Mcfarlane Lake Mining Limited · CSE:MLM

Mcfarlane Lake Mining — Investor Presentation (July 2026)

32 slides from Mcfarlane Lake Mining's investor presentation, July 2026

  1. Slide 1: Corporate Presentation July 2026

    PRODUCTION IN THE PRODUCTION IN THE CORPORATE PRESENTATION July 2026 CSE: MLM OTCQB: MLMLF FRA: W2Z CSE: MLM OTCQB: MLMLF FRA: W2Z 1

  2. Slide 2: Disclaimer

    DIS C L A IM E R DI S C L A IM E R Cautionary Note Regarding Forward-Looking Statements not been verified by any independent source, and the Company has not independently verified any third-party information. While the Company believes such third party information to be generally reliable, such info

  3. Slide 3: Our Vision and Our Mission

    McFarlane Lake is a Canadian gold company advancing the large-scale Juby Gold Project in Ontario – a district-scale opportunity with McFarlane Lake is a Canadian gold multi-million-ounce growth potential and a clear path to production. company advancing the large-scale Juby Gold Project in Ontario –

  4. Slide 4: Recent Developments

    Recent Developments Recent Developments • July 6/26 – C$6.2 Million Warrant Valuation – on the right path Exercise • May 28/26 - C$6.7 million investment +30% increase McFarlane Stock by Michael Gentile & Pierre Beaudoin inPrice valuation – 30% increase May 28 • Capital raised by the above transacti

  5. Slide 5: MLM Project Portfolio

    MLMPROJECTPORTFOL IO MLM PR OJE CT PORTFOL IO Advancing a 100%-owned portfolio of gold assets in Canada ON T A R I O Michaud/ FL A G S HI P A S S E T Munro • Juby Deposit • Big Dome Deposit Timmins PROJECT • Golden Lake Deposit • Hydro Creek Deposit Sudbury McMIllan/ Mongowan INFERRE D @ 0. 89 G/T I

  6. Slide 6: Juby is among Ontario's largest gold projects

    JU BY IS A MONG O NTAR IO’ S L ARG E ST G OL D PROJ EC T S TOTAL PROJECT RESOURCE (Moz AuEq)* PROJECT GRADE (g/t AuEq)* 1.00 A Top 10 Development-Stage Gold Project in Ontario 11.0 3.45 1.01 0.74 1.41 ~5.4 Moz MRE** @ US$3,750/oz 0.68 7.0 6.8 6.1 0.73 0.92 5.7 3.59 5.6 0.92 7.20 4.5 4.2 3.9 3.0 2.8

  7. Slide 7: Significant Value Disconnect

    SIG N IFIC AN T VA L U E D I SC ONN E C T RELATIVE VALUATION VERSUS CANADIAN DEVELOPMENT PEERS Based on ~4.2 Moz MRE** @ US$2,500/oz $65 $57 $7 0 $6 0 $50 $48 $5 0 $4 0 Peer Average: US$38/oz $35 $33 $3 0 $26 $25 $24 $8 $2 0 $1 0 $0 Gold X2 Galleon Gold Banyan Gold Troilus NeXGold Mayfair Gold McFar

  8. Slide 8: Ontario's Abitibi Region Mining Jurisdiction

    ONTAR IO’ SAB ITIB IR EGION ONTAR IO’ S AB ITIB I R EGION MINING Timmins JURISDICTION ONTARIO WORLD-CLASS INFRASTRUCTURE Established roads, power, and skilled labour support year-round exploration and low-cost development. PROVEN GOLD BELT Over 200 million ounces of historical Temiskaming production

  9. Slide 9: Juby: Project Snapshot

    JUB Y :P RO JE C TS N A P S H O T JUB Y : P RO JE C T S N A P S H O T LOCATION Near Gowganda, Ontario, Large-scale, near-surface gold system within the Abitibi Greenstone Belt with flexible pathways to production OWNERSHIP 100% McFarlane Lake STAGE Resource Definition – Completed MRE GEOLOGICAL SETT

  10. Slide 10: High-Grade Open-Pit Potential

    HIG H - GR AD EO P E N - PITPO T E N T IA L HI G H - GR AD E O P E N - PI T PO T E N T IA L | Conceptual HG Targets @ Juby Main Strategic open-pit starter option supports early production and cash flow generation RESOURCE CONTAINED RESOURCE CONTAINED CUT-OFF AU G/T CUT-OFF AU G/T CLASSIFICATION META

