    Kick-Off Meeting Task Force Local Redistribution of Injections and Offtakes May 15th, 2025

  2. Slide 2: Workshop Agenda

    Workshop Agenda A Setting the Scene & Context B Local Redistribution of Injections & Offtakes C Reference Context Creation D Wrap-up & Next steps

  3. Slide 3: Setting the Scene & Context

    -€ elia Setting the Scene & Context 96 + BR —__

  4. Slide 4: General need for transparency and dialogue as a key enabler for the Energy Transition

    General need for transparency and dialogue as a key enabler for the Energy Transition! 4

  5. Slide 5: In a complex electricity system, advanced methods and extensive dialogue are essential

    In a complex electricity system, advanced methods and extensive dialogue are essential for timely grid development! To (?) ~2025 ~2025 2050 Evolution towards net zero (RES, Electrification), energy autonomy (nuclear, …) and affordability From Focus on Market- & RES-integration Transitioning fossil f

  6. Slide 6: The new Task Force Local Redistribution of Injection & Offtake

    The new Task Force Local Redistribution of Injection & Offtake ? Why a new Taskforce? Grid capacities are critical to the economic & sustainable development of society Long lead times for grid development compared to residential and industrial development, making early accurate assumptions crucial W

  7. Slide 7: Planning

    Planning 2025 2026 May June July Aug Sep Oct Nov Dec Jan Feb W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 15/05 24/6 4/09 3/10 17/11 4/12 8/01 Public Consultation Workshop 3: Workshop 4: Workshop 5: Kick-Off & Workshop 1: Wor

  8. Slide 8: Meetings, Governance and rules

    Meetings, Governance and rules • The Task Force will meet at Elia’s headquarters, unless a different venue is decided on by the Chairman, in consultation with the members of the Task Force. • Participation to meetings through online platforms will be possible. • Meetings will be conducted in English

  9. Slide 9: Local Redistribution of Injections & Offtakes

    Local Redistribution of Injections & Offtakes 9

  10. Slide 10: Local Redistribution of Injections & Offtakes Agenda

    Agenda Local Redistribution of Injections & Offtakes 1. Grid development studies require translating macro-level scenarios into a local reference context through local redistribution Needs Detection Infrastructure Adaptation Dynamic portfolio management 2. Local redistribution Growth potentials capa

  11. Slide 11: Local redistribution geographically splits aggregated grid usage values

    Local redistribution is a process that geographically splits aggregated grid usage values, with the aim to assign a potential transmission grid connection point. Example: snapshot of grid model End 2022 Future target year ? Kick-Off | Task Force LRIO 11 Example for PV, Source: AdeqFlex2024-2034, Pla

  12. Slide 12: Grid development studies require translating macro-level scenarios into a local reference context

    Grid development studies require translating macro-level scenarios into a local reference context through local redistribution. Client connection studies follow a simplified process, but the principle of reference & local reference context remains applicable. Dynamic Macro-level Infrastructure Needs

  13. Slide 13: Local redistribution uses technology-specific methodologies

    Local redistribution uses technology-specific methodologies, that are depends on a variety of factors. 1 2 Aggregate National/Regional Redistributed Values Factors influencing additional uses or repartition keys for a certain target year for aggregates references - non exhaustive • Evolution of exis

  14. Slide 14: Several references for different studies

    Grid development studies require translating macro-level scenarios into a local reference context through local redistribution – Several reference for different studies. Dynamic Macro-level Infrastructure Needs detection portfolio Scenarios adaptation management Geographical redistribution 1 2 Best

  15. Slide 15: Several references for different studies (comparison)

    Grid development studies require translating macro-level scenarios into a local reference context through local redistribution – Several reference for different studies. 3 Local best estimate 2 Best estimate redistribution redistribution of forecasted profiles for forecasted profiles for all injecti

  16. Slide 16: Local redistribution and reference grid

    Grid development studies require translating macro-level scenarios into a local reference context through local redistribution. Dynamic Macro-level Infrastructure Needs detection portfolio Scenarios adaptation management Geographical redistribution 1 2 Best Estimate 3 4 Local best estimate Reference

  17. Slide 17: Uses of each reference

    Grid development studies require translating macro-level scenarios into a local reference context through local redistribution. 1 2 Best estimate Used for 4 redistribution of Reference Grid: • Identification of System Needs Target year power profiles forecasted profiles for Freeze of the updated • A

