Triangle Energy (Global) Limited · ASX:TEG
Triangle Energy (Global) — Shareholder Meeting (November 2017)
16 slides from Triangle Energy (Global)'s shareholder meeting presentation, Nov 28, 2017

Slide 1: Oil Production in the Perth Basin
Oil Production in the Perth Basin CORPORATE PRESENTATION AGM Presentation 28 November 2017

Slide 2: Clearly Defined Growth Strategy
CLEARLY DEFINED GROWTH STRATEGY ▪ Australian based focus for future growth in oil and gas sector ▪ Majority interest (78.75%) in Cliff Head Oil Field with strong, predictable cash flows ▪ Offshore and onshore infrastructure essential for any exploration success in the region. Infrastructure has capa

Slide 3: Corporate Snapshot
CORPORATE SNAPSHOT Capital Structure and Key Metrics Operating Metrics ASX Code TEG 1,166 bopd (YTD average) Daily Production (78.75% TEG 918 bopd) Shares on issue1 192.4 million Unlisted options on Net Reserves5 2P Reserves - 2.7 MMstb 6 million issue exc @ 0.06, exp 29 March 2019 Substantial Share

Slide 4: TEG Share Price Performance
TEG SHARE PRICE PERFORMANCE January 2017 - November 2017 $0.25 6,000,000 Oil discovery confirmed at Xanadu -1 State Gas 5,000,000 Limited makes $0.20 Xanadu – 1 spuds ASX debut SHARE PRICE AUD 4,000,000 VOLUME $0.15 3,000,000 $0.10 Operational control 2,000,000 of Roc Oil Limited $0.05 1,000,000 $0.

Slide 5: Cliff Head Oil Field
CLIFF HEAD OIL FIELD Building a strong presence in the Perth Basin ▪ Triangle 78.75% interest and Operator; Royal 21.25% ▪ Located in Perth Basin ~ 300km north of Perth, 10km offshore in 15-20 m of water ▪ Predictable, strong production rates and cash flow ▪ Operator of onshore & offshore Infrastruc

Slide 6: Cliff Head Oil Field - Location
CLIFF HEAD OIL FIELD - LOCATION ▪ Two x 14km pipelines CHA to ASP ▪ Water depth of 15-20 metres ▪ Underexplored Perth Basin ▪ 300km north of Perth, WA. ▪ 40km south of Dongara 6

Slide 7: Cost Reduction Strategy
COST REDUCTION STRATEGY Significant savings achieved Sept 2017 ▪ Routine operating costs AUD/ USD/ Quarter significantly reduced (78.75% of JV) Bbl Bbl ▪ Further cost rationalisation Sales $4.679M $61.98 $48.93 strategies ▪ Operational efficiencies Routine Operating Costs $2.537M $33.60 $26.52 Non-R

Slide 8: Cliff Head – Production Upside
CLIFF HEAD – PRODUCTION UPSIDE Workover Program ▪ Preparing work program and budgets ▪ Targeting doubling production ▪ 9 slots, 5 production wells, 3 water injection wells Cliff Head Alpha Platform Development opportunities 8

Slide 9: Xanadu-1 JV
XANADU-1 JV Oil Discovery ▪ 30% participating interest ▪ Cost to drill AUD$7.0m (Triangle ~AUD$2.8m) ▪ Conventional oil play, 3 zones encounted ▪ Discovery notice lodged with the Department of Mines, Industry Regulation and Safety ▪ Oil discovery structurally similar to Cliff Head ▪ Ability to proce

Slide 10: Xanadu-1 JV – Structural Comparison
XANADU-1 JV – STRUCTURAL COMPARISON * Refer NWE announcement 29 October 2014 10

Slide 11: Xanadu-1 / Arrowsmith Proximity
XANADU-1 / ARROWSMITH PROXIMITY Arrowsmith Production Facility Cliff Head Oil Field Xanadu 1 Drilling onshore to offshore Proximity to ASP 11

Slide 12: State Gas Limited (PL 231)
STATE GAS LIMITED (PL 231) ▪ Triangle holds largest stake in State Gas with 35.47% equity interest worth ~$20.56 million at 28 November 2017 ▪ Queensland conventional gas appraisal asset with multiple hydrocarbon bearing horizons in Bowen Basin ▪ 60% interest in PL231(Reids Dome) ▪ State Gas market

Slide 13: State Gas Limited (PL 231)
STATE GAS LIMITED (PL 231) Image 1: Flaring of Aldinga East-1 drilled in November 1993 Image 2: PL231 May 2017 Map: PL231 regional map 13

Slide 14: Key Catalysts & Summary
KEY CATALYSTS & SUMMARY ✓ Majority 78.75% interest and Operator of Cliff Head ✓ Production upside with workovers and cost reductions ✓ Cliff Head Platform and the Arrowsmith Stabilisation Plant are the only offshore and onshore infrastructure operating in the Perth Basin ✓ ASP has the capacity to se

Slide 15: Triangle Energy Limited (ASX:TEG)
Triangle Energy Limited (ASX:TEG) Unit 7 589 Stirling Highway Cottesloe WA 6911 Australia E: info@triangleenergy.com.au T: +61 8 9286 8300 | F: +61 8 9385 5184 | W: www.triangleenergy.com.au

Slide 16: Disclaimer and Forward Looking Statements
DISCLAIMER AND FORWARD LOOKING STATEMENTS ▪ This Presentation is provided on the basis that Triangle Energy (Global) Limited (“Triangle” or the “Company”) nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any repre
Source: Internet Archive copy of triangleenergy.com.au
More decks from Triangle Energy (Global) Limited
Investor Presentation (April 2025)13 slides · Apr 7, 2025
Shareholder Meeting (November 2024)14 slides · Nov 14, 2024
Corporate Update (August 2024)14 slides · Aug 9, 2024
Investor Presentation (March 2024)18 slides · Mar 6, 2024
Investor Presentation (February 2024)17 slides · Feb 13, 2024
Good Oil Conference 202316 slides · Sep 6, 2023