  11. Slide 11: In Pit Mineralization + Outside Pit Mineralization

    In Pit Mineralization + Outside Pit Mineralization In Pit Mineralization + Outside Pit Mineralization HYD R O CRE EK LE G E N D BI G D OME Pit Shell Isoshell (Au g/t) GO L D EN LA KE >2.00 0.25 – 2.0 JU BY DR I L L I N G H E R E Significant Potential to add more ounces CSE: MLM OTCQB: MLMLF FRA: W2Z

  12. Slide 12: Expanding Potential at Depth

    EX P A N D IN GP O T EN T IA LA TD EP T H EX P A N D IN G P O T EN T IA L A T D EP T H Open at depth with significant upside potential for continued resource growth. Open at depth with significant upside potential for continued resource growth. < 8.7 km > HYD R O CRE E K BI G D OME GO L D EN LA KE J

  13. Slide 13: Latest Drilling Results 2026

    Latest Drilling Results 2026 Mineralization Extension – Golden Lake Deposit Looking North CSE: MLM OTCQB: MLMLF 13

  14. Slide 14: Parallel Structures? Might be our best deposit yet

    Parallel Structures ? Might be our best deposit yet MO R E G O LD Parallel Structures ? Might be our best deposit yet A | 826 Zone 3.32 g/t over 22.35 m B | Byberg Mining Lease B D C C | Juby Mining Lease PARALLEL STRUCTURES? A D | CSE: MLM OTCQB: MLMLF FRA: W2Z 14

  15. Slide 15: New Targets – Might be our best Deposit Yet!

    New Targets – Might be our best Deposit Yet! Golden Lake Extension of 826 Zone to the Northwest Drill Targets 826 Drill Zone Targets Juby Surface Grab JU8-26-146 Samples JU8-26-145 Grab Samples JU8-26-144 CSE: MLM OTCQB: MLMLF 15

  16. Slide 16: Positioned for Major Resource Growth

    PO S IT IO N E D F O R MA J O R R E S O U RC E G RO W T H Juby’s size, geology, and setting provide the foundation for a multi-million-ounce expansion story. Juby’s size, geology, and setting provide the foundation for a multi-million-ounce expansion story. +10Moz MRE GROWTH POTENTIAL* 8Moz Potentia

  17. Slide 17: The Path to Production

    TH EP A THTOP R O D U C TIO N TH E P A TH TO P R O D U C TIO N Disciplined, phased approach to development – focused on de-risking each stage and building long-term value. 2025 2026 2026 2027 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q4 • Acquisition and Updated NI • Complete Phase 1 Infill & • Commence Phase 2 Infill &

  18. Slide 18: Juby bulk sample outcrop

    In Pit Mineralization + Outside Pit Mineralization In Pit Mineralization + Outside Pit Mineralization Juby bulk sample outcrop – HYD R O CRE EK top of a hill LE G E N D BI G D OME Pit Shell Isoshell (Au g/t) GO L D EN LA KE >2.00 0.25 – 2.0 JU BY CSE: MLM OTCQB: MLMLF FRA: W2Z 18

  19. Slide 19: Concept for extracting bulk sample at Juby

    Concept for extracting bulk sample at Juby “excavating hilltop” - potentially 1 or 2 HYD R O CRE EK LE G E N D benches. BI G D OME Pit Shell Approximately 50 m wide x (75-150 m) long X GO L D EN LA KE Isoshell (Au g/t) 5 m in depth >2.00 0.25 – 2.0 JU BY CSE: MLM OTCQB: MLMLF FRA: W2Z 19

  20. Slide 20: Community Engagement & Environmental Stewardship

    COMMU NI T YEN G AG EM EN TEN V IR ON MEN T A LS T EWA R D S HI P COMMU NI T Y EN G AG EM EN T & EN V IR ON MEN T A L S T EWA R D S HI P FIRST NATIONS ENGAGEMENT EMPLOYMENT & TRAINING • First Nations companies doing drilling at site • Prioritizing the employment of skilled First • Commitment to tran

  21. Slide 21: Capital Structure

    CA P IT A LS T RU CT U R E* CA P IT A L S T RU CT U R E* Ownership Structure CSE: MLM | OTC: MLMLF 15% Share Price** C$0.31 Market Capitalization C$151.6 million 41% 20% Shares Outstanding 489 million Warrants 146.8 million 24% Options 54.8 million Fully Diluted 690.6 million Management & Insiders S

