Filo Mining Corp

Filo Mining — Investor Presentation (May 2023)

29 slides from Filo Mining's investor presentation, May 2023

  1. Slide 1: The world needs more Copper

    The world needs more Copper A Lundin Group Company Corporate Presentation – May 2023 filo-mining.com TSX: FIL | Nasdaq TSX: First FIL North | Nasdaq Growth First Market: North FILGrowth | OTCQX: Market: FLMMFFIL | OTCQX: FLMMF

  2. Slide 2: Cautionary Statement

    Cautionary Statement Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward- actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results looking statement

  3. Slide 3: Filo Mining Corp.

    Filo Mining Corp. Our Project Analyst Coverage Share Ownership Filo del Sol (100% interest) Our Purpose 32% Unlock a world-class copper asset for the green economy through responsible exploration. 46% Capital Structure 5% FIL TSX, Nasdaq First North 3% FLMMF OTCQX 14% $22.35 Share Price (CAD) 123.7

  4. Slide 4: Filo del Sol Project

    Filo del Sol Project Filo del Sol hosts a high-sulphidation epithermal copper-gold-silver deposit associated with a large porphyry copper-gold system. v Located in San Juan, Argentina & Chile  Vicuña – an emerging giant copper district  Mining Integration and Complementation Treaty for cross-borde

  5. Slide 5: Investment Highlights

    Investment Highlights Filo del Sol: Size, scale, grade… and scarcity Existing Cu-Au-Ag resource, backstopped by a robust oxide project Outstanding drilling results, extending continuous mineralization over 5km strike, 1km east-west, and almost 1.5km deep High-grade zone discovered in holes: FSDH041,

  6. Slide 6: Exploration Success

    Exploration Success Highlight holes FSDH032: FSDH041: total intercept of total intercept of 1,009m @ 0.95% CuEq 858m @ 1.80% CuEq FSDH046: FSDH054: total intercept of total intercept of 1,378m @ 0.71% CuEq 1,224m @ 1.26% CuEq FSDH055A: FSDH055C: partial intercept of total intercept of 64m @ 1,214 g/

  7. Slide 7: Slide Filo Mining

    7.5km Slide 7 Filo Mining | Corporate Presentation | January 2020

  8. Slide 8: Exploration Plans

    Exploration Plans 4 key exploration objectives this season Exploration to the North & South – find the edges of the system Aurora – Bonita Link – testing continuity between Zones Aurora Zone - focus on developing a comprehensive geological model Define the high-grade zone around Breccia 41 Filo | th

  9. Slide 9: Aurora – Bonita Link

    Aurora – Bonita Link 2023 MT Survey North  Magnetotelluric Survey – 2023 Tamberias Filo del Sol  Drape – 600m below surface  Pink is more conductive Flamenco  “Blue drill hole traces” are planned future holes to test Aurora potential for these two zones to Bonita connect Gemelos Filo | Corporate

  10. Slide 10: Next Steps & Outlook

    Next Steps & Outlook Our most ambitious program ever What’s next:  Currently 9 drills active on site  Operating plan will drill an estimated 40,000m in 2023  Data collected will be used to develop a comprehensive geological model; guiding further exploration and an eventual updated resource estim

  11. Slide 11: Our Commitment – Multi-decade Presence in the Region

    Our Commitment – Multi-decade Presence in the Region Supported by the Lundin Foundation  Strong historical ESG commitment in the region lays the groundwork for responsible mineral development Priorities Climate & Safe & Diverse Workplace Good Governance Community Trust Environmental Stewardship UN

  12. Slide 12: Exploration

    Exploration Filo | the world needs more copper 12

  13. Slide 13: Filo del Sol: Geology

    Filo del Sol: Geology A cluster of mineralization  Clustering of different types of mineralization styles all in one deposit  Repeated, overlapping episodes of mineralization  Rare, large scale copper mineral upgrading process  A dumping ground for copper, gold & silver Filo | the world needs mo

  14. Slide 14: Vertical Sections (East-West)

    Vertical Sections (East-West) +400m North +200m North Filo | the world needs more copper 14

  15. Slide 15: Filo del Sol: Size & Grade

    Filo del Sol Size & Grade Hole-ID From (m) Filo To–(m) Length (m) Cu % Au g/t Ag g/t CuEq %1 FSDH041 188.0 7km 1,046.0 858.0 0.86 0.70 48.1 1.80 incl 376.0 1,046.0 670.0 1.07 0.85 60.9 2.23 incl 780.3 943.3 163.0 2.31 2.07 183.0 5.43 and incl 780.3 864.0 83.7 3.13 2.40 272.2 7.27 4.1% Cu, 4.4 g/t Au

  16. Slide 16: Filo del Sol: Copper-Gold-Silver

    Filo del Sol: Copper-Gold-Silver Silver Zone: Results from FSDH055A (Jan 12, 2022)  Drilling over the past two 64m @ 1,214 g/t Ag seasons has extended the known, flat-lying silver zone over more than 3km strike  FSDH055A retuned this highest- grade intersection on the project to date: 64m @ 1,214

