Nexus Minerals Ltd. · ASX:NXM

Nexus Minerals — RIU Conference 2020

22 slides from Nexus Minerals's conference presentation, Sep 15, 2020

  1. Slide 1: RIU Conference Presentation

    For personal use only RIU Conference Presentation September 2020 www.nexus-minerals.com

  2. Slide 2: Disclaimer & Competent Persons Statement

    DISCLAIMER & COMPETENT PERSONS STATEMENT • This document contains forward looking statements. Forward looking statements are not based on historical facts, but are based on Nexus's current expectations of future results or events. These forward looking statements are subject to risks, uncertainties

  3. Slide 3: Company Snapshot

    COMPANY SNAPSHOT CORPORATE OVERVIEW BOARD AND MANAGEMENT For personal use only Nexus Minerals Limited ASX: NXM Chairman Mr Paul Boyatzis Shares 193 million Managing Director Mr Andy Tudor Non - Executive Director Dr Mark Elliott Share Price A$0.076 Non - Executive Director Mr Bruce Maluish Market Ca

  4. Slide 4: Targeting Discovery of Large Scale Gold Deposits in Western Australian Goldfields

    COMPANY SNAPSHOT TARGETING DISCOVERY OF LARGE SCALE GOLD DEPOSITS IN WESTERN AUSTRALIAN GOLDFIELDS For personal use only ➢ Strategic landholding in Eastern Goldfields, WA ➢ Saracen Mineral Holdings (Saracen ASX:SAR) ❑ Shareholder & JV Partner ➢ Highly Prospective Regional Tenement Package ❑ Pinnacle

  5. Slide 5: Project Locations

    PROJECT LOCATIONS Eastern Goldfields Western Australia Key Projects For personal use only ➢ Pinnacles Gold Project – 125km2 ➢ Wallbrook Gold Project – 250km2 Portfolio Projects ➢ Triumph Gold Project ➢ Mt Celia Gold Project Total Package 680km2

  6. Slide 6: Pinnacles Project

    PINNACLES PROJECT For personal use only Carosue Dam resources >5M ounces ➢ >125km2 of granted mining tenements ➢ Australia’s Gold “Heartland” ➢ Strong Gold Price ~A$2,500+/Oz 609,000t @ 4.0g/t Au for 78,000 ounces ➢ Surrounded by multi million ounce deposits ➢ Huge exploration upside ➢ Low cost expl

  7. Slide 7: Opportunity – Near Term Gold Production

    OPPORTUNITY – NEAR TERM GOLD PRODUCTION ➢ Pinnacles Contributing JV Nexus 90% / Saracen 10% (ASX:SAR) ➢ Project has JORC 2012 Combined Resource of 609,000t @ 4g/t Au for 78,000oz* For personal use only ➢ Open Pit Resource 159,000t @ 2.4g/t Au for 12,000 ounces ➢ Underground Resource 450,000t @ 4.6g/

  8. Slide 8: Pinnacles JV Mineral Resource

    PINNACLES JV MINERAL RESOURCE For personal use only No Ore Reserves have currently been defined on the Pinnacles JV Gold Project. There has been insufficient exploration and technical studies to estimate an Ore Reserve and it is uncertain if further exploration and/or technical studies will result i

  9. Slide 9: Pinnacles JV Scoping Study

    PINNACLES JV SCOPING STUDY Surface For personal use only 159,000t @ 2.4g/t Au for 12,000 ounces 80m 100m Scoping Study – Conceptual Open Pit followed by Decline and 20m Level U/G Development 450,000t @ 4.6g/t Au for 66,000 ounces 340m

  10. Slide 10: Wallbrook Gold Project

    WALLBROOK GOLD PROJECT ➢ 140km northeast of Kalgoorlie & immediately north of Saracen’s Carosue Dam Operations For personal use only ➢ Saracen commenced mining Porphyry Mining Centre – Sending ore to their Carosue Dam Operations Mill – 35km to the south ➢ 250km2 contiguous tenement package – Some 50

