Enquest Plc · LSE:ENQ
Enquest — Investor Day (November 2013)
57 slides from Enquest's investor day presentation, Nov 15, 2013
Slide 1: EnQuest Capital Markets Day
EnQuest Capital Markets Day Delivering sustainable growth in reserves and production 15 November 2013
Slide 2: Agenda
Agenda Introduction and IMS Amjad Bseisu, CEO The Kraken Development Overview video Richard Hall, Head of Major Projects Andrew Thomson, GM Technical Alasdair MacInnes, Kraken Development Manager Jonathan Swinney, CFO Summary Amjad Bseisu, CEO
Slide 3: Repeatable strategy delivering success
Repeatable strategy delivering success 2013 production up 7.2% to end Oct’ Strong performance at all producing assets, especially Thistle Good operations progress, good development drilling results and good reservoir performance On track for guidance of 22,000 Boepd to 24,500 Boepd Kraken
Slide 4: Growth through the realisation of untapped potential
Growth through the realisation of untapped potential Technical leadership in integrated development Creating development value via: Heather/Broom Upgrading existing facilities Thistle/Deveron Newer technology, new seismic Field life GKA extensions Simplifying processes Infill drilling, subsu
Slide 5: EnQuest's North Sea assets
EnQuest’s North Sea assets At 30 June 2013, plus Avalon farm in, GKA acquisition, Kraken sanction 44
Slide 6: 2013 Production results by hub
2013 Production results by hub Up 7.2% to end of Oct’ year-on-year Net production (Boepd) 2012 2013 23,129 21,569 11,031 10,203 7,845 6,941 4,315 3,521 - 842 Thistle/Deveron The Dons Heather/Broom Alba Total 5
Slide 7: EnQuest Production – Thistle/Deveron
EnQuest Production – Thistle/Deveron All figures EnQuest net production (bopd) unless otherwise stated 20,000 A59 w/o due 3rd DOE pump complete online September September 18,000 16,000 A60/55 online August with good 14,000 productivity 12,000 A53/60 WI W/O 10,000 A57/58 Lower Ness perforations Plann
Slide 8: Production efficiency: EnQuest in top UKCS quartile
Production efficiency: EnQuest in top UKCS quartile Source: O&G UK research Relative company performances: oil portfolios Figure 7: Production efficiency performance by operator for all oil assets 7
Slide 9: Alma/Galia
Alma/Galia EnQuest Producer FPSO now in UK finishing yard, closer to the field In the field, subsea infrastructure is now in place with trees and manifolds hooked up, pipelines and umbilicals in place and risers and mooring systems pre-installed awaiting the arrival of the FPSO The EnQuest Produ
Slide 10: Greater Kittiwake Area, near Scolty/Crathes & Avalon
Greater Kittiwake Area, near Scolty/Crathes & Avalon 4.7MMboe reserves, additional production and a new hub Acquired 50% of: Kittiwake Grouse Mallard Gadwall Goosander ▪ EnQuest to operate The GKA fields have been developed as subsea tie-backs to a steel platform located at Kittiwake;
Slide 11: Beyond the UKCS
Beyond the UKCS Malaysia & Tunisia Malaysia Targets being matured for new exploration drilling in 2014 Prospects include Kitabu and Maligan, with operator’s estimates of prospective resources at 71 MMboe and 132 MMboe respectively Tunisia Acquiring 70% operating interest in the producing Didon
Slide 12: Cairngorm appraisal well
Cairngorm appraisal well Drilling started, scheduled to finish around end of the year Cairngorm discovery, located on the platform margin of the Viking graben Well 16/3a-11z drilled in 1990 encountered a 105m oil column in fractured granite with a most likely Oil-Down-To associated with rock typ
Slide 13: The Kraken development: EnQuest's sixth hub
The Kraken development EnQuest’s sixth hub, 137 MMboe gross Secures medium term reserves and production growth 82.2 MMboe net 2P reserves, increase of Kraken North c.60MMboe (20MMboe already booked) First oil in 2016/2017 Anticipated to more than double production levels Long field life, 2
Slide 14: Kraken summary
Kraken summary Richard Hall Head of Major Projects
Slide 15: The Kraken Development
The Kraken Development Video of the Kraken development plans Project overview Richard Hall, Head of Major Projects Subsurface Andrew Thomson, GM Technical Field development Alasdair MacInnes, Kraken Development Manager Economics Jonathan Swinney, CFO
Slide 16: Kraken overview
Kraken overview Delivering sustainable growth in reserves and production EnQuest’s sixth hub (after GKA) Working interest of 60% Over 80MMboe of net 2P reserves First oil in 2016/17 - net peak production in excess of 30,000 boepd Heavy oil with good flow characteristics A conventional de
Slide 17: Kraken overview
Kraken overview Block 9/2b 2 Fields Water Depth of 110m 350km NE of Aberdeen Heavy Oil Development, 14 Deg API Developing 137 MMbbls reserves Field area – 12 x 3.5 km approx 25 wells 16
Slide 18: Development concept selection
Kraken overview Development concept selection Primary options - FPSO (ship), FPSO (Sevan), Fixed platform, Jack-up (TGP500) FPSO – large process, areal extent of field, relatively remote location Lease – downside protection Minimum up-front capex – protect cash flow Duty holder is FPSO Con
