Dome Gold Mines Ltd. · ASX:DME

Dome Gold Mines — Investor Presentation (March 2026)

25 slides from Dome Gold Mines's investor presentation, March 2026

  1. Slide 1: Dome Gold Mines

  2. Slide 2: Dome Gold Mines Ltd

    Dome Gold Mines Ltd An ASX-listed mineral exploration and development company with a wholly owned project portfolio in Fiji that offers short, medium and long-term value. IRON SAND + COPPER + GOLD | Slide 2

  3. Slide 3: Dome has focused its project portfolio on Fiji

    Dome has focused its project portfolio on Fiji due to its proven rich mineral deposits. Nadrau Fiji will play a strategic role in satisfying a growing global Sigatoka demand for minerals. | Slide 3

  4. Slide 4: Dome Projects Relative to other Significant Mineral Deposits

    Dome Projects Relative to other Significant Mineral Deposits Dome Project Areas Vatuloula Gold Mine (ex Other Gold/copper Emperor Gold Mines) Lautoka FIJI Explorers & Miners Nadrau Capital/major towns Tuvatu Gold Mine Nadi Nadrau SPL1452 SPL1452 Sigatoka Newmont Sigatoka ‘Thunder struck’ ‘Namosi’ JO

  5. Slide 5: Benefits associated with operating in Fiji

    There are a number of benefits associated with operating in Fiji: • World class mineral deposits and high exploration potential • Attractive royalty and taxation structure (25%) • Stable business environment • Reliable legal and financial systems • Skilled workforce and low-cost labour | Slide 5

  6. Slide 6: Mining is an integral part of Fiji’s economy

    Mining is an integral part of Fiji’s economy • Gold is one of Fiji’s most important exports • Mining and exploration covers gold, base metals, iron sand, bauxite, limestone/marble, aggregate, petroleum, natural gas and geothermal power • Fiji’s strategic geological setting on the Pacific Rim of Fire

  7. Slide 7: Fiji has a long mining history and high mineral prospectivity

    Fiji has a long mining history and high mineral prospectivity Namosi is one of the world’s largest undeveloped copper-gold deposits Vatukoula Gold Mine with approx. continues to operate. 8M oz gold 12M oz gold +8.6MT Copper The Tuvatu gold mine under construction by Lion One, a Canadian miner. | Sli

  8. Slide 8: Dome offers a well-balanced investment opportunity of wholly owned exploration assets

    Dome offers a well-balanced investment opportunity of wholly owned exploration assets Sigatoka Nadrau Iron Sand Gold/Copper Our two projects form a robust package which together can provide a long-term and profitable future. | Slide 8

  9. Slide 9: Sigatoka Iron Sands Project

    SIGATOKA IRON SANDS PROJECT SPL1495 (2,522 ha) Dome believes it is the best magnetite sand deposit in Fiji with a JORC 2012 resource estimate of 189.3M tonnes | Slide 9

  10. Slide 10: Sigatoka Project Area

    Sigatoka Project Area | Slide 10

  11. Slide 11: Sigatoka Iron Sands Project

    Sigatoka Iron Sands Project • JORC 2012 update completed • Products include magnetite (iron ore), construction sand and gravel • Resource includes very high-grade sector near river mouth • Earnings generated will drive organic corporate growth, with minimal dilution • Export markets exist across Asi

  12. Slide 12: Kulukulu South High Grade Sector

    KULUKULU SOUTH HIGH GRADE SECTOR ✓ This sector comprises 35 Mt @ 20% Heavy Minerals. ✓ This is sufficient for the first 7 years+ of mining. ✓ A strong economic benefit for the project. | Slide 12

  13. Slide 13: Sigatoka Iron Sands Project

    Sigatoka Iron Sands Project Production from Sigatoka requires only modest capital, uses conventional technology and will have beneficial environmental impacts. • Products are magnetite (iron ore), construction sand and gravel • Fiji-based steel producer has indicated strong interest in buying magnet

