    FORWARD-LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that ESGold Corp. expects to occur, are forward-looking statements. Forward-looking

  3. Slide 3: ESGold Overview

    ESGOLD OVERVIEW

  4. Slide 4: 2025 Outlook Value Drivers

    2025 OUTLOOK VALUE DRIVERS MONTAUBAN – ROAD TO PRODUCTION Projected is fully permitted to operate 1000m/t per day Merrill-Crowe closed circuit process system for processing tailings at Montauban Infrastructure in place includes steel structure building (16,000 ft2), Quebec Hydro power line and all a

  5. Slide 5: Business Overview

    BUSINESS OVERVIEW ESGold is a Canadian gold exploration company based in Vancouver, BC, focused on finding undervalued Canadian assets that are near-term revenue-producing and qualified as ESG Formed in 2004 and traded The company is developing the The Montauban Mine Property The company is also exp

  6. Slide 6: Management Team

    MANAGEMENT TEAM Paul Mastantuono Brad Kitchen André Gauthier CEO & Director President & Director Director » Started a transportation company in early 2000 » 35-year record consisting of investment banking and » Over 47 years of experience in the Mining Exploration and later focused on the transporta

  7. Slide 7: Management Team

    MANAGEMENT TEAM Tony J. Giuliano Edmond St-Jean Claude Duplessis Chief Financial Officer Mining Engineer, Consultant Senior Engineer, Consultant » Experienced financial executive having worked as » Over 30 years of experience as a mining engineer, » Senior Engineer with over 26 years of experience i

  8. Slide 8: Share Structure

    SHARE STRUCTURE Share Distribution Number of Description shares As of January 2025 5% 10% Total outstanding shares 52,314,300 Institutional Management Public Float Issued and Outstanding: 52,314,300 25% 60% Friends and Affiliates Options outstanding 2,030,000 ($0.71 avg price) Fully Diluted Issued a

  9. Slide 9: Montauban Project

    MONTAUBAN PROJECT

  10. Slide 10: The Montauban Project Site

    THE MONTAUBAN PROJECT SITE The property is located approximately 80 km west of Quebec City and 60 km north of Trois- Rivières, in the Montauban Township in the Portneuf County, Quebec w w w . e s g o l d . c o m 10

  11. Slide 11: The Montauban Site Opportunity

    THE MONTAUBAN SITE OPPORTUNITY ESGold has the opportunity to create significant asset value for its shareholders by processing the existing gold, silver and mica found in the toxic mine tailings while satisfying the corporate ESG objectives of removing the toxins and restoring the sites back to a na

  12. Slide 12: Montauban Highlights

    MONTAUBAN HIGHLIGHTS Highlights based on Tailings from Preliminary Economic Assessment (NI 43-101) Resource Prices in Current Market 2023 PEA Resource Prices PROJECT HIGHLIGHTS Gold Price (USD/OZ) $1,750 $2900 Silver Price (USD/OZ) $21 $32 » Fully permitted processing operations for 1,000 t/d mill M

  13. Slide 13: Tailings Mineral Resources at Montauban – PEA 2023

    TAILINGS MINERAL RESOURCES AT MONTAUBAN –PEA 2023 The mineral resources estimate for the Montauban and Notre-Dame-de-Montauban Tailings Au (g/t) Ag (g/t) Tonnes Au Oz Ag Oz MONTAUBAN TAILINGS Indicated 0.4 31 603,700 7,800 610,350 Inferred 0.34 28 292,000 3,150 258,900 NOTRE-DAME-DE-MONTAUBAN TAILIN

  14. Slide 14: Drilling at Montauban

    DRILLING AT MONTAUBAN The drill hole database contained 352 valid drill hole collars, with a total meterage of 1,654.04m and 1,170 assay intervals totaling 1,498.05m. For the Notre-Dame-de-Montauban tailings a total of 35 test pits and trenches totaling 77.44m were excavated. A total of 112 samples

  15. Slide 15: Near Surface Hard Rock Results - Map

    NEAR SURFACE HARD ROCK RESULTS -MAP Surface results - section 1310 N Grab Samples 1 11.90 g/t Au 31.4 g/t Ag 2 33.20 g/t Au 74.00 g/t Ag 3 1.20 g/t Au 25.00 g/t Ag † Source : Jacques Marchand Resource Evaluation Report ‡ Source : Izza Mineraux – Mirabel Resources w w w . e s g o l d . c o m 15

  16. Slide 16: Surface Pilar Resource Evaluation – Historical Report

    SURFACE PILAR RESOURCE EVALUATION –HISTORICAL REPORT Montauban deposit and area have not been explored with modern exploration technique Past producer has never focused on gold and silver VMS are clustered and suggests there is a strong potential to find other ones Zone MT Au (g/t) Ag (g/t) North Zo

  17. Slide 17: Montauban Mine Past Production

    MONTAUBAN MINE PAST PRODUCTION 1913-1944* 1948-1955* 1983-1990† tons zinc 77,000 39,600 - tons lead 24,000 15,600 - oz. gold 40,000 16,876 92,553 oz. silver 4,000,000 2,647,517 323,376 * Source : Jean Depatie for Boiville Ressources Ltd † Source : Genivar Inc. for MRNQ Anacon Shaft Entrance w w w .

  18. Slide 18: ESGold's Montauban Business Model

    ESGold’s MONTAUBAN BUSINESS MODEL ESGold Corp. has a viable solution, which encompasses the restoration of contaminated tailings sites and the extraction of precious metals including gold and silver as well as industrial minerals such as mica. ACQUISITION MILL FACILITY OPERATION & REVENUE NEW PRODUC

  19. Slide 19: ESGold Local Support

    ESGold LOCAL SUPPORT STRONG SUPPORT FROM STRONG SUPPORT FROM HIGH INTEREST FOR THE MUNICIPALITY, THE LOCAL POPULATION NEW GOOD PERMANENT MAYOR, ADMINISTRATION QUALITY JOB CREATION w w w . e s g o l d . c o m 19

  20. Slide 20: Work Completed to Date by ESGold

    WORK COMPLETED TO DATE BY ESGOLD Over $15M has been invested in developing the Montauban Project ESGold has obtained all the required permits to restore this contaminated site & has signed the required protocols with the municipality of Notre-Dame-de-Montauban The company has completed all the infra

  21. Slide 21: Montauban Plant Engineering Design

    MONTAUBAN PLANT ENGINEERING DESIGN w w w . e s g o l d . c o m 21

  22. Slide 22: Montauban Plant Site Plan

    MONTAUBAN PLANT SITE PLAN w w w . e s g o l d . c o m 22

  23. Slide 23: Montauban Plant Site Plan

    MONTAUBAN PLANT SITE PLAN Process mining residues, recover the precious metals (gold, silver and industrial metal muscovite (mica) and restore the site (decontaminate) through treatment and neutralization Secure private and public sector Upgrade the processing mill to financing to begin production a

  24. Slide 24: Corporate Directory

    CORPORATE DIRECTORY Paul Mastantuono Brad Kitchen CEO President 1 514 712-1532 +1 604 506-7555 pmastantuono@esgold.com bkitchen@esgold.com ESGold Corp. CSE: ESAU | OTCQB: info@esgold.com SEKZF | FSE: N2W 1500 – 1050 W Georgia St. www.esgold.com Vancouver, BC, V6E 4N7