Slide 19: Development plan and field layout
Kraken overview Development plan and field layout 4 integrated ‘Template/Manifold’ Type Drill Centres: 1 combined service manifold at the 4th drill centre 14 horizontal producers, 1000m All manifolds can accommodate 11 horizontal injectors, 1000m expansion / step out 2 single service int
Slide 20: Conversion FPSO
Kraken overview: Conversion FPSO Bumi Armada Berhad - hull secured Nominated Vessel MV Prisco Alcor Double hull DNV classed Suezmax tanker Length 275m Breadth 50m Depth 22.5m Delivered by HHI in September 2007 First 5 year Special Survey completed July 2012 19
Slide 21: SPS template – proven design
Kraken overview SPS template – proven design SPS Manifold spreader bar lift 20
Slide 22: SPS template (typical)
Kraken overview SPS template (typical) 21
Slide 23: Drilling and well planning
Kraken overview Drilling and well planning Drilling commences 2015 First oil 2016/17 Drilling continues to 2019 4 producers & 3 injectors at first oil 14 producers & 11 injectors total Horizontal wells with gravel packs in producers 22
Slide 24: Development Capex well established
Kraken overview Development Capex well established > 60% of Capex already awarded via firm contracts Drilling & Operator Wells Costs 23% 16% Subsea - Facilities - SPS FPSO 21% 15% Subsea - SURF 25% Operator Costs Net CAPEX to 1st Oil: $1.4 bn 11% Subsea - Drilling & SPS Wells 17% 43% Subsea - SURF
Slide 25: Development expenditure – Opex field life cost
Kraken overview Development expenditure – Opex field life cost (excludes FPSO lease) High Opex confidence using EnQuest asset benchmarking and “bottom-up” estimates OPEX Without Work-Overs: c.$15 per barrel Export Services & 10% Logistics 24% On & Offshore Labour & Maintenance, Support Mods & 34%
Slide 26: Development Plan
Kraken Development Plan 2017 1st Oil 25
Slide 27: Conventional development plan approach
Kraken overview Conventional development plan approach EnQuest is pursuing a conventional approach to Kraken development execution: New seismic/ 6 appraisal wells Extensive subsurface analysis Formal FEEDs for the FPSO and subsea integrated equipment ahead of sanction Leased FPSO contracting
Slide 28: Major contracts in place
Kraken overview Major contracts in place Major Contracts have been tendered and awarded/ close to award Subsea Production System(SPS) awarded in May and is progressing on schedule, with steel cut on initial templates and machining commenced on subsea xmas tree (XT) forgings FPSO Letter of Intent
Slide 29: Subsurface
Subsurface Andrew Thomson General Manager Technical
Slide 30: Kraken subsurface: Introduction
Kraken subsurface Introduction State of the art Geostreamer 3D seismic acquired and interpretation completed:- Can “see” the sand sands are 30 – 120 ft thick Palaeocene Heimdal III sands, deep water gravity flow deposit Not underlain by water Later phase of injectite formation High por
Slide 31: Summary of Kraken appraisal to date
Kraken subsurface Summary of Kraken appraisal to date Kraken has moderately viscous oil 9/2b-6 (Enquest 2013) ▪ 78 – 161 cp Samples 125cP Oil Other heavy oil comparisons: Alba 7 cp Captain 50-150 cp 9/2b-2 (Nautical 2007) Mariner Maureen 67 cp Found oil in Heimdal -I & -III. 78 cP oil, Not
Slide 32: 9/2b-5Z reservoir penetration & test
Kraken subsurface 9/2b-5Z reservoir penetration & test 31
Slide 33: 9/2b-6 well – Kraken North appraisal
Kraken subsurface 9/2b-6 well – Kraken North appraisal Drilling Reservoir Section CPI Encountered range of subseismic injectite features, 1’ – 25’ TVT, without problem Generally less complex than prognosed H3 Injectite Prognosed vs actual Overall reservoir section very close to prognosed depth
Slide 34: Kraken development layout
Kraken development layout Horizontal injector : Producer waterflood Development based upon 14 producers & 11 injectors Gravel packed producers - 1000m max length Standalone screen injectors – 1400m max length 33
Slide 35: STOIIP, reserves & recovery factor
Kraken subsurface STOIIP, reserves & recovery factor FDP STOIIP Produced RF% North 68 20 30% Central 85 38 45% South 268 89 33% Kraken Area 421 147 35% Conservative Recovery Factor Viscosity in cP Kraken Ultimate Recovery Factor from Heavy oil Fields 34
Slide 36: Gross production profile & reserves – FDP
Kraken subsurface Gross production profile & reserves – FDP MMstb South Central North Total Produced 89 38 20 147 Fuel 10 Sales 137 Gross Produced Oil stb/d 35
Slide 37: Upside Potential – Western Feature 2
Kraken subsurface Upside Potential – Western Feature 2, to be drilled H2 2014 WF2 (overlaying) WF1 Outline only Underlying surface – Heimdal I Depth Map WF-2 Map showing overlapping Heimdal features Well Objectives Appraise Heimdal 3 structure with mid case of 23 MMbbls STOIIP Appraise Heimdal 1 str
Slide 38: Field development
Field development Alasdair MacInnes Kraken Development Manager