  22. Slide 22: Why Invest: Positioned for Growth

    WH YIN V E S T WH Y IN V E S T McFarlane Lake Mining|Positioned for Growth McFarlane Lake Mining | Positioned for Growth STRATEGIC INVESTMENT BY MICHAEL GENTILE +90% METALLURGICAL RECOVERIES Gives Juby a significant catalyst into the gold market Conventional processing with high recoveries provides

  23. Slide 23: Appendix

    APPENDIX APPENDIX CSE: MLM OTCQB: MLMLF FRA: W2Z 23

  24. Slide 24: Contact: Mark Trevisiol, CEO

    Mark Trevisiol, CEO mtrevisiol@mcfarlanelakemining.com Investor Relations investors@mcfarlanelakemining.com CSE: MLM OTCQB: MLMLF FRA: W2Z CSE: MLM OTCQB: MLMLF FRA: W2Z

  25. Slide 25: Leadership Team with Proven Development Expertise

    Leadership Team with Proven Development Expertise Leadership Team with Proven Development Expertise EX EC U T IV E T EA M Mark Trevisiol Brad Boland Winston Whymark Andrew McLellan President, CEO, Chair of Board CFO, Corporate Secretary Manager Exploration Senior Geologist • 30+ years of experience

  26. Slide 26: Board of Directors

    Leadership Team with Proven Development Expertise Leadership Team with Proven Development Expertise BO A R D O F D IR E C T O R S Perry Dellelce Director Amanda Fullerton Director Deborah Battiston Director • Founder & Managing Partner, Wildeboer • VP, Legal & Corporate Secretary, GCM • CPA, ICD.D w

  27. Slide 27: Gold Price Sensitivities

    Gold Price Sensitivities RI S I N G G OL D PR I C E S Gold Price Sensitivities Present Huge (OP= Open Pit, UG= Underground, Mt= Millions tonnes, Moz= Millions Ounces, Au= Gold metal) Value Opportunity GOLD PRICE REVENUE FACTOR (RF) CLASSIFICATION CONSTRAINTS CUT-OFF GRADE (Au g/t) TONNAGE (tonnes) G

  28. Slide 28: Increasing Resources, Unlocking Value

    IN C R E A S IN GR E S O U RC E S ,UN L O C K IN GVA L U E IN C R E A S IN G R E S O U RC E S , UN L O C K IN G VA L U E Systematic drilling and data-driven targeting designed to expand the Juby resource and unlock the project’s full gold potential. ST RA TE GY ST RA TE GY ST RA TE GY Process Unsamp

  29. Slide 29: Juby

    JUBY JUBY Developing a Multi-Million-Ounce Large-scale, High-quality Gold Project on the Path to Production Gold System TIER-1 JURISDICTION, TIER-1 POTENTIAL Ontario’s Abitibi Belt offers premier infrastructure, clear permitting, and proximity to major producers. PROVEN LEADERSHIP & TRACK RECORD AT

  30. Slide 30: New Exploration Drill Targets

    ST R A T E G ICE X P L O RA T IO NT A R GE T S ST R A T E G IC E X P L O RA T IO N T A R GE T S TA R G E T 1 TA R G E T 2 New Exploration Drill Targets Juby East 2800m of strike length, under cover rocks 826 zone Hole JU-13-137 JU B Y D E P O S I T (3.2 g/t over 22.35 m all within 20 m from surface)

  31. Slide 31: Detail Mineral Resource Estimate

    Detail Mineral Resource Estimate DE F I N E D G O L D R E S O U R C E S Detail Mineral Resource Estimate within pit shell + underground shapes Provide a Strong (OP= Open Pit, UG= Underground, Mt= Millions tonnes, Moz= Millions Ounces, Au= Gold metal) Foundation for Growth CUT-OFF GRADE TONNAGE GRADE

  32. Slide 32: Notes to Mineral Resource Tables

    NO T E ST OM REFO RT AB L E S12 NO T E S T O M RE FO R T AB L E S 1 & 2 Note 1: Mineral Resource Statement Notes 7. The 0.25 g/t Au cut-off for OP and the 1.85 g/t Au cut-off for UG used for reporting is based on the following: 1. CIM definition standards were followed for the resource estimate. a.

McFarlane Lake Mining — Investor Presentation (July 2026) on 6ix