    Cautionary Statements Forward Looking Information & Estimates of Reserves and Resources Certain information contained in this presentation, including any information relating to Amulsar's expected future performance, is "forward looking". All statements in this presentation, other than statements of

  3. Slide 3: Amulsar Gold Project – Armenia

    Amulsar Gold Project – Armenia Compelling Asset Generating Value Through Construction • 100%-owned, emerging as a leading gold development project • Large scale operation to be Armenia’s largest gold mine • Low cost production profile benefiting from: • Conventional mining and processing • Low waste

  4. Slide 4: Amulsar Gold Project – Location

    Amulsar Gold Project – Location Exceptional Access & Regional Infrastructure • 170 km southeast of Yerevan • Located on Armenia’s primary infrastructure corridor • Paved access to site Georgia • Local workforce • High-voltage power on site • Internet connection in place Azerbaijan • Water on site fo

  5. Slide 5: Large Scale Oxide Deposit

    Large Scale Oxide Deposit Initial 10-Year Mine Plan from 2.4 Million Oz P+P Reserves • Pit design optimized at $912/oz gold; economic evaluation at $1,150/oz gold • Excellent operating profile • Waste : Ore ratio at 2.4 – including 26 million tonnes of inferred classified as waste • Life-of-mine gol

  6. Slide 6: Amulsar Feasibility Study

    Amulsar Feasibility Study Initial Capital Optimized at $369.9 Million • Capital efficiencies achieved • Site layout for constructability and operability • Crushing plant – supported by column leach tests and blast fragmentation study • Mine fleet aligned with ramp-up and stage of operations • Staged

  7. Slide 7: Amulsar Feasibility Study

    Amulsar Feasibility Study Amulsar Mine Profile and Economics Q4 2015 Operating Profile NI 43-101 Initial Mine Life (Years) 10.0 Annual Tonnes Processed 9,700,000 Waste : Ore Ratio 2.4 Gold Grade (g/t) 0.78 Gold Recovery 87.2% Annual Gold Produced (oz) 211,000 All-in Sustaining Costs ($/oz) $585 Econ

  8. Slide 8: Growth Potential

    Growth Potential Upside within Inferred Resource and at Depth • Resource conversion • Within current pits: 26 million tonnes at 0.57 g/t inferred • Optimizing to include inferred adds: 40 million tonnes at 0.73 g/t; mostly limited by drilling density • Open potential below pit limits (below East-Wes

  9. Slide 9: Project Financing

    Project Financing Flexible Financing Plan Nearing $440 Million  Equity • RCF / Orion: $ 80 million • Public Offering: $ 29 million • EBRD: $ 10 million  Term Loan & COF • Orion / RCF: $160 million • Libor + 6.5%; 5.5 year term US$ in Millions • COF @ Libor + 9.5% Equipment Leasing, $75 Equity, $11

  10. Slide 10: Mining, Access & Construction Rights

    Mining, Access & Construction Rights Strong Support for Amulsar Development at All Levels  National level rights fully approved • Mining Right through the Ministry of Energy & Natural Resources • Environmental Impact Assessment through the Ministry of Nature Protection • Technical Safety Program th

  11. Slide 11: Amulsar Project Design & Engineering

    Amulsar Project Design & Engineering Key Engineering Underway; Leveraging 2015 Value Engineering Heap Leach Facility • Most advanced from Value Engineering (Samuel) • Detailed engineering +80% complete Material Handling Systems • Vendor engineering reducing timelines (Sandvik) • Basic engineering by

  12. Slide 12: Drilling: 2016 Program

    Drilling: 2016 Program Multiple Objectives Supporting Mine Development & Upside • Infill Drilling: Convert inferred to indicated, bring down Tigranes/Artavasdes wall • Grade Control: 20 metre centers for early mine planning • Geotechnical: Confirmatory in key construction footprints Measured Indicat

  13. Slide 13: Early Works

    Early Works Clearing Path for Construction Start • Pipeline diversion from HLF footprint • Repair community water channel • Construction accommodations • Hotel renovation for accommodations, commissary and Jermuk offices • Preparing for temporary camp platform and utilities • On-site offices platfor

  14. Slide 14: Comparable Development Stage Companies

    Comparable Development Stage Companies Targeting to Re-Rate Central to Construction Strategy Further Upside – 13.2% 1.5x Implied Upside – 173.0% 1.3x 1.0x 0.9x 0.8x 0.8x 0.8x 0.7x P / NAV 0.6x 0.5x Senior Producer TMAC Roxgold Pretium Belo Sun Lundin Gold Pershing Gold Victoria Lydian Producer Marke

  15. Slide 15: Near and Mid-term Catalysts

    Near and Mid-term Catalysts Focus on Construction 2016 2017 2018 • Construction start with • Project construction • Ore to pad mass earthworks Heap leach facility • • Plant commissioning • Land acquisition & • Haul roads • First gold pour conversion • Crushing/screening • Ramp-up of gold • Project t

  16. Slide 16: Lydian International Corporate Summary

    Lydian International Corporate Summary • Ordinary Shares: LYD Trading Symbols • Publicly-trading Warrants LYD.WT • Ordinary Shares 699 million Share Capital • Publicly-trading Warrants 99 million • Unlisted Warrants 5 million Market Capitalization • Recent price of C$0.45 C$349 million • Sourced fro

  17. Slide 17: Board of Directors

    Board of Directors Development Oriented – Independent, Diverse Experience Gordon Wylie • 32 yrs mining experience • AngloGold-Ashanti Global (Non-Executive Director & Chair) • Exploration manager Howard Stevenson • 25 yrs global mining experience • Alacer Gold President & COO (President & CEO) • Mer

  18. Slide 18: Thank You

    Thank You Lydianinternational.co.uk | TSX:LYD

Lydian International — Investor Presentation (October 2016) on 6ix