Encounter Resources Limited · ASX:ENR

Encounter Resources — Shareholder Meeting (November 2015)

19 slides from Encounter Resources's shareholder meeting presentation, Nov 27, 2015

  1. Slide 1: Annual General Meeting

    For personal use only Annual General Meeting 27 November 2015 ASX : ENR

  2. Slide 2: Company Snapshot

    Company Snapshot Board Paul Chapman - Chairman Yeneena Project – Copper, Zinc For personal use only Will Robinson - Managing Director Peter Bewick - Exploration Director Jon Hronsky - Non-Executive Director Kevin Hart / Dan Travers - Company Sec. 155.6m Ordinary Shares (Top 40 shareholders hold 68%)

  3. Slide 3: 2015 Milestones

    2015 Milestones  Substantially extended mineralised zinc gossan at Millennium For personal use only  Discovered new copper prospect at Lookout Rocks South (Nifty Analogue)  Identified a new IOCG target at the Aria Prospect  Regained 100% interest in the 14km long BM1-BM7 copper system  Complete

  4. Slide 4: This time is different….probably not

    For personal use only This time is different….probably not 4

  5. Slide 5: Creating Value Through Greenfield Exploration

    Creating Value Through Greenfield Exploration…  Leading edge, under cover For personal use only greenfield exploration  Major land holding in proven Proterozoic Paterson Province  Sharing risk at appropriate points to maximise exploration upside  New copper and zinc discoveries made by ENR 5

  6. Slide 6: …in a New Search Space…

    …in a New Search Space…  Sand covered mineral belt with For personal use only proven fertility  Outcropping discoveries made in 1970-80s (Nifty, Telfer, Kintyre)  Minimal subsurface exploration activity up to 2005  Encounter has discovered two new mineral systems so far:  BM1-BM7 Copper  Mille

  7. Slide 7: …in a Region that Produces Big Deposits…

    For personal use only …in a Region that Produces Big Deposits… Northern Cu Corridor Opens • Farm-in with Antofagasta plc • Aria IOCG Prospect • Lookout Rocks South - Nifty Analogue Zinc Discovery at Millennium • High grade mineralisation in early drilling • Zinc system +3km long and open • HHM earni

  8. Slide 8: BM1 / BM7 – Copper Project

    BM1 / BM7 – Copper Project BM1 For personal use only Coherent zone of near surface Cu oxide mineralisation 10m @ 6.8% Cu from 32m* 16m @ 3.2% Cu from 26m 50m @ 1.1% Cu from 12m BM7 6 x 3km Cu mineral BM1-BM7system containing high grade Cu sulphide 5m @ 2.5% Cu from 388m* 140m @ 0.2% Cu from 144m (re

  9. Slide 9: BM7 – Extensive Zones of Copper Sulphide Mineralisation

    For personal use only BM7 – Extensive Zones of Copper Sulphide Mineralisation  The alteration and mineralisation A A’ vectors are strongest in the central section of BM7 down dip to the east of EPT2158 & EPT1717  Diamond drill hole EPT2271 completed in Nov 2015 200m down dip of EPT2158  EIS co-fu

  10. Slide 10: BM7 East Copper Prospect

    For personal use only BM7 East Copper Prospect  Alteration and mineralisation intersected in the shallow drilling is similar to what is seen in the immediate hangingwall of the Nifty copper deposit  No drilling has effectively tested this target at depth 10

  11. Slide 11: Untested Northern Copper Corridor Opens Up

    Untested Northern Copper Corridor Opens Up  Fishhook and Lookout Rocks Nifty Cu Telfer Au/Cu For personal use only (1981) (1972)  Shallow sand cover with minimal previous exploration  VTEM surveys completed 2013 & 2014 Lookout Rocks Lookout Rocks  First diamond drill program at Next Slide Millen

  12. Slide 12: Lookout Rocks Farm-in Activity - Jul to Oct 2015

    For personal use only Lookout Rocks Farm-in Activity - Jul to Oct 2015  Heritage Surveys (Aug/Sep) - Phase 1 and 2 drill lines - Aria Area Clearance No significant results  Aircore/RC drilling (Sep/Oct) No significant - 11 RC holes (1,724m) results - 22 AC holes (2,731m)  Gravity Survey – Aria (S

  13. Slide 13: Lookout Rocks South Prospect

    Lookout Rocks South Prospect  Seven shallow reconnaissance aircore/RC over a structural target For personal use only  Drilling confirmed Broadhurst Formation (Nifty host) stratigraphy  Broad intervals of moderate copper and lead anomalism strengthening to the east and towards the bottom of hole 

  14. Slide 14: Aria – IOCG Prospect

    Aria – IOCG Prospect  Detailed gravity survey completed Discrete density anomaly located on For personal use only  the margin of the previously identified magnetic anomaly  400m diamond hole completed EPT2276  EPT2276 intersected further hematite- altered, polymictic breccia Residual gravity wit

  15. Slide 15: Greenfield Zinc Discovery at Millennium

    For personal use only Greenfield Zinc Discovery at Millennium…  Large +3km long zinc system  First order structural address at intersection of major NE and basin forming NW structure  High grade mineralisation in early drilling  Hampton Hill Mining (HHM) earning up to 25% by providing up to A$2

  16. Slide 16: Massive zinc sulphides intersected in early drilling

    Massive zinc sulphides intersected in early drilling... For personal use only Brecciated and laminated massive zinc sulphide 0.7m @ 36.5% Zn Gossan zone from 408.9m to 419.2m in EPT2203 Gravity Image (refer ASX announcements 12 January 2015 & 17 June 2015) 16

  17. Slide 17: RC and Diamond Drill Program to Sept-Nov 2015

    RC and Diamond Drill Program to Sept-Nov 2015  6 RC drill holes completed in Sep/Oct For personal use only 2015  EPT2260 broad interval of weathered zinc mineralisation that has substantially extended the gossan zone - 70m @ 2.3% Zn from 182m to EOH  EPT2260 diamond tail and diamond hole EPT2278

  18. Slide 18: Yeneena - Australia's Next Great Mineral District?

    Yeneena - Australia’s Next Great Mineral District? Systematic frontier exploration to create enduring value For personal use only   Exposure to large scale copper and zinc exploration upside  Risk sharing at appropriate points to maximise return for ENR shareholders  Sound cash position with fun

  19. Slide 19: Disclaimer & Compliance Statement

    Disclaimer & Compliance Statement This presentation has been prepared by Encounter Resources Limited (“Encounter”). The information contained in this presentation is a For personal use only professional opinion only and is given in good faith. Certain information in this document has been derived fr

Encounter Resources — Shareholder Meeting (November 2015) on 6ix