Slide 39: Kraken field development overview
Kraken field development overview
Slide 40: Overall flow balance – basis of design
Kraken field development Overall flow balance – basis of design C3 Efficient process design Proven design Proven equipment High redundancy built in High operational uptime capability through field life 25 year design life 39
Slide 41: FPSO topsides layout
Kraken field development FPSO topsides layout Aft Laydown EOR Flare Oil Power WI & PF Oil Metering E-House Generation Pumps Separation KO Drum VFD Steam Mid-ships PW & SW Turret Fwd LER House Boilers Laydown Treatment Chemical Injection / Utilities Defined FPSO topsides layout 40
Slide 42: SPS scope of supply – established technology
Kraken field development SPS scope of supply – established technology Proven design Track record of system supply Repeatable arrangement Proven installation method 25 year design life Ongoing contract for delivery 41
Slide 43: Well design - lower completion
Kraken field development Well design - lower completion Conventional horizontal well design EnQuest track record of well delivery No 6 Well demonstrated and proved drilling feasibility 42
Slide 44: Hydraulic Submersible Pumps principle of operation
Kraken field development Hydraulic Submersible Pumps principle of operation Proven design Track record of operating 11 year run life Repeatable arrangement Operating experience with similar crude Robust in operation Full testing programme undertaken – dedicated test loop Contract awa
Slide 45: Development organisation in place
Kraken field development Development organisation in place Head of Major Projects Richard Hall Kraken Development Manager Alasdair MacInnes Commercial/ Project HSEQ Subsurface Facilities Engineering Drilling Contracts Services Commercial HSEQ Subsurface Facilities Project Projects Senior Drilling Ma
Slide 46: Financials
Financials Jonathan Swinney Chief Financial Officer
Slide 47: Kraken economics: 60% EnQuest working interest
Kraken economics 60% EnQuest working interest Gross production of 137 MMboe, net 82 MMboe Net capex to first oil is c.$1.4bn; gross capex to first oil c.$1.8bn Net capex for the project of c.$2.2bn for 60% WI and including carry of c.$320m Gross capex for the project approximately $3.2bn 2
Slide 48: Main gross assumptions, as per FDP
Kraken development Main gross assumptions, as per FDP Kraken South Kraken Central Kraken North Kraken Area total year oil prod water prod gas prod oil prod water prod gas prod oil prod water prod gas prod year oil prod water prod gas prod (stb/d) (b/d) (MMscf/d) (stb/d) (b/d) (MMscf/d) (stb/d) (b/d)
Slide 49: Kraken economics: 60% EnQuest working interest
Kraken economics 60% EnQuest working interest Total opex over 25 year life of c$2.8bn excluding FPSO leasing Equates to c.$20 per bbl over the life of the field, c.$5 per bbl at plateau production Including FPSO leasing opex c$30 per bbl FDP case, anticipated net IRR, in the high teens – ove
Slide 50: EnQuest corporate funding and finance outlook
EnQuest corporate funding and finance outlook EnQuest has entered into a new lending facility Committed 6 year $1.2bn facility underwritten by BNP Paribas and Scotiabank with accordion feature of a further $500m available with banks’ consent Full availability dependent on overall reserves; acc
Slide 51: Summary
ZKRAKEN Summary Amjad Bseisu CEO
Slide 52: Kraken summary
Kraken summary First new field development A proven field with large volumes in place and upside potential Regulatory approvals and major contracts in place Robust full cycle economics and long field life Using established technology Leveraging EnQuest’s core competencies
Slide 53: Delivering sustainable growth
Delivering sustainable growth Successfully implementing our strategy Exploiting our existing reserves Dons, Thistle/Deveron, Heather/Broom, Alba Making selective acquisitions Commercialising & developing discoveries Greater Kittiwake Area, Didon/Zarat Alma/Galia Converting contingent resources into
Slide 54: Q&A
Q&A 53
Slide 55: The EnQuest Team
The EnQuest Team Biographies Amjad Bseisu, Chief Executive Amjad holds a BSc Honours degree in Mechanical Engineering and an MSc and D.ENG degree in Aeronautical Engineering. From 1984 to 1998, Amjad worked for the Atlantic Richfield Company (ARCO), eventually becoming president of ARCO Petroleum Ve
Slide 56: The EnQuest Team
The EnQuest Team Biographies Richard Hall, Head of Major Projects Richard Hall graduated with a BSc in Chemical Engineering and spent the first 10 years of his career gaining experience with Operating oil companies (Amoco, Hess and Murphy Petroleum) in offshore field operations, engineering, project
Slide 57: Forward Looking Statements
Forward Looking Statements This presentation may contain certain forward looking statements with respect to EnQuest’s expectation and plans, strategy, management’s objectives, future performance, production, costs, revenues and other trend information. These statements and forecasts involve risk and