Brixton Metals Corporation · TSXV:BBB
Brixton Metals — Investor Presentation (May 2026)
26 slides from Brixton Metals's investor presentation, May 2026
Slide 1: A Multi Generational Opportunity
HEADLINE HERE TSX-V:BBB | OTCQX: BBBXF | FR: 8BX1 Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It h
Slide 2: Safe Harbour Statement
SAFE HARBOUR STATEMENT Information set forth in this presentation involves forward-looking statements, including but not limited to comments regarding planned drilling and other exploration, identification of new targets, timelines, predictions and projections. Forward-looking statements are stateme
Slide 3: Our Team
OUR TEAM GARY THOMPSON, P.Geo. CALE MOODIE, BSF, CPA, CA MICHAEL RAPSCH CHAIRMAN & CEO CFO & DIRECTOR VICE PRESIDENT, INVESTOR RELATIONS • 30 years in resources including 19 years in public markets • Founder of Brixton, former CFO of Underworld Resources • 20 years experience in IR, Corporate Commun
Slide 4: Brixton Strategy
BRIXTON STRATEGY Silver-Copper-Gold Backed By Strategic Monetizing Discoveries Ahead Investors Non-Core Projects • Advancing its flagship Thorn • Strategic investment by • Hog Heaven Project: Project in BC, Canada BHP, the world’s largest • Option to earn 75% miner • Advancing its high-grade • Atlin
Slide 5: Share Structure
SHARE STRUCTURE BHP INVESTMENTS CANADA TSX Venture Exchange BBB CRESCAT CAPITAL Share Price (May 19, 2026) C$0.79 GOEHRING & ROZENCWAJG IVANHOE ELECTRIC Market Capitalization C$59M MANAGEMENT Shares Outstanding 74.2M US GLOBAL INVESTORS GOLD 2000 (KONWAVE AG) Warrants 20.2M AZVALOR ASSET MANAGEMENT
Slide 6: Projects
PROJECTS Advancing exceptional copper, gold and silver projects that fuel global progress, support clean energy, and create lasting value for generations to come. BRIXTON METALS INVESTOR PRESENTATION PAGE 6
Slide 7: Project Locations
PROJECT LOCATIONS BRIXTON METALS INVESTOR PRESENTATION PAGE 7
Slide 8: Langis Silver Project
LANGIS SILVER PROJECT • Two past producing, high-grade silver mines located 500 km from Toronto, Ontario, Canada • LANGIS MINE past production of 10.4 Moz Ag at 25 opt • HUDSON BAY MINE past production of 6.4 Moz Ag at 123 opt • Langis Mine was in operation from 1908 to 1989; closed in 1990 due to l
Slide 9: Langis Silver Project – 2026 Drill Program
LANGIS SILVER PROJECT – 2026 DRILL PROGRAM Core from LM-26-289 and LM26-350 Core from LM-26-290 at 115.25m BRIXTON METALS INVESTOR PRESENTATION PAGE 9
Slide 10: Langis Silver Project – 2026 Drill Program
LANGIS SILVER PROJECT – 2026 DRILL PROGRAM • Ongoing surface drilling of up to 60,000 metres toward a maiden mineral resource estimate • Exploration Target (*): 1-2 MT at 400 g/t to 800 g/t silver • Explore for new silver mineralization in and around historical workings and drill test new target are
Slide 11: Langis Silver Project – Cross Sections
LANGIS SILVER PROJECT – CROSS SECTIONS Drill hole LM-26-305 Drill hole LM-26-350 BRIXTON METALS INVESTOR PRESENTATION PAGE 11
Slide 12: Langis Silver Project – Drill Hole LM-26-290
LANGIS SILVER PROJECT – DRILL HOLE LM-26-290 (From 111m to end of hole at 123.35m) (terminated upon intersecting historic mine working) BRIXTON METALS INVESTOR PRESENTATION PAGE 12
Slide 13: Langis Silver Project – Tailings Recovery Work Program
LANGIS SILVER PROJECT – TAILINGS RECOVERY WORK PROGRAM • Drill 25x25m grid for the tailings assessment • Approx. 402 samples to quantify silver content within the tailings (including grade) • Commence work program in May, anticipating initial assays by June/July • Previous grab samples have returned
Slide 14: Langis Silver Project – Previous Drilling Highlights
LANGIS SILVER PROJECT – PREVIOUS DRILLING HIGHLIGHTS Previously significant drilling highlights, 2016-2022 • Brixton has collared 288 holes and drilled 40,315 between 2016 and 2022 • Drilling has intersected more than 220 intervals of >100 g/t silver • Other drilling highlights yielded 15 intercepts
