  1. Slide 1: Minerals for a sustainable future – Q4 2022 presentation

    Minerals for a sustainable future Q4 2022 presentation 07 February 2023

  2. Slide 2: Disclaimer

    Disclaimer This document has been used by Nordic Mining during an oral presentation. Therefore, this document is incomplete without the oral explanations, comments and supporting instruments that were submitted during the referred presentation. To the extent permitted by law, no representation or wa

  3. Slide 3: Agenda

    1. Introduction 2. Engebø Rutile and Garnet 3. Financial update Q4-2022 4. Q & A 3

  4. Slide 4: Q4 2022 Highlights

    Q4 2022 Highlights • Over 75% of project financing for the Engebø Project secured • Summons for extraordinary general assembly 3 March: Proposed Financing private placement of USD 66 million to secure the remaining financing • Groundworks progressing ahead of schedule Construction • Underground infr

  5. Slide 5: Engebø Rutile and Garnet

    1. Introduction 2. Engebø Rutile and Garnet 3. Financial update Q4-2022 4. Q & A 5

  6. Slide 6: Health & Safety

    Engebø Rutile and Garnet Health & Safety Key Performance Q4 Year to Target HSE status indicator date ▪ No injuries in Q4 and 2022 Lost time injuries (1/1 million working 0 0 <2,5* hours) ▪ Focus on correct use of protective equipment Total recordable injuries (1/1 million 0 0 <8,8* ▪ Several risk wo

  7. Slide 7: Engebø site construction status

    Waste rock/ stockpile Access road Open pit Ore shaft • Total staff of ~55 persons at site • Groundworks on schedule, work on concrete foundations to start in Q1-2023 • Access road 70% completed • Conveyor tunnel and crushing chamber 55% complete • Detail Engineering ongoing with all EPCs Process pla

  8. Slide 8: Groundworks on western part of process area close to ready for civil works

    Engebø Rutile and Garnet Groundworks on western part of process area close to ready for civil works 8

  9. Slide 9: Access road to mine service area ~70% completed

    Engebø Rutile and Garnet Access road to mine service area ~70 % completed 9

  10. Slide 10: Preparation for raise boring of vertical ore shaft started on top of deposit

    Engebø Rutile and Garnet Preparation for raise boring of vertical ore shaft started on top of deposit 10

  11. Slide 11: Ore conveyor tunnel from crushing chamber progressing, ~55% completed

    Engebø Rutile and Garnet Ore conveyor tunnel from crushing chamber progressing, ~55% completed 11

  12. Slide 12: Drilling confirms the expected geotechnical conditions in the ore

    Engebø Rutile and Garnet Drilling confirms the expected geotechnical conditions in the ore 12

  13. Slide 13: Sampling of drill cuttings has commenced for data gathering

    Engebø Rutile and Garnet Sampling of drill cuttings has commenced for data gathering 13

  14. Slide 14: Procurement of mechanical technology packages in process

    Engebø Rutile and Garnet Procurement of mechanical technology packages in process • December 8, 2022: NM partners with Metso Outotec for delivery of a comprehensive comminution package for Engebø Rutile and Garnet, comprising over 30% of the process equipment expenditure • Procurement to secure time

  15. Slide 15: Building the team - recruitment of key discipline managers ongoing

    Engebø Rutile and Garnet Building the team - recruitment of key discipline managers ongoing • Positive response from recent recruitment advertisements for key positions • Strong interest from competent applicants from both local and regional areas • The feedback so far is encouraging towards a diver

  16. Slide 16: Rutile demand remained firm in Q4 despite pause in pigment demand

    Engebø Rutile and Garnet Rutile demand remained firm in Q4 despite pause in pigment demand • The fourth quarter 2022 showed strong results for titanium feedstock producers. Rutile sales volumes exceeded production and prices for rutile continued to increase during the quarter • Lower pigment demand

  17. Slide 17: Titanium sponge production in increasing demand

    Engebø Rutile and Garnet Titanium sponge production in increasing demand • Titanium metal demand, being an important driver for rutile, remained robust due to the ongoing revival of air traffic, as well as demand for non-Russian products. • Titanium metal producers reported strong demand and increas

  18. Slide 18: Long-term offtake agreements signed for full production of rutile and garnet

    Engebø Rutile and Garnet Long-term offtake agreements signed for full production of rutile and garnet Rutile Garnet Global TiO2 Partner Global Partner on Garnet Binding offtake agreement signed in June 2022 Binding offtake signed October 2022 Binding offtake agreement signed January 2023 5-year agre

  19. Slide 19: Financial update Q4-2022

    1. Introduction 2. Engebø Rutile and Garnet 3. Financial update Q4-2022 4. Q & A 19

  20. Slide 20: Funding to continue Engebø early construction

    Financial update Q4-2022 Funding to continue Engebø early construction ▪ The Group’s balance sheet remains solid: o NOK 165 million in cash and cash equivalents at year-end, ensuring funding to continue Engebø construction until remaining equity financing is secured o Engebø construction expenditure

  21. Slide 21: Highlights and Q&A

    Highlights and Q&A Over /5% of project financing for the Engebo Project secured ~ Summons for extraordinary general assembly 3 March: Proposed private placement of USD 66 million to secure the remaining Groundworks progressing ahead of schedule Underground infrastructure works ongoing Offtake secure

  22. Slide 22: Consolidated income statement

    Appendix Consolidated income statement Q4-2022 Q4-2021 Acc.2022 Acc.2021 Unaudited Unaudited Amounts in NOK million Unaudited Audited - - Other income - 0.2 (2.9) (3.8) Payroll and related costs (11.7) (16.2) (0.1) (0.0) Depreciation and amortization (0.2) (0.1) (5.0) (12.1) Other operating expenses

  23. Slide 23: Consolidated statement of financial position

    Appendix Consolidated statement of financial position 31.12.2022 31.12.2021 Amounts in NOK million Unaudited Audited ASSETS 1 Early construction works in Q4 of around Evaluation and exploration assets - 28.8 NOK 120 million, capitalized under «Mine Mine under construction 1 288.4 - under constructio

  24. Slide 24: World's most climate friendly titanium feedstock

    Appendix World’s most climate friendly titanium feedstock Industry leader on GHG emissions1 Life Cycle Analysis proves superior rutile product2 Titanium producers analysis Global Warming Potential 3.3 Total Scope 1 and 2 Emissions vs Emission Intensity Emissions Intensity (tCO2e/t product) Total Emi

  25. Slide 25: Taking action for biodiversity

    Appendix Taking action for biodiversity Environmentally responsible • As a response to the United Nation’s goal to stop loss of biodiversity, Nordic Mining has adopted a goal of net biodiversity gain over the life of mine for the Engebø project • To achieve this, a Biodiversity Action Plan is under