markets • Optical sensors reject non-mineralized rock after crushing / before • Drilling and lab

  25. Slide 25: Gunnison Mine Plan and Production Profile (Mtons)

    Gunnison Mine Plan and Production Profile (Mtons) I-10 Gunnison WRF Pit WRF Crusher Leach Pad Note: Leach numbers correspond to the tons stacking in the leach pads per year, and do not necessarily indicate copper recovery in those periods. TSX: GCU / OTCQB: GCUMF / Frankfurt: 3XS0 All currency amoun

  26. Slide 26: Gunnison Copper Cathode Produced (Mlbs)

    Gunnison Copper Cathode Produced (Mlbs) I-10 Gunnison WRF Pit WRF Crusher Leach Pad TSX: GCU / OTCQB: GCUMF / Frankfurt: 3XS0 All currency amounts in US dollars, unless stated otherwise 26

  27. Slide 27: Gunnison Deposit Mineral Resource Estimate

    Gunnison Deposit Mineral Resource Estimate Mineral Resource Estimate The Gunnison Deposit Mineral Resources are classified in order of increasing geological and quantitative confidence into Inferred, Indicated, and Measured categories in accordance with the “CIM Definition Standards – For Mineral Re

  28. Slide 28: Value Proposition

    Value Proposition: • One of America’s newest copper producers • Significant catalysts over next 6-24 months • Undervalued relative to peer valuation and M&A transaction info@GunnisonCopper.com TSX: GCU / OTCQB: GCUMF / Frankfurt: 3XS0 www.GunnisonCopper.com

Gunnison Copper — Investor Presentation (April 2026) on 6ix