  18. Slide 18: Reservations and allocations lower than aggregated expected capacity

    Local redistribution: if reservations and allocations are lower than the aggregated expected capacity, growth potentials are used to compensate for the difference. For zone a For zone a 1 2A 3 2B 3 GW or TWh 1 Existing capacity 5c 5c Aggregated expected capacity at the 2 2 considered horizon + + 5b

  19. Slide 19: Growth potentials progressively filled by reserved and allocated capacities

    Local redistribution: growth potentials are progressively filled in by reserved and allocated capacities. After each reservation or allocation of capacity of a same technology and zone as the potential, zonal growth potential are adapted For zone a 1 2A 2B 3 *GW or TWh 1 Existing capacity 5c 5c 2 +

  20. Slide 20: Reservations and allocations above the expected capacity

    Local redistribution: case for which capacity reservations & allocations is above the expected capacity. For zone a For zone a 1 2A 3 2B 3 GW or TWh 1 Existing capacity 2 Aggregated expected capacity at the 2 considered horizon 4c 4 4c + + Expected growth on the considered 3 4b 3 4b horizon + Zone a

  21. Slide 21: Local referential for connection studies and growth potential vs pre-reserved capacities

    Example of local referential for connection studies & Difference between growth potential vs pre-reserved capacities. Example of connection studies (EOS-EDS) • 1 The scenarii building process, including public consultation on hypotheses, defines the evolution of the consumption and production to be

  22. Slide 22: Periodicity of studies using local redistribution

    The studies that use local redistribution and re-evaluation of local growth potential happen at different periodicities. Reference Grid Zonal Zonal Step where local infrastructure infrastructure redistribution is development development applied study A study X Added, removed or Added, removed or mod

  23. Slide 23: C. Reference Context Creation

    C. Reference Context Creation 23

  24. Slide 24: From Data to Decisions: Reference Offtake and Injection creation

    From Data to Decisions: Reference Offtake and Injection creation What: Injection and Offtakes for every node of the grid, categorized by technology and analyzed on an hourly basis for different target years How: By using advanced methodologies and products (macro to micro products, market flow-based

  25. Slide 25: The Reference Context constitutes expected injections or offtakes per hour and substation

    The Reference Context constitutes the expected injections or offtakes for each hour of the forecasted horizon, for each substation. Reference context hypothesis Load Grid Model static Macro scenarios Grid assumptions Reference inputs data management Offtakes Injection and Offtakes Based on metered d

  26. Slide 26: Offtake Reference Context built from existing offtakes and planned evolutions

    The Offtake Reference Context is built from existing offtakes, specific planned evolutions & redistributed aggregated macro targets. Example of a national consumption scenario Unknown location, remaining potential of a category is redistributed on existing offtakes per technology to meet macro targe

  27. Slide 27: Offtake Reference Context build steps

    The Offtake Reference Context is built from existing offtakes, specific planned evolutions & redistributed aggregated macro targets. Metered existing offtakes of the previous year Electric Vehicles Planned Evolution Redistributed aggregated targets Based on client scenarios - Variation of current co

  28. Slide 28: Injection Reference Context computed by economic dispatch

    The Injection Reference Context is computed by running an economic dispatch. The model includes Belgium and neighbouring countries, Belgium being subdivided into 22 parts. Market simulations use a flow-based methodology at bidding zone level and cover the European Union Input data (by subdivision) -

  29. Slide 29: D. The Bigger Picture

    -€ elia D. The Bigger Picture

  30. Slide 30: Geographical redistribution is part of an interlinked methodology package

    Geographical redistribution is part of a interlinked methodology Final portfolio photo for plan package for grid development. (after this, normally only minor updates in timings) 2025 2026 2027 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Public cons. Public cons. AdeqFlex Publication AdeqFlex 25 Publication

  31. Slide 31: E. Next Steps

    -€ elia E. Next Steps

  32. Slide 32: Next Steps

    Next Steps 2025 2026 May June July Aug Sep Oct Nov Dec Jan Feb W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 15/05 24/6 4/09 3/10 17/11 4/12 8/01 Public Consultation Workshop 3: Workshop 4: Workshop 5: Kick-Off & Workshop 1: W

  33. Slide 33: Public Consultation

    Public Consultation When? What? How? October 3rd, 2025 → Report describing the By email: November 17th, 2025 current redistribution usersgroup@elia.be methodologies Published on the Task Force’s webpage on October 3rd

  34. Slide 34: Call for Evidence

    Call for Evidence What? How? Follow-up Additional information that can Presentation in session – Integration in the Consultation improve the local redistributions Report, with Elia comments on their – Discuss of shared information to know integration in the future processes, such as: the view of the