Sunshine Metals Limited · ASX:SHN

Sunshine Metals — Sunshine Gold — Investor Presentation (December 2020)

18 slides from Sunshine Metals's investor presentation, Dec 10, 2020

  1. Slide 1: Sunshine Gold Limited – Only the beginning

    For personal use only Sunshine Gold Limited Only the beginning 10 December 2020 ASX: SHN

  2. Slide 2: Disclaimer & Disclosure

    Disclaimer & Disclosure For personal use only This presentation includes forward-looking statements. When used in this document, the words such as "could", "plan", "estimate", "expect", "intend", "may", "potential", "should" and similar expressions are forward-looking statements. Although Sunshine G

  3. Slide 3: Corporate Overview

    Corporate Overview For personal use only Corporate Information (at re-listing) Board of Directors ASX Code • Corporate Overview SHN Damien Keys Managing Director Led teams to exploration success at Spectrum Metals, Black Cat Syndicate, Silver Share Price A$0.02 PhD (Struct. Geo), MAIG Lake Resources

  4. Slide 4: Summary

    Summary For personal use only • 100% owner of two exciting gold projects in Queensland – Triumph and Hodgkinson • Acquisition drivers • Near surface, historic goldfields, high grades • Big system potential • Under explored • Near to infrastructure and mining hub workforces • Ability to quickly asses

  5. Slide 5: Activity and Newsflow

    Activity and Newsflow For personal use only 5

  6. Slide 6: Project Portfolio

    Project Portfolio For personal use only TRIUMPH GOLD PROJECT • 15km² intrusion related gold system under shallow alluvial cover • Quality geochemical and geophysical datasets • 2 granted, 100% owned EPM’s, spanning 138 sqkm • RC drill rig currently drilling advanced prospect Bald Hill HODGKINSON GOL

  7. Slide 7: Triumph Gold Project

    Triumph Gold Project For personal use only • Located 50km south of Gladstone • Population ~ 50,000 • Large port and mining town • Two exploration leases covering 138 sqkm • Large intrusion related gold system • Located near the western boundary of the Wandilla Province. • Major gold deposits also lo

  8. Slide 8: Triumph Fault Architecture

    Triumph Fault Architecture For personal use only Gold anomalism in drilling over 6km of strike, coincident with zone of magnetic destruction 6km 8

  9. Slide 9: Triumph RC Drilling Campaign

    Triumph RC Drilling Campaign For personal use only • 7,500m Reverse Circulation (RC) drilling program commenced in November 2020 • Complete – Five holes for 496m ✓ at Bonneville prospect. Results expected early 2021. • Ongoing – 4,000m of Infill and Extensional drilling at Bald Hill West and Bald Hi

  10. Slide 10: Bald Hill Drilling

    Bald Hill Drilling For personal use only Infill drilling Bald Hill West to 20m x 20m, Central to 40m x 40m • Bald Hill Drilling 10

  11. Slide 11: Bald Hill Schematic

    Bald Hill Schematic For personal use only 11

  12. Slide 12: Hodgkinson Gold Project

    Hodgkinson Gold Project For personal use only • Comprised of 365 sqkm of tenure incorporating • Elephant Creek Gold • Peninsula Gold Copper • Campbell Creek Gold • Under explored – previously held for tungsten exploration • Multiple, shallow, high-grade gold vein systems mapped and drilled • Between

  13. Slide 13: Hodgkinson Regional Geology

    Hodgkinson Regional Geology For personal use only • In the Devonian Hodgkinson Province • Hosted by Whypalla Supersuite Granites and Hodgkinson Formation metasediments • Whypalla Supersuite contemporaneous with gold mineralising event • Large positions along major regional structure • 25 km of strik

  14. Slide 14: Hodgkinson Planned Exploration

    Hodgkinson Planned Exploration For personal use only • Air mag survey covering entirety of lease at 100m spacing • Thompson Aviation / Southern Geoscience ✓ • Planned June 2021: • Field mapping between Mount Carbine and Elephant Creek • RC drilling Peninsula • Beneath copper – gold gossan • Gossan r

  15. Slide 15: Investigator Copper Project

    Investigator Copper Project For personal use only • EM survey planned in June 2021 quarter • Comprised of two exploration licences (115 sq kms) • ~110km north of Mt Isa via Gunpowder Road, bitumen road access with mains power lines • 12km south Capricorn Copper’s Mt Gordon Copper Mine • Same stratig

  16. Slide 16: Summary

    Summary For personal use only • 100% owner of two exciting gold projects in Queensland – Triumph and Hodgkinson • Acquisition drivers • Near surface, historic goldfields, high grades • Big system potential • Under explored • Near to infrastructure and mining hub workforces • Ability to quickly asses

  17. Slide 17: Connect with us

    For personal use only Connect with us: Registered office Level 11 BGC Building, 28 The Esplanade, Perth, 6000 QLD office 3/50 Tully St, South Townsville, 4810 P +61 8 6424 9299 E admin@shngold.com.au W www.shngold.com.au Facebook Sunshine Gold Ltd 17

  18. Slide 18: Terms of Issued Capital

    Terms of Issued Capital For personal use only Details Listed Unlisted Escrowed to Total 11 Dec 2022 Fully paid ordinary shares 356,711,618 - 88,000,000 444,711,618 Unlisted Options @ $0.03 expiring 30 September 2025 - 71,000,000 - 71,000,000 Deferred Shares (vendors) expiring 30 September 2023: - Tr

Sunshine Gold — Investor Presentation (December 2020) on 6ix