  14. Slide 14: Example

    Example Sand processing plant IHC sand mining dredge Mined sand is pumped to the Processing plant | Slide 14 Note: Not property of Dome

  15. Slide 15: Nadrau Copper-Gold Project

    NADRAU COPPER-GOLD PROJECT SPL1452 (33,213 ha) Nadrau has two porphyry copper-gold prospects; Namoli and Wainivau. They are large mineral systems, similar to those at the neighbouring Namosi deposits. | Slide 15

  16. Slide 16: Nadrau Copper-Gold Project

    Nadrau Copper-Gold Project • Early-stage exploration • Porphyry style copper-gold mineralisation has also been observed in outcrop • Targets defined by copper and gold geochemistry • Historic drilling (1970’s) at Wainivau intersected long intervals of anomalous copper mineralisation on margins of Do

  17. Slide 17: Significant gold deposits in the southwest Pacific

    Significant gold deposits in the southwest Pacific Dome Project Nadrau | Slide 17

  18. Slide 18: Dome’s path to success

    Dome’s path to success • Each of Dome’s projects is 100% owned by the Company • Each one is covered by an exploration tenement in good standing • Sigatoka is an advanced project, close to production and cash flow • Nadrau has world-class potential to be realised over the longer term • Dome has the r

  19. Slide 19: Dome is focused on creating wealth for its shareholders

    Dome is focused on creating wealth for its shareholders This can be expressed by appreciation in our share price and by the payment of dividends once sustainable cash flow is achieved. Major milestones in the creation of value are expected to be: • Commencement of production at Sigatoka • Discovery

  20. Slide 20: Dome aims to be the dominant player in the Fijian mining industry

    Dome aims to be the dominant player in the Fijian mining industry We will achieve success with our high-quality projects and by leveraging our strong Fijian credentials to financial and cultural advantage. We will pay our way with Sigatoka cash flow, thereby creating and retaining wealth for our sha

  21. Slide 21: Dome is on the cusp of success

    Dome is on the cusp of success We offer: • Near term cash flow – development of Sigatoka • Medium term excitement – discovery of copper & gold • Future dividends – from sustainable cash flow • Low downside risk, thanks to Sigatoka • Major upside due to: - Copper and gold at Nadrau | Slide 21

  22. Slide 22: Highly experienced board and management

    Highly experienced board and management CHAIRMAN DIRECTOR COUNTRY MANAGER FIJI EXPLORATION FIJI Jack McCarthy Tadao Tsubata Mohammed Semi Luvuiwai Geologist Investment Management Zaved Azad Geologist Geologist Landowner Relations DIRECTOR COMPANY SEC. We have an established and highly experienced Bo

  23. Slide 23: Dome Gold Mines Limited

    Dome Gold Mines Limited ABN 49 151 996 566 The Brewery, Suite 605, Level 6 Central Park Ave, Chippendale NSW 2008 GPO Box 1759 Sydney NSW 2001 Australia Web: www.domegoldmines.com.au Enquiries Jack McCarthy, Chairman E: jack@domegoldmines.com.au T: +61 2 8203 5620 | Slide 23

  24. Slide 24: Disclaimer

    Disclaimer This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation may not be distributed in

  25. Slide 25: Appendix: Tabulation of JORC 2012 resource estimates

    Appendix Tabulation of JORC 2012 resource estimates ATTACHMENT A SIGATOKA RIVER HM Cut-off: 8% DENSITY HM TONNES MAG1 %HM in 1 - 4mm 38 micron- %MAG1 in %V in %TiO2 in %Fe in %SiO2 in %Al2O3 in %P in %S in JORC Classification ZONE TONNES (Mt) %HM Feed +4mm Sand -38 micron (g/cm3) (Mt) TONNES (kt) Sa

Dome Gold Mines — Investor Presentation (March 2026) on 6ix