  11. Slide 11: Crusader Prospect

    CRUSADER PROSPECT ➢ Crusader Prospect 40 hole 4626m RC Drill program confirmed mineralisation style, alteration style and For personal use only gold grades along 600m strike zone; ➢ Crusader JORC 2012 Combined Mineral Resource; ➢ 2.17Mt @ 1.22g/t Au for 85,000 ounces* ➢ 54% of the mineral resource w

  12. Slide 12: Crusader Prospect

    CRUSADER PROSPECT --- Mineral Resource Envelope For personal use only Pit Optimisation Studies underway to drive next phase of exploration drilling

  13. Slide 13: Crusader Prospect

    For personal use only CRUSADER PROSPECT

  14. Slide 14: Templar Prospect

    TEMPLAR PROSPECT ➢ 4,000m RC Drilling commenced early August to infill Aircore lines and test depth extensions – multiple For personal use only holes best gold mineralisation intersected at eoh ➢ Templar 2019 Aircore program delineated a mineralised corridor 500m long x 80m wide; ➢ Line 1 (Southern

  15. Slide 15: Branches and Golden Dyke Prospects

    BRANCHES AND GOLDEN DYKE PROSPECTS Regional Exploration For personal use only ➢ 4,000m RC Drilling planned to follow up previous mineralised drill intersections; ➢ Historic Database Branches Prospect RC Drill Holes; ➢ Structurally complex area with significant silicification and alteration of host r

  16. Slide 16: Paint Prospect – The Opportunity

    PAINT PROSPECT – THE OPPORTUNITY Targeting “Karari Style” Mineralisation For personal use only ➢ Nexus RC Drill holes – Mineralisation hosted in variably hematite altered intrusive and host rocks ➢ Multiple zones of mineralised Au intersections ➢ 64m @ 0.32g/t Au (from 28m) ➢ 48m @ 0.36g/t Au (from

  17. Slide 17: Saracen's Karari Gold Mine – The Target Style

    SARACEN’S KARARI GOLD MINE – “THE TARGET STYLE” Karari Gold Mine Discovery* 1991 For personal use only ➢ 400m gold soil anomaly; ➢ RAB drilling identified >100ppb Au anomaly; ➢ Discovery hole ➢ 26m @ 0.13g/t Au (from 58m) Hosted in small felsic intrusive; ➢ 54m @ 0.21g/t Au (from 154m) Hosted in str

  18. Slide 18: Paint Prospect

    PAINT PROSPECT Nexus Geophysical Surveys - excellent vectors for mineralisation and drill planning ➢ High Resolution Ground Magnetics – Structure + anomalous magnetic lows within magnetic highs For personal use only ➢ Coincident GAIP Chargeability & Resistivity anomaly – Silicification and sulphide

  19. Slide 19: Wallbrook Gold Project – Planned Exploration Activities

    WALLBROOK GOLD PROJECT Planned Exploration Activities ➢ Historic data compilation across 250km2 tenure For personal use only ➢ Exploration strategy development ➢ Geological - Alteration - Structural mapping ➢ Analysis of new & historical geochemical datasets ➢ Modelling of new & historical geophysic

  20. Slide 20: Nexus Month Program

    NEXUS 6 MONTH PROGRAM For personal use only July Aug Sept Oct Nov Dec 2020 2020 2020 2020 2020 2020 Feasibility Study / Resource definition drilling / Geotechnical drilling / Environmental Pinnacles studies / Metallurgical testwork / Permitting………………... RC Drilling Crusader / Templar / Paint / Branc

  21. Slide 21: Summary

    SUMMARY Contact: Mr Andy Tudor For personal use only ✓ Highly Prospective and strategic landholding Managing Director ✓ Potential for near term cash flow – Pinnacles andy.tudor@nexus-minerals.com ✓ Active gold explorer in multi million ounce Au NEXUS MINERALS LIMITED ASX:NXM region – largely underex

  22. Slide 22: Appendix JORC Tables

    SUMMARY Appendix 1 JORC Tables For personal use only Pinnacles Combined JORC 2012 Mineral Resource Estimate Crusader Combined JORC 2012 Mineral Resource Estimate Saracen Mineral Holdings CDO Combined JORC 2012 Mineral Resource Estimate

Nexus Minerals — RIU Conference 2020 on 6ix