Slide 15: Thorn Project
THORN PROJECT The Flagship wholly owned. • Located on trend with BC’s prolific Golden Triangle • In partnership with the Taku River Tlingit and Tahltan First Nations • Easy access via 45-minute flight from Whitehorse, YT • A massive 2,945km2 claim block • Potential access to US tide waters • Golden
Slide 16: Thorn Geochemistry Footprint
THORN GEOCHEMISTRY FOOTPRINT Gold Geochemistry Copper Geochemistry BRIXTON METALS INVESTOR PRESENTATION PAGE 16
Slide 17: Trapper Drilling, Sampling & Target Areas
TRAPPER DRILLING, SAMPLING & TARGET AREAS A 4km gold in soils anomaly outlines the Trapper Gold Target Drilling has been focused in the central and southeast areas BRIXTON METALS INVESTOR PRESENTATION PAGE 17
Slide 18: Trapper Gold Target
TRAPPER GOLD TARGET Gold mineralization is associated with base metal veins (BMS) Highest grade gold mineralization is at or near the diorite-volcanic contact Visible Gold Hosted in BMS vein BMS vein in Porphyry Feldspar BRIXTON METALS INVESTOR PRESENTATION PAGE 18
Slide 19: Trapper Visible Gold in Drill Core
TRAPPER VISIBLE Visible Gold Hosted In Diorite Visible Gold Hosted In Diorite GOLD IN DRILL CORE Highest grade gold mineralization is at or near the diorite-volcanic contact Visible Gold Hosted in BMS vein Visible Gold Hosted in BMS vein THN22-205 @ 151.75m of 249 g/t Au over 0.25m THN22-237 @ 159.7
Slide 20: Camp Creek High Sulphidation Targets & Drilling
CAMP CREEK HIGH SULPHIDATION TARGETS & DRILLING Camp Creek High Sulphidation, Near Surface Veins • During 2025 campaign: Newly identified northeast structural trend, “Northside vein” and extension of known “Glenfiddich vein” • Hole THN25-318 intercepted 1.5m of 9.5 g/t gold, 13.8% copper, 771 g/t si
Slide 21: Camp Creek Porphyry Drilling Highlights
CAMP CREEK PORPHYRY DRILLING HIGHLIGHTS A 2021 blind discovery THN11-60 95m of 628 g/t Ag, 1.7 g/t Au, 5.8% Zn+Pb, 0.12% Cu Copper Equivalent (CuEq) is calculated based on US$ 4.02/lb Cu, US$ 2105.6/oz Au, US$ 25.16/oz Ag, $US 20.99/lb Mo. These prices represent the approximate metal prices and calc
Slide 22: Catalyst & Tempest – New Discoveries 2025
CATALYST & TEMPEST – NEW DISCOVERIES 2025 Catalyst Porphyry Target is located approx. 6 km northeast from the Camp Creek Porphyry system • During 2025 campaign five holes were drilled at Catalyst confirming a broad hydrothermal system with porphyry-style alteration and veining • Hole THN25-343 inter
Slide 23: Catalyst – New Discovery 2025
CATALYST – NEW DISCOVERY 2025 • The new copper-gold porphyry discovery identified mineralization from surface combined with a large geochemical and geophysical footprint • Copper/Gold 1/1 ratio • Mineralization remains open in multiple directions: room for expansion and higher grades • B-A veins wit
Slide 24: BC's Premier Porphyry Target, World's Largest Miner, Ongoing Drill Program
BC’S PREMIER WORLD’S LARGEST ONGOING DRILL TRUSTED BY PORPHYRY TARGET MINER, BHP INVESTED PROGRAM AT LANGIS THE MAJORS Fully funded for drilling to target A strategic investment from the world’s IN ONTARIO Hog Heaven optioned to Ivanhoe high-potential copper and gold largest mining company validates
Slide 25: Monetization of Non-Core Assets
MONETIZATION OF NON-CORE ASSETS HOG HEAVEN (Montana) – Optioned to ATLIN GOLDFIELDS (BC) Optioned to Ivanhoe Electric Inc (“IE”) Copper-Gold-Silver Eldorado Gold (“ELD”) • IE can earn 75% by meeting the following earn-in obligations: USD • ELD can earn 100% by meeting the following earn-in obligatio
Slide 26: Thank You
THANK YOU www.brixtonmetals.com info@brixtonmetals.com Suite 551-409 Granville Street Vancouver, BC V6C 1T2 BRIXTON METALS INVESTOR PRESENTATION TSX-V:BBB | OTCQX: BBBXF | FR: 8BX1