Basin Uranium — Investor Presentation (March 2022)
16 slides from Basin Uranium's investor presentation, March 2022
Slide 1: March 2022 Presentation
In the Heart of the March 2022 Presentation World-Class Athabasca Uranium District CSE:NCLR | OTC:BURCF | FRA:6NP0 Basin Uranium Corp.
Slide 2: Disclaimer
Cautionary Note: This differ materially from those in (as that term is defined in which depends on various Disclaimer presentation includes certain statements that may be the forward-looking statements. Factors that policies of the CSE) accepts responsibility for the factors and implementation by th
Slide 3: Why Invest in Basin Uranium?
INVESTMENT HIGHLIGHTS Why Invest in Basin Uranium? Newest Explorer in Proximity to World- Strong Head Start Fully-Funded 2022 the Athabasca Basin Class Deposits Exploration Program Option to acquire up to 75% 25km SW of the McArthur Over C$3.0M in past Raised C$6.1M in two in the Mann Lake uranium R
Slide 4: The Future of Green Energy
Without an important contribution from nuclear power, the global energy WHY URANIUM? transition will be that much harder.” The Future FATIH BIROL of Green Energy IEA Executive Director1 In order to meet targeted world climate goals and combat today’s soaring oil and gas prices CO2-EQUIVALENT EMISSIO
Slide 5: Global Uranium Demand
1. www.spglobal.com/ 2. www.world-nuclear-news.org/ 3. www.apnews.com/ 4. www.bloomberg.com/ 5. www.news.yahoo.com/ URANIUM USAGE Global Uranium Operational Nuclear Reactors Demand Proposed, Planned or Under Construction Global demand for uranium is growing at the same time supply is becoming less c
Slide 6: World Leaders in Uranium Mining
Source: www.visualcapitalist.com/ URANIUM PRODUCTION World Leaders in Uranium Mining The Athabasca Basin is one of the premier uranium mining jurisdictions in the world with grades that are over 20x the global average. With known uranium resources of 606,600 tonnes of U3O8 (514,400 tU), in a mining-
Slide 7: Mann Lake Uranium Project
The Mann Lake project is comprised of 8,582 acres located in the eastern Athabasca Basin in northern Saskatchewan. Mann Lake Uranium Project HIGHLIGHTS: LOCATION: • Significant past exploration of • 25km SW of the McArthur over C$3.0 million including River Mine (largest high-grade two geophysical s
Slide 8: Previous Exploration
MANN LAKE URANIUM PROJECT Previous Exploration There has been Historic airborne mag, gravity limited drilling and EM identified a number testing the NW of prospective structures: structures. The • NE trending lineaments NE structures • NE and NW trending faults remain untested. P.8 Basin Uranium Cor
Slide 9: Exploration Targets
MANN LAKE URANIUM PROJECT Exploration Targets • Main NE trending • Bends appear to conductive corridors are concentrate uranium the main target as shown at Mann • Focus will be on first Lake to the east extending the corridors • Drilling to follow on further into the property the targets generated t
Slide 10: Wray Mesa Uranium Project
Wray Mesa Uranium Project HIGHLIGHTS: • Acquisition anticipated to close in late Q1/2022 • Comprised of 310 unpatented lode claims totaling 6,219 acres in San Juan County, Utah • Extensive infrastructure with access via Utah State Highway 46, power, water and located proximal to the town of La Sal •
Slide 11: Previous Exploration
WRAY MESA URANIUM PROJECT Previous Exploration Extensive historical exploration with over 495 holes drilled dating back to the late 1970’s with highlights including: • 4.2 ft grading 0.52% eU3O8 from 533 ft and 4.03 ft grading 0.37% eU3O8 from 546.5 ft (hole W-07-004) • 7.0 ft grading 0.94% eU3O8 fr
Slide 12: Work Program & Catalysts
MANN LAKE URANIUM PROJECT Work Program & Catalysts 2022 2022 2022 2022 Q1 Q2 Q3 Q4 Permitting underway for geophysical surveying and drilling Maiden drill program of over 5,000 metres EM Geophysics to further delineate basement conductors P.12 Basin Uranium Corp. CSE:NCLR | OTC:BURCF | FRA:6NP0
Slide 13: Management & Directors
Management & Directors Mike Blady Joel Leonard Tim Henneberry Kevin Ma Desmond Balakrishnan Jonathan Hamway CEO CFO Technical Advisor Director Director Director Mr. Blady is an entrepreneur Mr. Leonard is the founding Professional Geoscientist (P. Financial Advisory Inc. since Mr. Balakrishnan is a
Slide 14: Capital Structure
Capital Structure Shares (M) C$(M) Basic Shares 23.90 Working Capital 4.52 Warrants 4.05 ITM Warrants 0.08 Options 0.50 ITM Options 0.08 RSUs 0.93 Working Capital & Potential Proceeds 4.67 Fully Diluted 29.37 Market Cap 15. 10 Market capitalization as of Mar 2, 2022 CSE:NCLR Share Price (C$) Volume
Slide 15: Trading at a Big Discount to Other Explorers in the Athabasca Basin
PEER COMPS Trading at a Big Discount to Other Explorers in the Athabasca Basin BY MARKET CAPITALIZATION (C$M) $528 $228 $130 $116 $104 $74 $68 $57 $56 $41 $40 $38 $38 $36 $29 $23 $15 $15 P.15 Source: Capital IQ as of Mar 2, 2022 Basin Uranium Corp. CSE:NCLR | OTC:BURCF | FRA:6NP0
Slide 16: CSE:NCLR OTC:BURCF FRA:6NP0
CSE:NCLR OTC:BURCF FRA:6NP0 info@basinuranium.ca 1430 - 800 W Pender Street Basin Uranium Corp. www.basinuranium.ca Vancouver, BC, V6C 1L6