  17. Slide 17: Vicuña: A Giant Copper District in the Making

    Vicuña: A Giant Copper District in the Making When you find something big, think bigger Giant in size, rare by nature  Vicuña is an emerging giant copper-gold silver district controlled by Lundin Group companies Long runway of value creation  A portfolio of world-class Cu-Au-Ag projects from PFS t

  18. Slide 18: Top Undeveloped Copper Projects

    Top Undeveloped Copper Projects By contained copper equivalent Grade (%) Cont. Metal (Mt) Asset Ownership Location Tonnage (Mt) Cu CuEq Cu CuEq Pebble Northern Dynasty Alaska 10,910 0.34% 0.62% 36.9 67.8 KSM Seabridge British Columbia 11,042 0.22% 0.53% 24.8 59.0 Resolution Rio Tinto (55%) / BHP (45

  19. Slide 19: Contact Us

    Contact Us Filo Mining Corp. Suite 2000 - 885 West Georgia Street Vancouver, BC, V6C 3E8 Canada For more information contact Trevor D’Sa Robert Eriksson Investor Relations Canada Investor Relations and Media Sweden info@filocorp.com reriksson@rive6.ch +1 604 689 7842 +46 70 111 2615 filo-mining.com

  20. Slide 20: Appendix

    Appendix Filo | the world needs more copper 20

  21. Slide 21: Why Copper?

    Why Copper? Copper fundamentals are strong:  Lack of Investment: coming out of a cycle of depressed copper prices, limited new copper discoveries  Demand driven by Electrification, Infrastructure: copper is the “Green” metal; infrastructure stimulus on the back of the pandemic  Declining head gra

  22. Slide 22: Management

    Proven Track Record Expertise & leadership drawn from the Lundin Group of Companies Management JAMIE BECK IAN GIBBS BOB CARMICHAEL ARNDT BRETTSCHNEIDER TREVOR D’SA DIEGO CHARCHAFLIE President & CEO CFO VP Exploration VP Operations & Projects VP Corp Dev & IR South American GM Former VP, Corporate Se

  23. Slide 23: Filo del Sol: 2023 PFS Results Summary (Oxides only)

    Filo del Sol: 2023 PFS Results Summary (Oxides only) After-Tax NPV (8%) After-Tax IRR Avg. Annual Cu Production Cu US$1.3bn 20% Copper 66 kt Initial Capital Payback Avg. Annual Au Production Au US$1.8bn 3.4 Yrs Gold 168 koz Avg. Annual Ag Production Ag C1 Cash Cost (CuEq) US$1.54/lb Silver 9,256 koz

  24. Slide 24: Filo del Sol: PFS Results – February 2023

    Pre-feasibility Results (Oxides only) Filo del Sol: PFS Results – February 2023 PFS Metals Prices Assumed Annual Metal Production Profiles Pre-Tax NPV (8%) ($B) $2.04 Payable Copper (kt) Cu $3.65/lb 100 Pre-Tax IRR (%) 24% 80 60 After-Tax NPV (8%) ($B) $1.31 Copper 40 After-Tax IRR (%) 20% 20 Undisc

  25. Slide 25: Pre-feasibility Layout

    Pre-feasibility Layout Filo | the world needs more copper 25

  26. Slide 26: Indicated and Inferred Resource

    Indicated and Inferred Resource Cu 3.2 Billion lbs Cu Indicated Cu Copper Inferred 1.3 Billion lbs Au 4.6 Million oz Au Indicated Au Gold Inferred 2.1 Million oz Ag 160.4 Million oz Ag Indicated Ag Silver Inferred 50.3 Million oz Refer to slide 26 for additional details regarding the reporting of th

  27. Slide 27: Mineral Resource

    Mineral Resource Zone Cutoff Category Tonnes Cu Au Ag Lbs Cu Ounces Au Ounces Ag (millions) (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 362.2 0.34 0.33 13.3 2,683 3,839 154,670 Oxide * See notes Inferred 132.7 0.25 0.30 9.9 725 1,284 42,370 Indicated 70.4 0.31 0.35 2.5 473 790 5,710

  28. Slide 28: Mineral Reserve

    Mineral Reserve Filo del Sol mineral reserve statement (@ 0.01 $/t nvpt cut-off) Tonnage Grade Contained Metal Category (all domains) (Mt) Cu (%) Au (g/t) Ag (g/t) NVPT ($/t) Cu (M lbs) Au (K oz) Ag (K oz) Proven _ _ _ _ _ _ _ _ Probable 259.6 0.39 0.34 16.0 32.50 2,220 2,867 133,334 Total Proven an

  29. Slide 29: Lundin Group: A history of creating value for shareholders

    Lundin Group A history of creating value for shareholders in Argentina The Lundin Group of Companies has a record of creating substantial value for shareholders. Past projects have generated some $15.8 billion. Shareholder Return on Investment* 1757% 1041% 1091% 961% 850% 558% 609% 352% 139% Lundin

Filo Mining — Investor Presentation (May 2023) on 6ix